24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,

Slides:



Advertisements
Similar presentations
L Bottura, M Buzio, JG Perez, A Masi, N Smirnov, A Tikhov, et al., “A Polarity Checker for LHC Magnets” IMMW 2005, 14th International Magnetic Measurement.
Advertisements

H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Enhancement of Single Stretched Wire Measurements of LHC Short Straight Sections Guy Deferne, Nikolay Smirnov, CERN Joe DiMarco, FNAL 14th International.
USPAS June 2007, Superconducting accelerator magnets Unit 21 Magnetic measurements and tools to control the production Soren Prestemon and Paolo Ferracin.
1 / 27 L.Angrisani University of Naples Federico II, ITALY 14th International Magnetic Measurement Workshop September 2005, Geneva,
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Rotating Coils - Giordana Severino – Rotating Coils PACMAN meeting Printed Circuit Coils – Future developments.
Angular orientation reconstruction of the Hall sensor calibration setup By Zdenko van Kesteren Supervisor: prof. dr. Frank Linde.
1 / 17 Author CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland Title.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Field Quality Working Group-14/12/04 - Stephane Sanfilippo AT-MTM-AS Field Quality measurements at cold. Standard program v.s extended tests. Presented.
Author CERN – Geneva – CH Jacques.Dutour 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland 1 / 16 MQW magnets:
Geneva, 12/06/ Results of Magnetic Measurements on MQXC 02 L. Fiscarelli on behalf of TE/MSC/MM section
Follow-Up and Checkpoints of Harmonics in Collared Coils and Cold Masses E.Wildner AT-MAS-MA.
L. Fiscarelli, S. Izquierdo Bermudez, O. Dunkel, S. Russenschuck, G. Willering, J. Feuvrier 22 nd September 2015.
AT Measurement Systems
1 J.DiMarco 16Nov2010 LQS01b Magnetic Measurements Results ( preliminary ) J. DiMarco 16Nov2010.
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
General Considerations for the Upgrade of the LHC Insertion Magnets
Magnet Design & Construction for EMMA
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
Brainstorming on the field model: MAS activities P. Hagen, E. Todesco, J.P. Koutchouk CERN, 24 h March 2006 Field quality Working Group.
L. Fiscarelli, O. Dunkel, S. Russenschuck, S. Izquierdo Bermudez, G. Willering, J. Feuvrier 21 st July 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
E. Todesco EXPERIENCE WITH FIELD MODELING IN THE LHC E. Todesco CERN, Geneva Switzerland Thanks to the FiDeL team CERN, Space charge th April 2013.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
Presentation 7/05/2015 Giordana Severino ESR2.2, WP2 CERN Supervisors Marco Buzio Academic supervisor Prof. Pasquale Arpaia.
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
Review of the Tests of Superconducting Magnets in SM18 14-January Measurements of Special SSS during production N. Catalan Lasheras Review of the.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
30 th of October 2015H. Prin. Click here to add footer 2 5 th Joint HiLumi LHC-LARP Annual Meeting 2015 Outline Plan for straightening MQXF magnets and.
Measurement of LHC Superconducting Dipole and Quadrupole Magnets in Ramp Rate Conditions G.Deferne, CERN Aknowledgements: M. Di Castro, S. Sanfilippo,
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
1 / 1 IMMW August 2007, Fermilab, Batavia, IL, USA CNAO R. Chritin CERN - Geneva Curved fluxmeter for static and dynamic characterization of pulsed.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
17 th April 2007 Nicholas J. Sammut Decay Prediction and Minimisation During LHC Operation University of Malta Field Quality Working Group with several.
Magnetic measurements on MBHSP104
A new QF1 magnet for ATF3 Alexey Vorozhtsov
Equivalent source corresponding to radiated field of EMC filter components September 16, 2010 Sanâa ZANGUI
MQXC Nb-Ti 120mm 120T/m 2m models
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Model magnet test results at FNAL
Geometric and Magnetic Measurements
Validated magnetic data at cold
DesignDRIVE Position Manager SIN/COS
FRESCA2 Update on the dipole design and new calculations
Large Booster and Collider Ring
DS11 T Transfer function, integral field and coil length
Pierre-Alexandre Thonet
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Yingshun Zhu Accelerator Center, Magnet Group
Alignment of the first two magnet system modules of Wendelstein 7-X
MQYY: superconducting Quadrupole magnet for Hl-lhc
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Field quality of LHC corrector magnets
News From IMP Magnet Test Stand
Magnetic measurements at ambient temperature on the MQXFBP1
Presentation transcript:

24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan, M. Buzio, P. Galbraith, D. Giloteaux, V. Remondino 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Outline Introduction Systems Description 24/11/2017 Outline Introduction Systems Description Measurements and Analysis Overview Performance: Local and Integrated Dipole Field High-order Harmonics Field Angle Experience Gained Conclusions 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

People involved 24/11/2017 Search coils manufacture (LHC/AT-MTM) R. Beltron, L. Gaborit Mole manufacture (AT & EST/ME) O. Dunkel, D. Cote, R. Camus, B. Girod, N. Mermillod, G. Patti, F. Fischer Software (AB/CO) and data reduction and analysis (AT-MAS) A. Rijllart, H. Reymond, A. Raimondo, E. Todesco, C. Vollinger, P. Hagen Bench for the mole translation inside quadrupoles (CEA/ Saclay) F. Simon Operators who did many measurements at CERN and outside in the assembly firms 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

The DIMM mole Slip rings Incremental encoder Gravity sensor 24/11/2017 The DIMM mole Slip rings Incremental encoder Gravity sensor Rotating coils Pneumatic brake 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

The search coils set for DIMM and QIMM 24/11/2017 The search coils set for DIMM and QIMM Dipoles Coils are 14.2 mm wide 3 coils per mole 25 moles built MQ, MQM, MQY & correctors Coils are 8.4 mm wide 5 coils per mole 12 moles built MQW (resistive) Coils are 7.4 mm wide 5 coils per mole 1 mole built 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Mole translation devices 24/11/2017 Mole translation devices Extensions - Manual Used for MQM, MQW, MQY Single mole, external rotating unit Measuring a magnet takes about 6 hours Cable – Automatic Used for MB 2 moles in parallel. About 2 hours per magnet. 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

QIMM Global view 24/11/2017 Coils and mole VME crate (integrators, ADC, IO, MXI, CPU) Coils bucking QIMM measuring a Short Straight Section SUN workstation Pneumatic brake Power Supply 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Systems characteristics review 24/11/2017 Systems characteristics review Characteristic DIMM QIMM Rotating unit placement internal external Number of search coils 3 5 Number of moles built 22 (+3 short) 12 Number of moles per system 2 1 Number of systems built 8 Search coil length [mm] 750 Nominal current [A] 10 12.5 Number of positions measured [750 mm sep.] 20 Search coil surface [m2] 3.7 1.97 Longitudinal positioning motorized manual 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Measurement and analysis overview 24/11/2017 Measurement and analysis overview Measurement procedure: Longitudinal positioning (auxiliary shafts or motor with StegmanTM) Orientation of mole to gravity Three Rotating coil measurements clock-wise and 3 anti clock-wise with both positive and negative currents (10 A→B1=7 mT or 12.5 A →B2=3.8 mT) Discrete Fourier Transform analysis on integrated voltage sampled signals (360 DIMM or 256 for QIMM) Harmonics normalization with respect to main field and gravity direction Harmonics normalization to magnetic centre (10th harmonics for dipoles or 1st for quadrupoles) and main field direction 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Performance Result DIMM QIMM 24/11/2017 Performance DIMM & QIMM are very efficient detecting magnet imperfection during CC measurement Field quality analysis detects misalignments and short circuits Corrective actions end in decollaring and repair CM measurement confirms CC one but Field angle measurement validate the magnet Repeated measurements intended to confirm assembly errors. Faulty measurements below 3 % Result DIMM QIMM Number of Collared Coil measured 919 314 Number of measurements on Collared Coil 1057 325 Number of Cold Mass measured 850 239 Number of measurements on Cold Mass Number of magnets with problems found in CC 67 11 Number of magnets with problems found in CM 6 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Local and Integrated dipole field 24/11/2017 Local and Integrated dipole field Local field measurement is very sensitive to assembly errors. Precision better than 10-4 Integrated field → longitudinal positioning precision → StegmannTM encoder precision better than 0.5 mm (Laser Tracker calibration) Magnetic length adjustment by adding or removing iron yoke laminations 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Measuring at the factories: example of assembly error 24/11/2017 Measuring at the factories: example of assembly error Main Field relative module: 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

24/11/2017 High-order Harmonics Search coils surface matching and their stability keeps precision better than 0.1 units. 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

Detecting defects – an example 24/11/2017 Detecting defects – an example Harmonics along the collared coils 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

24/11/2017 Field Angle In dipoles controls the vertical bending component (Tolerance 1 mrad) Needs good inclinometer (50 μrad) and stability during measurement (apertures parallelism) To be expressed in the geometrical coordinate system (absolute value) 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

24/11/2017 Experience gained More than half of the production passed. Firm 3 finished already Collared Coils and very soon the Cold Mass. Feed-back from firms operators very useful to minimize and optimize CERN interventions every 4-5 months. Several maintenance actions are done by firm technicians following our instructions. Three special, shorter moles (125 mm long search coils) produced to have better spatial resolution to localize defects. One per firm. DELRINTM feet improve the operation of mole orientation to gravity by its smaller friction coefficient than the originally used metallic feet. Jig tool to measure angular orientation of the cold mass on the warm magnetic bench is very useful to correct for eventual angular change between geometric and magnetic measurements benches. Mole calibrations show very good stability of the search coils characteristics and its positioning. 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland

24/11/2017 Conclusions Systems show good capability to detect early many defects in the industrial assembly of the LHC dipoles and quadrupoles main magnets Money savings greater than whole investment in the warm magnetic measurements System robustness keeps the maintenance frequency low (4-5 months) Hardware commonly available on the market. Software developed using industrial control system standards. Good warm-cold measurements correlation allows a drastic reduction of magnetic measurements test at cold, giving money and time savings 28/09/2005 J. GARCIA PEREZ CERN – Geneva – CH Juan.Garcia.Perez@cern.ch 14th International Magnetic Measurement Workshop 26-29 September 2005, Geneva, Switzerland