Airports Economic Regulatory Authority of India

Slides:



Advertisements
Similar presentations
Public, private or mixed model ?
Advertisements

Gender Perspectives in Introduction to Tariffs Gender Module #5 ITU Workshops on Sustainability in Telecommunication Through Gender & Social Equality.
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Efficiency of Delhi International Airport Using Data Envelopment Analysis: A Case of Privatization and Deregulation By Somesh.K.Mathur JMI New Delhi,India.
Airport Financial Management
Regulatory Regimes on Airport Tariff ADC & HAS AIRPORTS INC. MICHAEL HUANG.
Is rail freight an essential service? Paul Fearon Chief Executive Officer Essential Services Commission.
International Civil Aviation Organization Funding of Regional Safety Oversight Organizations Simon Clegg General Manager Government & Strategy Civil Aviation.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Modernization tasks of railway transport regulatory model Novikov Sergey Head of the FTS of Russia Moscow October, 24-25, 2013.
1 Directorate-General for Energy and Transport / Air Transport Directorate EU Directive on Airport Charges Background and content.
LECTURE. FORMATION OF PRICE FOR THE COMPANIES PRODUCT Plan lectures 1. Price and types of prices 2. Classification prices 3. Pricing policy of the enterprise.
ZHRC/HTI Financial Management Training
Annual Public General Meeting 2014 Financial Presentation May 7, 2015 VICTORIA INTERNATIONAL AIRPORT.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Problems of regulating tariffs for housing and communal services, which create obstacles for developing sub national borrowing March 6, 2007 Alyona Babak,
Financing Urban Public Infrastructure
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
INDIA’S INFRASTRUCTURE – Issues and Prospects PRESENTATION BY SS Kohli Chairman & Managing Director INDIA INFRASTRUCTURE FINANCE COMPANY LTD NEW DELHI.
Agreement on Anti-Dumping Measures Anti - Dumping Importers would like to import goods if available at a price lower than that of the good in the importing.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 5 Energy Regulation Module 5: STRUCTURE, COMPOSITION AND ROLE OF AN ENERGY REGULATOR.
Advanced Program in Auditing and Accounting Regulation Module 12 Enhancing Statutory Audit Quality from a Financial Regulator’s Perspective Presenter:
Lecture 7: Airport Financial Management
Prayas Energy Group, India Transparency in Electricity Service Delivery: Billing, Quality of Service and consumer issues Bishkek, September 2011 Presentation.
THE LIBERALIZATION EXPERIENCE: THE CASE OF GHANA A PRESENTATION BY CAPT. JOE BOACHIE, ACTING DIRECTOR-GENERAL, GHANA CIVIL AVIATION AUTHORITY AT THE SEMINAR.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
Slide 1.2 Introduction to Department of Telecommunications: Telecommunication services started in India in the year 1851 with the First Electric telegraph.
PNCC Presentation Palmerston North Airport Ltd 2012/13 Annual Report Our Vision To grow the shareholder’s regional economic value by operating a safe,
1 TC’s Data Requirements for General Aviation: Implications for Flight Schools Air Transport Association of Canada 2010 Annual General Meeting Vancouver,
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
WSSB Capacity Enhancement Workshops The Uganda Performance Contract & Purpose 2. Performance Key Elements 3. Water Board’s Rights & Obligations.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
1. Mirza Hamid Hasan 29 September  Need for Regulation  Historical regulation authority and mechanism  Creation of present regulatory agencies.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Lecture 6: Airport Financial Management
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
 At the time the decision was made to regulate the major airports, Cabinet noted that no work had been undertaken on regional airports. So MOT was invited.
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
Lecture 24 Salary Income Tax credits and Exemptions.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Chitkala Zutshi Member (Water Resources Economy) Maharashtra Water Resources Regulatory Authority Mumbai India Water Week 2016 New Delhi 4-8 April 2016.
COMPETITION ASSESSMENT IN MALAWI TRANPORT SECTOR The Executive Director CFTC, Mpikisano House, Area 4, P/Bag 332 Lilongwe 3, Malawi Phone: /7.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
1 Electricity Distribution Price Review Metering Workshop 14 July 2005.
NATIONAL BUDGET.
I N D I A OWNERSHIP & CONTROL DR. SANAT KAUL LIBERALIZED AIRLINES
AVIATION TARIFF REVIEW PROCESS AND METHODOLOGY
Draft Regional Connectivity Scheme (RCS)
International Accounting Standard 16 Property, Plant and Equipment
Presented by: Antony N. Gichia Regional Audit Center Mombasa
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
THE LIBERALIZATION EXPERIENCE: THE CASE OF GHANA
EU Tariffs Code Update Based on Refined Draft as of 30th October
Presentation on Legal aspects of FMCG
Yellowknife Airport: Governance and Revenue Generation
The Economic Regulation of Transport Bill, 2018
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 18 October 2017.
INTERNATIONAL CIVIL AVIATION ORGANIZATION
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
SB 623: Safe and Affordable Drinking Water Fund ( )
WATER REGULATORY AUTHORITY
Raw Water Use Charges for 2016/17 Financial Year
Business, The Economy and Government
Major Vaal River Consultation Meeting Raw Water Use Charges for 2019/20 Financial Year 24 October 2018.
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 02 November 2017.
Presentation transcript:

Airports Economic Regulatory Authority of India .

INTRODUCTION Airports public sector monopoly till 2003. Unprecedented growth in air traffic led to considerable strain on airport infrastructure (2004-05 to 2007-08) 30% groowth in domestic traffic and 15% in international 2000-2010: Indian aviation had to cope with an additional 84m PAX. Need for attracting private investment to create world class infrastructure: -Govt permitted private sector in airport development in 2003-04. -In 2006, Delhi and Mumbai Airports leased out to GMR Group and GVK Group respectively. JVCs were formed.

INTRODUCTION (Contd…) OMDA and State Support Agreement (SSA) were signed with JVCs SSA indicated Govt intention to establish independent regulator AERA Act, 2008 was enacted for economic regulation of airports with effect from 1.1.2009.

INTRODUCTION (Contd…) AERA Act applies to all major airports other than airports and airfields belonging to or subject to control of the Armed forces or paramilitary forces of the Union. A major airport which handles or is designed to handle more than 1.5mln passengers in ayear Govt may notify any airport as a major airport There are 24 major airports as on 1.1.2017

Organizational Structure Chairperson Member Member Secretary OSD (Tariff) Deputy Chief AGM (Fin.) AGM (Fin.) Under Secretary (F & A) Under Secretary (P & A)

Regulatory Objectives Facilitating wider policy aims for the aviation sector through regulation of major airports, recognising their role in the sector and economy; Protecting and promoting interests of existing and future users of major airports and air navigation services through provision of quality services commensurate with the respective charges, keeping in particular focus the interests of passengers and cargo facility users and the user expectations; Promoting investment in airports and air navigation services and their effective management so that all reasonable demands for airport services are met efficiently.

Main Functions of AERA Determine tariffs for the aeronautical services. Determine amount of Development Fees. Determine amount of Passenger Service Fee. Monitor the set performance standards relating to quality, continuity and reliability of the service at the airport.

Aeronautical Services and AERA’s Approach To Economic Regulation Aeronautical Services are as given below: Services provided by the airport operators (Airport Services) Air Navigation Services (ANS) AAI Cargo Facility, Ground Handling & Supply of Fuel to an aircraft Regulatory approach for tariff determination: Price cap Model Light touch approach

Airport Charges Airline charges Landing, Parking, Housing Charges. Navigation charges (RNFC, TNLC) Passenger charges UDF ADF Cargo Charges Fuel Supply Ground Handling

Factors affecting tariff determination Capital expenditure incurred and timely investment in improvement of airport facilities; Services provided, its quality and other relevant factors; Cost for improving efficiency; Economic and viable operation of major airports; Revenue received from services other than the aeronautical services; Concession offered by the Central Government in any agreement or memorandum of understanding or otherwise; Any other factor which may be relevant for the purposes of this Act.

Procedure to Determine Tariffs Determine tariff once in five years - Amend in public interest during the said period of five years Transparent process - Consultation with stakeholders. -stakeholders make submissions to AERA -all decisions of AERA fully transparent, documented & explained. Airport operators, Indian registered airlines, representative bodies of the airlines and airports, Cargo facility user, Central Government, respective State Governments and consumer organizations consulted on a regular basis by the Authority.

Regulatory Building Block Approach Price Cap Regulation Single Till CAPEX Fair Rate of Return: WACC RETURN ON RAB REGULATORY ASSET BASE (RAB) OPEX+TAX Non-aero revenue Revenue Requirement Traffic DEPRECIATION Aeronautical Yield per Passenger Service Quality Annual Tariff Proposals

Appeal Process First Appeal: AERA Appellate Tribunal Second appeal: Supreme Court

Regulatory Asset Base Consists of only aeronautical assets. Common area in Terminal building is classified into aeronautical, non aeronautical. Normative cost prescribed for runway, apron and terminal building

DEPRECIATION Companies Act rates are followed for standard assets Runway, Apron and Taxiways AERA will prescribe based on a study

Weighted Average Cost of Capital Cost of Equity 16% Study by NIPFP Cost of debt Normative debt equity not prescribed

Operation and Maintenance Expenditure Efficient O&M Expenses to be included O&M Expre to be allocated- aero & non-aero based on certain criteria

Non Aeronautical Revenue Major non-aero revenues Duty free Retail Food & Beverages Car park Advertisements

TILL Single Till- All non-aero revenues used to subsidise aeronautical charges: Dual Till - Non-aero revenues not taken into consideration Hybrid Till- Portion of non-aero revenues taken as subsidy

Taxation Taxes paid on aeronautical revenue are returned to the airport operator.

Annual Revenue Requirement ARR= RAB*WACC+D+O+T-NAR RAB-Regulatory Asset Base, WACC- Weighted Average Cost of Capital, D-Depreciation, O- O&M Expre, T- Tax and NAR is Non-Aero Revenue

X Factor PV of five years ARR is equated to the PV of expected revenue at the current airport charges to arrive at the X Factor.

Yield Per Passenger Maximum Allowable Yield per Passenger PV of Aggregate ARR divided by estimated passenger throughput.

Tariff Card Airport Operator submits tariff card. AERA checks to see that tariff as proposed earns the operator a sum equivalent to the ARR

CGF and Light Touch Regulation Cargo, Ground Handling and Fuel Farm Operations Fixed on light touch if the service is not material, or if material it is competitive and if material and not competitive, based on User agreements

Recent Developments National Civil Aviation Policy-2016(NCAP-2016)-The NCAP-2016 has been approved by the Govt. Para 12(C) of the NCAP-2016 has envisaged changed in the till regime from “Single Till” to “Hybrid Till” . Under Hybrid Till 30% of the Non- aeronautical Revenue shall be used to cross subsidize the aeronautical tariffs . Para 19(a) of the NCAP-2016 has recommended for minimum 3 ground handlers instead of 2 as the criteria for competition assessment . Normative Approach: AERA has issued Order No. 07/2016-17 dated 13.06.2016 benchmarking the cost for terminal building, runway, taxiway etc.

Thank you

Orders Issued 7299022357