PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
BPM Upgrade Presented by: Nadine Kurita Contributors: S. Smith, S. Ecklund, J. Sebek, D. Martin, R. Hettel, R. Johnson, N. Reeck, M. Kosovsky, D. Arnett.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Safety Oversight for SLAC Accelerator Department Operations
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
PEP- II Linac Accelerator Systems Department PEP-II Overview and Future Plans John Seeman SLAC Particle and Particle-Astrophysics DOE PEP-II Operations.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
(on behalf of the DAFNE team)
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
Linac possibilities for a Super-B
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Operational Experience with the Cornell ERL Injector SRF Cavities
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
PEP-II RF System Status and Upgrades
PEP-II Status and Plans e+e- Factories Workshop
Luminosity measurement at LHC (The machine point of view)
Interaction Region Design Options e+e- Factories Workshop
Luminometer Integration at IR2
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
Summary of Washington DOE Review
Super-B Accelerator Overview
SuperB IRC Meeting Frascati, Nov. 13th 2007
Commissioning Issues of BEPCII
Super-B Factory in a “4400m” Tunnel
Proposal for a CESR Damping Ring Test Facility
JLEIC Main Parameters with Strong Electron Cooling
Some of the Points Raised During my JLAB Visit
Presentation transcript:

PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics DOE SLAC HEP Program Review June 6, 2006

Topics Overview Present status Long range schedule Upcoming fall down activities Conclusions

The PEP-II Team Accelerator Systems Division SLAC Support Groups BaBar LBNL ILC Machine Advisory Committee 1x1034

Internal Citizen Committees and Subject Matter Experts Safety Overview Radiation Safety Non-Ionizing Radiation Safety Hazardous Experimental Equipment ALARA Electrical Safety Earthquake Safety Fire Protection Safety Hoisting and Rigging Safety Environmental Safety Radiation Safety Officer Laser Safety Officer Electrical Safety Officer Fire Marshal Crane Inspector ESH Environmental Protection Department ESH OSHA Experts ESH Industrial Hygienists Emergency Management Coordinator

Recent and Near-term External PEP-II Reviews BaBar International Finance Committee January 20, 2006 BaBar Collaboration meeting February 25, 2006 DOE P5 Review April 21, 2006 DOE PEP-II Operations Review April 26, 2006 DOE HEP Program Review June 6, 2006 BaBar Collaboration meeting June 24, 2006 BaBar International Finance Committee June 26, 2006 PEP-II Machine Advisory Committee 1) Jan 4-6, 1995 2) August 24-25, 1995 3) April 11-13, 1996 4) January 6-8, 1997 5) November 10-13, 1997 6) December 14-16, 1998 7) October 9-11, 2003 8) April 15-17, 2004 9) December 13-15, 2004 10) January 16-18, 2006 11) Late fall 2006

PEP-II e+e- Collider Overview BaBar Detector

PEP-II RF Cavities PEP-II LER RF

PEP-II Interaction Region Components near BaBar LER HER BaBar Collision point

How the beams enter and exit the PEP-II Interaction Region M. Sullivan

B-Factory Overall Parameters Parameter PEP-II (LER/HER) Circumference (m) 2200 Beam energy (GeV) 3.1/9.0 Number of bunches 1732 Beam currents (A) (e+/e-) 2.9/1.76 Horizontal emittance (nm) 30/45 by* (mm) 9/11 Bunch length (mm) 11 xy 0.065/0.045 IP beam sizes (microns) (x/y) 120/4 Luminosity (x 1033/cm2/s) 10.9

PEP-II Long Term Run Schedule Run 5b: November 14, 2005-August 21, 2006 Down: September-December 2006 Safety checks Major upgrades for PEP-II Major upgrades for BaBar LCLS installation Run 6: January-August (or September?) 2007 Down: September-November 2007 Run 7: December 2007-September 2008.

Luminosity: Run 5 April 2005 – June 2006 1.09 x 1034 Vacuum issues found fixed Luminosity

PEP-II Luminosity versus Time > 1 x 1034 LER current Luminosity HER current

1.088 x 1034

M. Sullivan

Prediction March 2006 Actual

PEP-II Luminosity Integration

PEP-II Machine Advisory Committee Meeting: January 18-20, 2006 Members: D. Rice (chair), J. Corlett, K. Harkay, S. Henderson, I. Koop, J. Marriner, K. Oide, D. Rice, D. Rubin, L. Bertolini, F. Pedersen, P. Raimondi, F. Zimmermann, Report available. Words from the report: Impressive progress in all areas since the last the review a year before. Congratulates achievement of 1034 luminosity (3.3 x design). Trickle charge injection is very effective. Accelerator plan is sound for optimizing the collider productivity though FY2008 Vacuum burst studies are being intensely investigated. [Committee made several suggests what to look for.] Suggest re-examine increasing the specific luminosity.

Highlights of the PEP-II DOE Operation Review April 2006 PEP-II has a solid past track record on achieving milestones. Adequate man power is in place but must be watched. Adequate management systems in place for communicating priorities, tracking progress, and resolving problems. The integrated luminosity trends in FY2006 should be (just) sufficient to reach the FY2006 DOE milestones. (Still true.) Encourages the emphasis on accelerator lattice modeling for improving the peak luminosity, i.e. specific luminosity. (Recent luminosity records made with smaller beam currents.) Increasing luminosity with higher beam currents and shorter bunches is a concern for vacuum heating. (More studies are underway. Adding more HOM absorbers in the IR and BPMs.) Concerned about the short length of the fall down. (Added a work week to the down and a “float” week.) Need to maintain reliability. (New look at all spare part inventories.) Develop scenarios for minimum and maximum integrated luminosity predictions though September 2008. ( In progress.) Provide a SLAC-wide staffing plan through FY2009. ( In progress.)

Two Vacuum Issues in December 2005 – March 2006 Two major vacuum problems developed in the month of December limiting the peak luminosity to about ~0.5 x 1034/cm2/s: Gap ring (RF seal) problem near LER RF cavity caused e+ beam instability Higher Order Mode absorbing bellows caused vacuum bursts in IR The first problem was quickly identified (~ 2 weeks) and solved in late January. The second problem was thoroughly investigated, replacement parts manufactured, and repaired in late March with elapsed time of about three months.

Location of the First Vacuum Problem Vacuum spike area RF seal installation procedure problem

Second Vacuum Event: BaBar Background Trip Spikes

IP Vacuum Issue Resources Help from many groups: PEP-II, BaBar, Material Science Group, Klystron Dept., High Power RF Group, Vacuum Dept., Pulsed Kicker Group, and LBNL. Many studies done: Beam current thresholds Beam instability identification External leak checks Transient leak checks during spikes Gas pressure profiles Gas pressure flow rates Gas injections (puffs) (He, N2, Air) (various locations) Transient gas analysis during spikes NEG pump heating to make H2 gas Background timing with BaBar Borescoped 100 m of vacuum chamber (several times) Replaced RF seals and four vacuum chambers SiC-AlN HOM tile lab tests and thermal calculations This vacuum problem was the most subtle and hard to diagnose problem PEP-II has had. However, we solved it in a timely way over two months with a strong team. In the end as will be shown later, the chamber at fault was anticipated to be a long term problem and was scheduled to be replaced in Fall 2006 (AIP project). (The problem came 6 months too early!)

LER Forward Q4 Location

“Discharge” on Absorbing Tile SiC/AlN HOM Tile Arc site Cu heat sink RF seal fingers

New RF seal to correct problem: New seat on Cu base not tile N. Kurita

New Q1/Q2 bellows unit for Fall 2006 Absorbing tiles behind fingers N. Kurita A. Novokhatski S. Weathersby

Future PEP-II Overall Parameters and Goals Units Design Present best 2007 goal I+ mA 2140 2940 4000 I- 750 1776 2200 Number bunches 1658 1732 by* mm 15-20 10 8-8.5 Bunch length 15 11-12 8.5-9 xy 0.03 0.047-0.065 0.054-0.07 Luminosity x1033 3 10.9 20 Int lumi / day pb-1 130 760 1300 3.6 times design 5.8 times design

Goal: A factor of two in PEP-II luminosity PEP-II Upgrades Goal: A factor of two in PEP-II luminosity (1.1  2 x1034/cm2/s) will come from: Increasing each beam current by 40%. Lowering by* from 11 to 8.5 mm giving 20%. Increasing the beam-beam parameters by 10%. Keeping detector backgrounds at the predicted levels. Maintaining (and improving) accelerator reliability.

Integrated Luminosity Projection March 1, 2006 2007 down 2006 down Now

Accelerator Improvement Projects on track for Fall 2006 X-Y BPM upgrades 2005-2006 New HER Q5 vacuum chambers 2005-2006 New HER/LER Q2 chambers 2006 HER-10 RF station 2006 HER-11 RF station 2006 HER power supply upgrade for higher tunes 2006 New HER Q4 vacuum chambers 2006 New IR2 Q2 bellows 2006 LER IR HOM absorber 2006 HER IR HOM absorber 2006 LER BPM monitor upgrade 2006 LER new high power bellows 2006 LER NEG vacuum chamber upgrade 2006 New Longitudinal feedback processor 2006 Cost of these AIP projects is about 7 M$ spread over FY2006 and FY2007. PEP-II AIP expenditures from 1999-2005 averaged about 5 M$ each year.

B-Factory RF Klystrons (1.2 MW) under construction C. Pearson

RF Cavity Production Finished cavity ACCEL Germany Ports to be welded Cavity bowls welded together. Cavities due at SLAC in one month. H. Schwarz, A. Hill

Example: HER QF5R Chamber (Fall 2006) Specifications Construction: Now on vacuum bake. R. Pope Design

New LER Beam Position Monitors New button design HOM absorber Button puller design N. Reeck M. Kosovski N. Kurita

PEP-II Accelerator Technology for Future Accelerators High beam currents World record e+ current (2.95 A) World record e- current (1.78 A) High power vacuum chamber design Large number of bunches World record number of colliding bunches (1732) Very fast and strong bunch-by-bunch feedbacks (4 nsec) Electron Cloud Instability (ECI) cures (solenoids, antechambers) High power RF systems >1.2 MW CW klystrons 476 MHz High power Cu cavities (600 kW) Complex interaction region design with two rings PEP-II provides continued strong input into new accelerator designs: ILC damping rings, low emittance light sources (PETRA-3), Super-B Factories, eRHIC, LHC ECI, BEPC-II, …

PEP-II Conclusions PEP-II achieved a new luminosity level (1x1034) in October 2005 and set several integrated luminosity records. Run 5b started well but two serious vacuum problems occurred keeping the luminosity peak to about half the former peak. Both vacuum problems have been identified with the help of many people and experiments and have been solved in a timely way. Over the past two months, the luminosity has risen steadily to new PEP-II records of 1.09 x1034 with several 760 pb-1 days. Issues from the MAC review and DOE Operations Review are being addressed. Planned upgrades towards ~21034 are on track. Run plans are in place with a target of ~1 ab-1 in 2008. We strongly believe that the combined performance of PEP-II and BaBar will remain competitive through 2008.