Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

Offsite Storage RAF/2013/00023 Compulsory Briefing Session 16 August 2013 The Road Accident Fund.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032 Date: 15 January 2013 Time: 11:00.
DBE ACHIEVEMENT Met Council PFA funded projects:
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session 05 August 2013 The Road Accident Fund.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
GENERAL SERVICES ADMINISTRATION USAContact Program Multi-channel Contact Center Services Pre-solicitation Conference Robert H. Corey Contracting Officer.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
HOW TO ASSESS SUPPLIER RESPONSIBILITY (TECHNICALLY & FINANCIALLY) Mariel D’Eustachio Dave Avera 3/28/00.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session 06 August 2013 The Road Accident Fund.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Indiana State Personnel Dept. CDL/Non-CDL Controlled Substance and Alcohol Testing Pre-Proposal Conference September 24, 2012 Greg Moorman IDOA Strategic.
What Small Method Is It? Presented by Jan Giffin, CPPO, CPPB, VCO eVA Business Manager And Katherine Bosdell, CPPB, VCO Statewide Contract Officer.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
JEOPARDY FINANCIAL MANAGEMENT EDITION Documentation Procurement Mystery Cost Principles Administrative Requirements Q $100 Q $200 Q $300 Q $400 Q $500.
Stockton University Purchasing and Grants 11/4/15.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Procurement & Strategic Sourcing Commercial Print Services
Pre-Bid/Proposal Meeting
Procurement & Strategic Sourcing
Offsite Storage RAF/2013/00023 Compulsory Briefing Session
Tender Evaluation and Award Process
REQUEST FOR PROPOSALS (“RFP”) CITY OF DANIA BEACH Bid No
Procurement & Strategic Sourcing Charter Bus Transportation Services
TRAVEL SERVICES Request for Proposal
Joint Parking Task Force Update Procurement & Strategic Sourcing
Security Equipment RAF/2012/00042 Compulsory Briefing Session
Memorandum of Understanding with GE Osmonics, Inc
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session The Road Accident Fund 06 August 2013.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Procurement & Strategic Sourcing
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
CSP – Remodel Gate Services Building for USDA at Bayport Terminal
CSB Wharf 11/12 Collision Repair at Turning Basin Terminal – DC 1170
Request for Proposal and Specifications for
Request for Proposal and Specifications for
Drainage Improvements at VW Yard (RFQ-101)
MANDATORY PRE-BID MEETING
Brenda C Trevino, P.E. PMP | Director, Technical & Business Analytics
Washington Metropolitan Area Transit Authority (WMATA)
CSP # 938 REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Bill Aguirre, P.E. | Project Manager | Project.
Procurement Planning Mani Ram Gelal
RFP-311 JDE Managed CNC Services
RFP – 1148 Disparity Study Services
Procurement & Strategic Sourcing
How To Do Business With The RCSS
Outagamie County Pre-Proposal Meeting
PURCHASE OF MISCELLAEOUS PERSONAL SAFETY EQUIPMENT FOR BARBROURS CUT TERMINAL, BAYPORT CONTAINER TERMINAL, AND TURNING BASIN TERMINAL.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session The Road Accident Fund 05 August 2013.
Diversity management system (DMS)
Presentation transcript:

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Introductions Harris County – Wage Rate Compliance Small Business Procurement Selection Criteria Site Parameters – Special Conditions Questions All attendees must sign in

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 PHA Personnel: Roger H. Hoh, P.E., - Director, Project & Construction Management Brock Lewis, P.E., - Chief Construction Manager Brenda C Trevino, P.E., PMP– Project Manager Pedro Gonzales, P.E., – Small Business Development Yvette Camel-Smith – Director of Procurement Harris County: Robert Rocha - Wage Rate Compliance

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Harris County Wage Rate Compliance and Requirements: Attendance at pre-bid meetings and pre-construction meetings Review and approve weekly certified payroll records Monitor wage rate compliance Review claims of non-compliance from the field and recommend appreciate responses as required or permitted under the Wage Scale Act

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Small Business Requirement: Small Business Participation for this project is a minimum of 15%. Prime Contractor must meet this hurdle to be considered for the job. Contact the Small Business Office, if you have difficulty in meeting the Small Business requirement. PHOTO OR GRAPHIC

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Procurement: Competitive Sealed Bids/Proposals (CSB/CSP) due October 26, 2016 no later than 11:00 A.M. One original and five copies packaged in one sealed envelope All proposals will be opened and ready publicly in the PHA First Floor Conference Room by Procurement Services – Wednesday, October 26th at 11:30 A.M.

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Due Wednesday, October 26, 2016 no later than 11:00 A.M.: Competitive Sealed Bid / Proposal Response: Page 1 General Information PHOTO OR GRAPHIC

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Selection Criteria The Port Commission will award the contract to the responsible bidder submitting the lowest and best bid. Responsible: 1. Meet the applicable Small Business Participation requirements; 2. Have the ability to comply with the required delivery or performance schedule, taking into consideration other business commitments; 3. Have a satisfactory record of performance and integrity; 4. Have a satisfactory safety and environmental record; 5. Have satisfactory references; and 6. Have the necessary facilities, equipment, material, personnel, organization, experience, authorizations, technical skills, and financial resources to fulfill the terms of the contract for the project.

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 Due Wednesday, October 26, 2016, no later than 11:00 A.M.: Competitive Sealed Bid / Proposal Response: Page 2 Required Attachments PHOTO OR GRAPHIC

at Industrial Park East 2017-2018 HERE

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 General Scope of Services:   Remove, install and monitor BMPs as appropriate; Prepare, repair potholes and pave new areas with asphalt; Clean out drainage ditches, culverts and inlets; Remove and dispose of excess soil on PHA property; Spray emulsified asphalt, when and where required; A schedule will be required for all parts of the work except the spraying of the emulsified asphalt.

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 General Scope of Services (continued):   Work accommodates tenants and weather; No work expected inside the secure area; Proper PPE will be worn at all times; Work is for 2 years (not divisible) Half for 2017, half for 2018 .

Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East 2017-2018 No photographs – leave cell phones in your pockets or purses! Stay with group Safety vests, hard hat, safety glasses No open-toed shoes Comply with your company’s safety policy!

QUESTIONS? Thank You & Questions