Why Things Change Transmission Assets

Slides:



Advertisements
Similar presentations
United Nations Statistics Division/DESA
Advertisements

Creating and Submitting a Necessary Wayleave Application
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
1 This presentation outlines the required activities for customers to confirm their allocations data. Customer Walkthrough (Confirm Allocations)
FileSecure Implementation Training Patch Management Version 1.1.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Draft Policy Standardize IP Reassignment Registration Requirements ARIN XXVI 6 October, 2010 – Atlanta, Georgia Chris Grundemann.
Ordering Tool Guideline
Transmission Pricing Methodology Presentation to the Electricity Commission Conference 26 April 2007.
Accounting (Basics) - Lecture 10 Transition to IFRS for SMEs.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
National Enrolment Service (NES) Overview October 2015 – June 2016.
Customer Charge On behalf of all DNs 25 October 2010.
132KV GSS PIPAR CITY JODHPUR
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Minor projects proposed approach.  Purpose of the session is to provide an overview of the proposed process for the review of Transpower’s minor projects.
FERC Docket No. EL PJM Interconnection, L.L.C. Paper Hearing Regarding 7 th Circuit Remand.
Submission on the draft ODV Handbook WEL Networks 14 th April 2004.
Nodal Planning Go Live Austin, TX February 3, 2011
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Standard Operating Procedure
Market Trials Update NATF March 2,
Cost reflectivity of investment proxies
Sub Station.
Insurance IFRS Seminar Hong Kong, August 3, 2015 Eric Lu Session 18
Auditing & Investigations II
Solomon Training for Teachers
Running a Forms Developer Application
Training Documentation – Replacing GSPR with RFQ 2.0
SUB-STATIONS.
Annual Pricing Process Stage 3: Publish Prices
Academic Vacation and Sick Leave Maintenance Instructions
POGO TECHNICAL SUPPORT
B4.2 Power System One-Line Diagrams
Chapter # 25 Sub-Stations risemark.pbworks.com.
John Dumas Director, Wholesale Market Operations
Preparing Your TAM Plan
Ensuring Security of Supply in Estonian Transmission Grid
EE6501 POWER SYSTEM ANALYSIS
Gmail Tech Support Phone Number. Why Your Gmail Account Not Working? If your Gmail Customer Support account is not working, you may be.
M.Com, LL.B, F.C.A, A.C.M.A, A.C.S, DISA (ICA), Ph.D.
& Transient Voltage Recovery Capacitors
Using the MOT Testing Service
(edited by Nadia Al-Ghreimil)
Fixed Assets Policies and Procedures for Fixed Asset Purchases
Garmin Support Service in Australia Call for
Connect With Adobe Customer Service Toll Free Phone Number
Orders & Shipment Tracking
Start the recording …………………………….
NHS e-Referral Service (e-RS)
Customer Walkthrough (Confirm Allocations)
Industrial Automation
LDZ System Charges – Structure Methodology 26 July 2010
To the ETS – PNG Continuation: Online Training Course
September 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG6 Proposed MAC comment resolution]
Pryaska Veramoothea André Breytenbach
Control of Hazardous Energy
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Attendance Conference Murfreesboro Embassy Suites April 20, 2018
Overview of Networking
Best B2B Data Appending Services - ProDataLabs +1 (669) |
Best B2B Data Appending Services - ProDataLabs +1 (669) |
Transition year options
CAWG Teleconference – January 5, 2011
Blue Goose Technology Solutions, Inc.
Unit J: Creating a Database
Community-Engaged Partnership Database: VCU’s Commitment to Community Engagement
Test Design Techniques Software Testing: IN3240 / IN4240
Prepared by: Ismael K. Saeed
Presentation transcript:

Why Things Change Transmission Assets Change is inevitable - except from a vending machine Robert C. Gallagher

Why Things Change The purpose of this presentation is to provide further insight into the reasons for the changes highlighted on the Transpower Asset reports The main reasons for these changes are: asset values switch counts interconnection substation asset allocations new or removed assets description changes

Asset Values New Assets - If a new asset has been installed on the grid the value will be the full building block value for that asset type Asset Value Deleted – It is Transpower’s policy to hold the value of Spares, Local Service and Load control assets at zero NB – this may show up as a change from last year due to the timing of the policy rollout Increase in existing asset value - An existing asset will increase in price if: i. a component part of that asset is replaced or upgraded (e.g. the circuit breaker of an HO1 switch) ii. the existing asset value has had an adjustment factor applied during the transition from ODV to the TPM methodology (current asset is not at full building block value) The increase in value will be the full BB value of that component part

Switch Counts Each switch asset contains a default number of switches based on the appropriate building block. The number of switches is made up of one or a combination of the following: Circuit Breaker default Bus default Infrastructure default A review process is undertaken annually to ensure that the switch count allocated to a specific asset correctly reflects the relevant building block default. If an error is identified, the switch count is updated. A list of building blocks and their associated switch counts has been provided in the Useful Resources section of the website

Interconnection substation asset allocations At an interconnection node, the substation asset (land, buildings, establishment and possibly oil containment) is allocated to connected customers based on the proportion to which the customer’s connection assets (at that substation) account for the replacement cost of all grid assets (excluding land & buildings) (TPM 3.59.2 c) If there is any change in assets, i.e. addition, deletions, or value changes, the % allocation may change

Asset Descriptions An asset ID may be updated to provide a more accurate description of that asset e.g. BZP3 is changed to BZ3P42 (P42 is the asset building block)

Building Block Classifications A review process is undertaken annually to ensure asset building block descriptions correctly (or as closely as possible) reflect the physical assets installed at a GXP. If an error is identified, the building block description for that asset is corrected

New Assets No Value A review process is undertaken annually to ensure that the “pricing” assets correctly (or as closely as possible) represent the physical assets installed at a GXP If there is a missing asset, a new “pricing” asset is created. If there is either duplication or a separate asset is in fact a component of another building block (e.g. D59 220kV bus CVT is a component of a DO1switch), then the duplicate asset is deleted. In the case of the VT example, if the switch is not valued at the full BB value, the VT value is added to the switch

Thank you again for your assistance. We hope you have found this presentation useful. If you have any questions, your customer solution manager is only a phone call away.