NATIONAL ROADSHOW EVENT The basic concept of EnPC-INTRANS project

Slides:



Advertisements
Similar presentations
Provincia di Milano - Italy The Provincial Activities for Energy Efficiency Bruna Brembilla.
Advertisements

Projects for the Promotion of EE and RES in Slovakia Energy Crisis and Climate Change – Challenges for Politics and Business in South East Europe Tutzing,
Budapest October 2, 2014 Irina Kotliar Energy efficiency in buildings. European support schemes.
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
Development of environmental companies in Hungary using different EU funds “Brussels meets Zagreb” Module 1, February 24-25, 2011.
Promoting Energy Efficiency in Buildings: the CEB’s Experience León Herrera Director of European Affairs Brussels - 19 June 2009.
ENERGY PERFORMANCE CONTRACTS Field Office Staff Training November 17, 2010 Tedd T. Termunde, P.A Joseph E. Nemedi, F.A.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Energy crisis and climate change; a challenge for policy makers and economy in Southeast Europe International conference; Southeast Europe Association.
Alabama Department of Economic and Community Affairs.
Monika Schönerklee-Grasser JTS CENTRAL EUROPE PROGRAMME The CENTRAL EUROPE Programme Staccato is a project of the concerto initiative co-funded.
Horizon 2020 Energy Efficiency Information Day 12 December 2014 Parallel session: Energy Efficiency in Industry (large companies and SMEs) – Topics EE16.
Energy Efficiency in the EBRD’s operations and opportunities for technical cooperation Aleksandar Hadzhiivanov, Energy efficiency specialist Energy Efficiency.
The European Bank for Reconstruction and Development: Regional Leader in its Countries of Operations Founded in 1991 after the disintegration of the Soviet.
BioRES - Sustainable Regional Supply Chains for Woody Bioenergy EU Horizon 2020 Coordination and Support Action 1 BioRES has received funding from the.
Financing Urban Public Infrastructure
BioRES Project: Sustainable Regional Supply Chains for Woody Bioenergy EU Horizon - Coordination and Support Action 1 BioRES has received funding from.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Management Board Meeting April 24-25, 2013 Hvar, Croatia SOLUTION is a project of the CONCERTO initiative co-funded by the European Commission under the.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
Regional Resource Efficient and Cleaner Production Demonstration Component EaP GREEN Program Malkhaz Adeishvili National Coordinator in Georgia 26 June,
Ján Magyar Department of International Relations in Energy Energy Section Ministry of Economy of the Slovak Republic , SK-NO Cooperation, Bratislava.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
EVN - Energy and Environment Services
Ralf Goldmann JASPERS Activities in the sector of Renewable Energy and Energy Efficency Jaspers Workshop 28 November 2007.
Transparense project No: IEE/12/678/SI , created 17/07/2013 Visit Increasing Transparency of Energy Services Markets Project.
Projects financing and implementation experience Dr.sc.ing. Ilze Purina Chairperson of the Board Latvian Environmental Investment Fund ____________________________.
Forum for Sustainable Mobility and Metropolitan Development Oradea, November 2013 JASPERS Teo Falato, Transport Sector Specialist.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Anni Podimata MEP Member, Committee on Industry, Research and Energy 8th Inter-Parliamentary Meeting on Renewable Energy and Energy Efficiency Budapest,
WHY IS IT IMPORTANT THAT LOCAL GOVERNMENTS ARE INTERNATIONALLY RECOGNISED IN THE POST-2012 GLOBAL CLIMATE AGREEMENTS The local and regional perspective.
Ukraine In-Depth Energy Efficiency Review VI International Specialized Trade Fair “ENERGY EFFICIENCY RENEWABLE ENERGY – 2013”, Kiev, 8 November 2013 Steivan.
EU/EBRD Municipal Finance Facility - Energy Efficiency ENVIRON CONSORTIUM Ildikó Adamecz Raj Partner, Director Corporate Finance BDO Hungary Advisory Ltd.
Funding for renewable energy and energy efficiency Peep Mardiste
1 Ukraine Higher Education Final conference Kiev 12 November 2015 European Investment Bank 03/02/2016.
Agentia pentru Eficienta Energetica si Energii Regenerabile Ploiesti- Prahova.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
CROATIAN EXPERIENCE IN OPERATING AN ENERGY EFFICIENCY FUND under the regime of the EED Article 7 Vesna Bukarica, Ph.D. Head of Energy Efficiency Sector.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
1 European Investment Bank EIB's support for Energy Efficiency & Renewable Energy Investment in cities and regions - European Local Energy Assistance (ELENA)
1 Town of Dedham Energy Saving Performance Contracting.
Know-how Transfer and Capacity Building for Renewable Energy & Energy Efficiency Renewables Academy AG (RENAC), Berlin.
Opportunities for renewable energy investments in Serbia
Enhancing Support to Energy Efficiency in the Western Balkans
7th International Scientific Conference on Energy and Climate Change
Local Leaders in South East Europe: Lead for Change
Uniper Energy Services
Energy Savings Performance Contracts & Energy Service Companies
2017/18 SIP Request Process September 2016.
EPC CONCEPTS and BUSINESS CASES
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
European Commission “Intelligent Energy for Europe”
DISTRICT COOLING A promising and sustainable option for HFC phase-down
Financing Sustainable Energy in Ukraine: EBRD Experience
Energy efficient renewal of multi-apartment buildings in Lithuania
The LEMON project, using EPC in Social Housing – October 18th 2017
The European Investment Advisory Hub Support to CEF Blending
Working on social inclusion with the help of EFSI
Giorgia Pasqualetto Project Associate Department of Energy UNIDO
EU Tyres labelling scheme
The London Green Fund – a JESSICA Holding Fund
Regulation for Smart Grids
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
EREK's Self-Assessment Tool Tourism sector (hotels and restaurants)
Reinhard Six, Energy Efficiency Division, European Investment Bank
Workshop - Marseille 24 May 2019 Innovative Financial Solutions.
Local authorities’ perspective
What has worked and what needs to be improved?
Energy Transition in BNP Paribas Bank Polska SA
Presentation transcript:

NATIONAL ROADSHOW EVENT The basic concept of EnPC-INTRANS project Croatia/ Slovenia/ Latvia Radoslav Vician e-code, Slovakia The basic concept of EnPC-INTRANS project 1

10 Partners from 9 Countries 27.09.16 10 Partners from 9 Countries Germany Ukraine Croatia Greece Slovenia Slovakia Serbia Romania Latvia

Objective of the Project 27.09.16 Objective of the Project Develop local capacities of municipalities to set-up and use Energy Performance Contracting (EPC) for the financing of investments in energy efficiency improvements in public buildings and services. Scope: Evaluation and adaptation of best practices, Stakeholder consultations, Road shows, Training of trainers, Webinars, E-learning, Seminars.

Project profile Project duration: March 2015 - February 2017 27.09.16 Project profile Project duration: March 2015 - February 2017 Project budget: 1.983 Million Euro Major milestones: Project kick-off meeting (April 2015), Baseline study completed and website operational (August 2015), Adapted business models approved (November 2015), Training concepts and programme approved (December 2015), Training programme completed (February 2016). Expected results: 2,000 experts trained on the demand side of EPC for public buildings and services, 500 new buildings covered by EPC projects triggered by trained experts. Expected impacts: 60-90 GWh energy saved per year, 60-90 million new investments triggered.

Energy Performance Contracting (EPC) 27.09.16 Energy Performance Contracting (EPC) “… is a form of ‘creative financing’ for capital improvement which allows funding energy upgrades [in whole or in part] from cost reductions.” (JRC-IET) “… is the procurement of works and services on the basis of net present value.“ (EBRD) Annual energy cost ESCO investment (20-40% guaranteed energy savings) EPC contract period (5-10 years) Energy cost prior to EE investment Energy cost after EE investment Continuous energy cost savings of the public building owner (20-40 %) End of EPC contract (investment paid back) Saved energy cost used for the repayment of ESCO investment (contracting fees) ESCO invests in EE improvements of public buildings on the basis of an EPC business model ESCO = Energy Service Company EPC = Energy Performance Contracting EE = Energy efficiency Source: GIZ JRC-IET = Joint Research Centre – Institute für Energy and Transport The mission of the JRC Institute for Energy and Transport (JRC-IET) is to provide support to European Union policies and technology innovation to ensure sustainable, safe, secure and efficient energy production, distribution and use and to foster sustainable and efficient transport in Europe. JRC-IET is carrying out research in both nuclear and non-nuclear energy domains, with partners from the Member States and beyond. In state-of-the-art experimental facilities, IET carries out key scientific activities in the following fields: renewable energies including solar, photovoltaics and biomass; sustainable & safe nuclear energy for current & future reactor systems; energy infrastructures and security of supply; sustainable transport, fuels and technologies including hydrogen and fuel cells as well as clean fossil fuel; energy techno/economic assessment; bioenergy including biofuels; energy efficiency in buildings, industry, transport and end-use. It is based both in Petten, the Netherlands, and Ispra, Italy, and has a multidisciplinary team of around 300 academic, technical, and support staff. EBRD = European Bank for Reconstruction and Development

EPC full service spectrum Energy Performance Contracting (EPC) Public building owners can finance energy efficiency measures in general by means of: Commercial and bank credit (loans) National or international subsidy programs and schemes, if available Own financing (budget-financed) Energy Performance contracting (EPC) MAINTENANCE & REPAIR FINANCING Financing is an important part of the services covered in an EPC. For many potential customers financing is the most attractive part of EPC services for public buildings. EPC full service spectrum PLANNING OPERATIONS RISK TRANSFER CONSTRUCTION ENERGY MANAGEMENT

EPC business models Guaranteed energy savings (compared to baseline) No investment (prior to investment stage) Planned investments

Current results of the project Stakeholder consultations – 443 stakeholders provided their feedback. Baseline study – used as baseline for the monitoring of impacts achieved by the project in terms of new EPC projects triggered in public buildings. Trainings of trainers – 51 trainers in Bratislava, Slovakia. Training programme: Webinars (A, B, C), on-site trainings (local languages), e-learning courses. Road show events – scheduled in the 2nd reporting period. Final conference – 15th November, 2016 in Stuttgart-Esslingen/ Germany.

EPC in public buildings in Slovakia Current situation Still low energy performance of public buildings Energy costs of public buildings in Slovakia – more than 300 mil. € Estimated savings Minimum 35% with the utilisation of EPC At least 60% after complex reconstruction In principle no EPC projects

EPC in public buildings in Slovakia Main findings from Slovakia regarding EPC Lack of information and understanding of EPC projects With good return rate but not attractive enough Structural funds (SF) seen by municipalities as a “magic potion” SF – 5% co-financing SF will not be for everyone SF will not be here forever

EPC in public buildings in Slovakia Main findings from Slovakia regarding EPC Less attractive but systematic and consistent Cheaper is not always better Business – business relationship – quality matters SF projects often financially overvalued and technically underdeveloped SF projects – no energy saving guarancies for the future

EPC in public buildings in Slovakia Main findings from Slovakia regarding EPC There is no way to do it without proper analysis Contracts are the crucial point Savings must be verifiable Templates help The supplier bears the risk

EPC in public buildings in Slovakia Main findings from Slovakia regarding EPC Monitoring pays back System cannot guarantee savings by itself Qualified human resources are another crucial point

EPC in public buildings in Slovakia Main findings from Slovakia regarding EPC Financial intensity of EPC projects makes them not always suitable for every situation Complex building reconstructions 40 – 60 % savings But long term return rates Technological renovations 20 – 30 % savings Return rates typically 8 years and lower

EPC in public buildings in Slovakia Psychiatric ward in the town of Plešivec Reconstruction of heating systems and water heating systems – replacement of the heating system combined with the water heating system, installation of regulatory heating systems, installation of an inteligent monitoring and regulatory system Reconstruction of laundry washing systems – complex reconstruction Use of own drinking water source – installation of new technology for the safety use of the water from own well

EPC in public buildings in Slovakia Psychiatric ward in the town of Plešivec Guaranteed savings – 1,484 Mwh/year Total savings in EUR – 132,000 EUR without VAT/year Total investment - 1,22 mil. EUR without VAT fully covered by the supplier Project preparation – 2009 – 2010 Project implementation - 2013 Contractual period – 10 years

EPC in public buildings in Slovakia Psychiatric ward in the town of Plešivec Preparatory phase Analysis of technical state of the buildings and energy systems Preparation of documentation for public procurement Public procurement EPC supplier – Siemens s.r.o. Financing 40% project European Energy Service Initiative 60% EPC supplier

EPC in public buildings in Slovakia Psychiatric ward in the town of Plešivec

EPC in public buildings in Slovakia Psychiatric ward in the town of Plešivec

EPC in public buildings in Slovakia Modernisation of heating systems and buildings in the city of Malacky City sports hall – modernisation of central heating system, heating systems overall (pipelines, etc.), ventilation and lighting City cinema – optimising of heating system, building insulation, replacement of windows and doors Centre of social services - optimising of heating system

EPC in public buildings in Slovakia Modernisation of heating systems and buildings in the city of Malacky Total investment – 0.442 mil. EUR without VAT fully covered by the supplier Project preparation – 2013 Project implementation - 2014 Contractual period – 10 years In the first 2 years the city of Malacky will co-finance investments in the amount of 68,898 EUR by the means of increased payments

EPC in public buildings in Slovakia Modernisation of heating systems and buildings in the city of Malacky

Thank You for Your Attention!!! More about EnPC INTRANS project: www.enpc-intrans.eu Radoslav Vician rado@e-code.sk www.e-code.sk