South Africa Wind Energy Programme (SAWEP)

Slides:



Advertisements
Similar presentations
GEF PROJECT TEMPLATES ANDGUIDELINES George Manful (PhD) Senior Task Manager, Climate Change UNEP UNFCCC Asia and Pacific Regional Workshop on Preparing.
Advertisements

URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
Overview of CABURESA Project Capacity Building for Renewable Energy SMEs (and End Users) in Africa Hotel Paradise on the Nile Jinja, Uganda 22 – 23 June.
NATIONAL CAPACITY BUILDING FORTHE DEVELOPMENT OF A NATIONAL IMPLEMENTATION STRATEGY FOR THE GLOBALLY HARMONISED SYSTEM OF CLASSIFICATION AND LABELLING.
The TerrAfrica/GEF Strategic Investment Programme for Sustainable Land Management in Sub-Saharan Africa (SIP) Presented by Samuel Wedderburn Prepared by.
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
1 Katherine Sierra Vice President, Sustainable Development Network The World Bank April 14, 2008 Proposed Climate Investment Funds (CIFs) Recap.
Schlosser & Pfirman, Nature Geosciences, 2012 Integrated Approach Pilots: Charting a New Frontier for the Global Environment.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
NCSA Project Management Committee Meeting Yasmine Abdel Aziz Deputy Project Director 21 st January, 2006.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
PROJECT GRANTED UNDER INDO-EUROPEAN COOPERATION ON RENEWABLE ENERGY.
Green Fund Progress and Lessons “Impacts of Investment” NCPC, 22 July Durban.
Evaluation Office 1 Evaluating Capacity Development David Todd Senior Evaluation Officer GEF Evaluation Office.
The Adaptation Policy Framework Bill Dougherty Stockholm Environment Institute – Boston Center Manila April 2004 An overview of the new UNDP-GEF product.
PEI Regional Meeting, September, Panama UNDP-UNEP POVERTY-ENVIRONMENT INITIATIVE PEI next phase 2013 – 2017 Preparations and way forward Poverty.
South African Wind Energy Programme A Otto 2 nd Annual Wind Energy Seminar 28 September 2010, Gallagher.
Project Overview, Objectives, Components and Targeted Outcomes
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
The UNDP Facility Activities and Opportunities in Africa Wind Energy Seminar October 2004 Martin Krause; UNDP-GEF Climate Change Coordinator Southern.
1 Overcoming Challenges in Preparation and Implementation of NAMAs Kigali, 17 th August 2015 African Regional Workshop on NAMAs.
Financing for National Communications UNFCCC Workshop, Manila Ravi Sharma United Nations Environment Programme – Global Environment Facility.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Capacity Enhancement and Mobilisation Action (CEMA) for the Africa EU Energy Partnership (AEEP) Lawrence Agbemabiese UNEP-DTIE, France.
Republic of Kenya 1 ST DBA- AFRICA MANAGEMENT REVIEW INTERNATIONAL CONFERENCE RESEARCH AND INNOVATION FOR SOCIO-ECONOMIC DEVELOPMENT IN AFRICA Eng.
Global Environment Facility Climate Change 14 May 2004 Siv Tokle GEF Monitoring and Evaluation Unit.
AfDB-IFAD Joint Evaluation of Agriculture and Rural Development in Africa Towards purposeful partnerships in African agriculture African Green Revolution.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
Corporate-level Evaluation on IFAD’s Private Sector Development and Partnership Strategy 6 th Special Session of the IFAD Evaluation Committee 9 May 2011.
Piloting Integrated Processes and Approaches To Facilitate National Reporting to Rio Conventions – a GEF/UNEP project CBD SBSTTA 14 May 2010, Nairobi,
Regional Centers for Evaluation Capacity Development Regional Centers for Evaluation Capacity Development A Multilateral Initiative June 2009.
Szilárd Árvay Ministry of Foreign Affairs of Hungary.
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
The UN-REDD Programme: Capacity development for REDD+ readiness through partnerships Yemi Katerere, Head UN-REDD Programme Secretariat Briefing to Missions.
STRATEGIC PLAN 2007/8 A Presentation to: THE PORTFOLIO COMMITTEE ON COMMUNICATIONS 30 MARCH 2007.
Liverpool City Region Employment and Skills opportunities 5th July 2016 Rob Tabb.
Presentation title Enhancing synergies towards climate action and sustainable development on the ground GEF Expanded Constituency Workshop Da Nang, Vietnam,
Presentation title 9. Defining a country-specific NAP process: rapid stocktaking using a sample NAP process to identify building blocks, workstreams and.
GEF Support for Renewable Energy in SIDS and The Paris Agreement
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
Building a Sustainable Funding Model
South Africa’s Climate Change M&E System Framework 19 April 2017
Template Contents of the Low Carbon Development Strategy (LCDS)
European Commission “Intelligent Energy for Europe”
THE SELF SUSTAINING NON-PROFIT Golden Lessons From the Development and Corporate Sectors 14th Eastern Africa Resource Mobilization Workshop Paper.
ADAPTATION TO CLIMATE CHANGE
Capacity-building Initiative for Transparency
Progress of ACE II, and Program Overview
Translating political objectives into sound policy proposals
2017 Board Meeting: UNDP Programme on Climate Information for Resilient Development in Africa (CIRDA) Dr. Bonizella Biagini CIRDA Manager 16 February 2017.
11/18/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY PORTFOLIO COMMITTEE – 02 MAY 2018.
PUBLIC HEARING - INTELLIGENT ENERGY FOR EUROPE
The SWA Collaborative Behaviors
Implementation of the UN DA 10 project “The African context”
Strengthening the International & National Financial Architecture for SIDS Lia Nicholson, Project Consultant Department of Environment Antigua and Barbuda.
UNDP-UNEP POVERTY & ENVIRONMENT INITIATIVE (PEI): MID-TERM REVIEW
4.2 CLIMATE SERVICES, ACTION AND RESILIENCE
CLEAR Centers for Learning on Evaluation and Results
Considerations in Development of the SBSTA Five Year Programme of Work on Adaptation Thank Mr. Chairman. Canada appreciates this opportunity to share.
Building Statistical Capacity UNSD perspective
Template and Process for Expression of Interest by Countries
eEurope 2005 What’s new? What’s still important?
GEF – 7 Propose projects/Concept Notes
Millennium Development Goals (MDGs)
GSF Results and Financial Monitoring Workshop
Coordinated Engagement
Director-General: Mr. E Africa
Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO
UNFCCC Needs-based Finance (NBF) Project
How transformational change promotes ambitious NDCs
Presentation transcript:

South Africa Wind Energy Programme (SAWEP) UNDP Project Partners Learning Exchange on the Global Environment Facility (GEF)SARETEC Study Tour 23-24 January 2017

Outline Background SAWEP Phase 1 (2008 – 2010): Outcome SAWEP 1 lessons SAWEP 2 (2015 – 2019) SAWEP 2 Components SAWEP 2 Context SAWEP 2 updates, budget “shortcomings”

Background 1995 1st Wind Atlas – mostly moderate to some good coastal wind 1996 Private developer approached DBSA for support of Darling Wind farm demo 1997 SA ratified UNFCCC - make it eligible for GEF support 1998 White Paper on the Energy Policy (research and development of alternative and renewable energy sources promoted) 1999 Darling Wind farm PPA with Eskom not successful 2000 Minister declare Darling Wind Farm a national demonstration project with request for Danced and GEF support 2001 Danced (Danced USD180,000 and GEF (PDF B) USD295,000 support (remove barriers to large-scale commercial wind energy generation in SA & preparation of UNDP/GEF full size project) 2003 White Paper on Renewable Energy Policy (10 000 GWh (0.8 Mtoe), 1667 MW) renewable energy contribution to final energy consumption by 2013, 2008 to 2010 SAWEP Phase 1, GEF USD2 million (USD560,000 Guarantee grant), USD10 mill co-financing (Darling investment) 2008 Darling Wind farm commissioned (debt, equity, grants, PWA with Eskom and PPA with City of Cape Town 2010 IRP 8.4 GW new build wind by 2030

SAWEP Phase 1 (2008 – 2010): Outcome Support through the Green Power Guarantee Fund at the DBSA that enabled the City of Cape Town to sign a 20 year Power Purchase Agreement with the Darling Wind farm, South Africa’s 1st IPP wind farm and still operating today. The Darling Wind farm broke the ground for other wind IPPs that followed later on and supported through DoE RE IPPPP. The public recognition and confirmation, through the work of WASA 1 (project of SAWEP 1) by the DoE Minister in her speech that was delivered by Acting DoE DG at Windaba 2014 that South Africa has an excellent wind resource and captured in the WASA 1 booklet http://www.wasaproject.info/docs/WASABooklet.pdf that was launched in Sept 2015. WASA 1 masts still operating today and building up a long term, uninterrupted, wind data base for South Africa which is particular useful for studying the seasonal and prediction of climate change impact on SA’s wind resource which is of great importance for long term energy policy and growth of the wind industry in SA SAWEP 2 recognized in the report of the Secretary General's High Level Advisory Group on Climate Change Financing 2010 as one of 5 examples globally of 'Spending Wisely' on climate finance. Formulation of SAWEP 2 focussing on DoE RE IPPPP, completion of WASA, Small scale wind development, training and education

SAWEP 1 lessons 1: Catalytic impact Catalytic impact: SAWEP provided key necessary information, knowledge, tools, and capacities for an enabling wind sector environment; however, as always, the catalytic impact is highly sensitive to the high-level decision makers and here SAWEP in come instance was highly successful (e.g. in including relevant Ministers on several occasions), in others not so (e.g. in getting involved in the key decision making processes leading to e.g. REFIT, PPA, etc.) Lesson learned (process): Programme management (project manager, PMU, donor, etc.) has to keep trying to get key high-level decision makers on board, some times it succeeds, some times not, but that is not the key issue, the key is the continuous attempts with the multiple different techniques such attempts can use (inclusion in seminars, work groups, technical questions, working more closely together on e.g. less political issues, etc). SAWEP programme management did throughout project implementation continue to push for high-level inclusion

SAWEP 1 lesson 2: Benefits Delivery of direct and indirect benefits: The direct benefits to the private wind sector stakeholders come mainly from private sector investments and governmental incentive schemes, e.g. REFIT. SAWEP has little influence on these direct benefits, and might even, if as planned for the SAWEP through direct feasibility support to individual wind developers, become entangled in situations and games of who to benefit, who not Lessons learned (design): Project design has to carefully consider the type of programme to be implemented, direct or indirect support to key private sector stakeholders, and should not mix these into one project as professionalism on both issues might suffer. The programme, correctly, choose to only support the wind industry indirectly through TA, removal of barriers, etc.

SAWEP 1 lessons 3: Adaptive management Adaptive Management: The management of SAWEP effectively adapted to the needs and circumstances as they were expressed during implementation. Therefore, the actual project implementation indeed differed substantially from the initial design, but the actual intended impact remained similar Lessons learned (process): The dynamics of the project’s environment shall always be considered and flexibility for adaptive management granted. UNDP and DoE provided the platform for these necessary adjustments during project implementation Lessons learned (design): The overall aim of the project remained valid, but the overall objectives (CO2 reduction, number of MW installed, etc.) did not, and this provides for potential misunderstandings and dangers (e.g. as the outcomes were not reformulated, could this evaluation have rates the project very low!). One lesson learned here is that outcomes should have been reformulated. Another is that the outcomes formulated in the design phase were highly unrealistic and impractical as they did not link (LFA-wise) to actual planned, outputs, activities and inputs

SAWEP 1 lessons 4: Project manager Choice of Project Manager: Selecting the right project manager is invaluable for the project’s success. Both the SAWEP project manager, and the flexible functioning of the PMU, contributed to the creation of mutual confidence between the manager, the executing partners, and the many wind sector stakeholders providing the ground for impact and relevance of outputs Lesson learned: This time lucky!

SAWEP 1 lessons 5: Coordination Coordination with parallel initiatives: Projects can be complemented substantially by other initiatives - nationally funded or funded by bilateral/multilateral aid - even if they are not properly identified at the project design. This certainly was one to the main achievements of SAWEP, the effective coordination with numerous key stakeholders on many different levels (national, provincial, local, interdepartmental, etc.), within many different professional spheres (policy, research, private sector, financing institutions, etc.) and with many different financial and donor stakeholders, all with the aim to become lead donors / financiers to the renewable energy sector at national level. SAWEP is one of only very few international projects in South Africa that actually managed to establish successful donor co-funding during implementation Lesson learned (design and process): Coordination with parallel initiatives should be attempted designed into the projects from the beginning, not being the sole responsibility of the project manager during implementation.

SAWEP 2 (2015 to 2019) DoE Executing Agency, UNDP support services, SANEDI program manager support USD3.5 mill, USD35 mill co-financing PPG develop over 2013/14 Prodoc approved May 2015 to May 2019 (4 years), Prodoc signed Des 2015, PM appointed Aug 2016 (less than 3 years left for implementation) Main Objective: To support progress towards the IRP 2010 target of 8.4 GW (new build) wind capacity by 20130 (updated IRP 2016 37GW wind by 2015)

SAWEP 2 Components Components:Component 1: Monitoring and Evaluation of the implementation of local content requirements Component 2: Resource-mapping and wind corridor development support for policy-makers: Component 3: Support for the development of small-scale wind sector Component 4: Training and human capital development for the wind energy sector

SAWEP 2 Context SAWEP Phase 1 started with a “zero” basis wind industry in South Africa and its projects (e.g. support of the Darling Wind farm, start of the Wind Atlas for South Africa (WASA) focused on creating an environment for sustainable wind energy development in South Africa whereas SAWEP 2 came in at a time that the wind industry development is already high up the learning curve. The focus of SAWEP 2 and approach to implement its 4 identified components should then be to identify where the gaps and opportunities in the South African wind industry are and to focus on closing those gaps thereby strengthening and enhancing the environment for sustainable wind energy development in South.

SAWEP 2 updates, budget “shortcomings” SAWEP PPG developed 2013/14. Updates and adjustments to SAWEP 2 components, outputs and activities were then identified with key stakeholders prior to and as reported in the Inception Workshop report. The SAWEP Prodoc to be updated accordingly. SAWEP 2 budget does not provide, as in SAWEP 1 for reporting costs (e.g. printing) and also not for Miscellaneous expenses (information banners, pamphlets) nor project workshop e.g. catering costs

Andre Otto, andreo@sanedi.org.za, 0828770128