(Part 30, PP 2007, animation+p/r : short version compr.)

Slides:



Advertisements
Similar presentations
ANTON VOREK Kunín 316, TEL FAX: Business premises Malá strana č.p. 234, , Suchdol nad Odrou
Advertisements

Haivan Pass Tunnel Construction Project
Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
SHOTCRETING K.V.SUBBA RAO.
Measurement for Civil Engineering works
 Location – Maneri to Uttarkashi, India  Length – 8.56km long, diameter 4.75m  Use – a power tunnel, part of the hydro-electric project on the River.
CONSTRUCTION OF SOIL NAILING WALLS
GROUNDWATER CONTROL.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
SILICATES FOR GROUND CONSOLIDATION Silicate based grouts usually contain three main components: Sodium silicate Hardener or reagent Water.
1.3: Fresh Water Flows Underground Groundwater: Water held underground Permeable: A substance that liquids can flow through. Ex: coffee filter, soil,
How to Build a Groundwater Model Activity Source Created by the USA Groundwater Foundation; modified from the Science Olympiad event, Awesome Aquifers.
1 Groundwater Pollution Containment of Pollution.
Slop Stabilization Pertemuan
Pavement Analysis and Design
Presented by: 1. A measure of how easily a fluid (e.g., water) can pass through a porous medium (e.g., soils) 2 Loose soil - easy to flow - high permeability.
Department of Civil Engineering,
Groundwater All water found underground, frequently in: Joints and cracks in rocks Open space between sediment grains.
Groundwater 6 th. Ground Water What if you dump a bucket of water on the ground what will happen? Depends on the Ground!!!
Introduction to Spring Development
Introduction to Water You need to write down the underlined words for vocabulary!
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Part 10-2b Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2b, PP 2007, animation+p/r : compr.)
(Part 9-2e, PP 2007, animation+p/r: rev compr.
Construction Beam Tunnel
Part 10-1b Micropiles and self-drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-1b, PP 2007, animation+p/r : compr.)
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording.
Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
Chapter 16 Landfill Liners and Geosynthetics
Part 16 Sequential and single sequence grouting with hybrid and semi-hybrid grouts VII-2009 (Part 16, PP 2007, animation+p/r : DEMO) ready 1.
Part 30 “Grouting in rock” V-2009 (Part 30, PP 2007, animation+p/r : , DEMO) ready 1 Copyright notice Unauthorised copying of this presentation.
Teaching Aids Service by KRRC Information Section.
(Part 66 short, PP 2007, animation+p/r compr.)
Concrete repairs in Dammam
Concrete Repair.
RISK ASSESSMENT FCC draft, 2. September 2015.
Micropiles and self drilling rods in soil and rock engineering
(Part 30, PP 2007, animation+p/r : short version compr.)
(Part 66 short, PP 2007, animation+p/r compr.)
Substructure Groundworks - Hazards
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Concrete repairs, crack sealing
GROUND IMPROVEMENT TECHNIQUES
By Tomasz Najder, Ph.D Civ. Eng.
Concrete repairs, crack sealing
Drilling and sampling in foundation engineering
Building Technology – Soil Investigation
Part 66/1 “Polyurethane resins in rock grouting and tunnel repairs”
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
Biological engineering and gabion constructions in coast protection
Innovative tunnel waterproofing technology
Part 75-3D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Ground improvement techniques
5th FCC Infrastructure & Operation meeting
Part 30/1 TrV-2 Erfarenhet från tunneldrivning under fritt vatten ‏
Drilling and sampling in foundation engineering
Drilling and sampling in foundation engineering
1.3: Fresh Water Flows Underground
Well Repair Installation of Well Liners
TRENTON Casing Filler Presentation
Presentation transcript:

(Part 30, PP 2007, animation+p/r : 2015.06.02 short version compr.) Part 30/2 TrV-1 Beprövade tekniska lösningar för ”vattendrabbade” tunnlar i komplicerade hydrogeologiska bergförhållande VI-2015 revised 2016 (Part 30, PP 2007, animation+p/r : 2015.06.02 short version compr.) Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited. ready

The Great Melen Project in Istanbul press press press ready The Great Melen Project in Istanbul press

The Great Melen Project in Istanbul There are two ways to set, or harden, liquid sodium silicates for grouting applications. The first way is by lowering the silicate’s pH. This causes the SiO2 species to polymerize into a gel. Some setting agents will hydrolyze over time and form an a cid that will set the silicate. By controlling the composition of the setting agent, and therefore the rate of hydrolysis, the gel time of the grout can be tightly controlled. The second way to set a silicate grout is to react it with soluble metals to form insoluble metal silicates. These grouts generally have higher strength and are lower in cost. Typically, PQ’s N® sodium silicate is used for grouting applications. It is diluted to reduce its viscosity, so that it penetrates soils more easily. The viscosity adjustment takes into account the soil permeability and the strength requirement of the grouted mass. The strength of a silicate-grouted soil is influenced by several factors: concentration of silicate in the grout formulation composition and particle size distribution of the soil selection and amount of hardening agents  chemistry of the surrounding waters Soil grouting and ground modification with sodium silicate is a sophisticated engineering application and requires specialized equipment and expertise. The Great Melen Project in Istanbul Probe drillings related to the geological profile Exploration inadequate even with 2 probe holes press ready

Bosphorus There are two ways to set, or harden, liquid sodium silicates for grouting applications. The first way is by lowering the silicate’s pH. This causes the SiO2 species to polymerize into a gel. Some setting agents will hydrolyze over time and form an a cid that will set the silicate. By controlling the composition of the setting agent, and therefore the rate of hydrolysis, the gel time of the grout can be tightly controlled. The second way to set a silicate grout is to react it with soluble metals to form insoluble metal silicates. These grouts generally have higher strength and are lower in cost. Typically, PQ’s N® sodium silicate is used for grouting applications. It is diluted to reduce its viscosity, so that it penetrates soils more easily. The viscosity adjustment takes into account the soil permeability and the strength requirement of the grouted mass. The strength of a silicate-grouted soil is influenced by several factors: concentration of silicate in the grout formulation composition and particle size distribution of the soil selection and amount of hardening agents  chemistry of the surrounding waters Soil grouting and ground modification with sodium silicate is a sophisticated engineering application and requires specialized equipment and expertise. second probe hole (not performed) fault 6m second probe hole (not performed) tunnel 40m dip 1 probe hole only the end of excavation (planned) The Great Melen Project in Istanbul – optional case → cross section press ready press press

?? Necessity of probe (exploratory) holes! Tunnelling contractors ready Héðinsfjarðargöng Project – face collapse at Ólafsfjördur Tunnel (high water pressure in the fault located to close to the blasting front !!!)  Ólafsfjördur Tunnel – weak zone not detected press press

Drilling for pre grouting (umbrella) – Arrowhead Tunnels (USA) There are two ways to set, or harden, liquid sodium silicates for grouting applications. The first way is by lowering the silicate’s pH. This causes the SiO2 species to polymerize into a gel. Some setting agents will hydrolyze over time and form an a cid that will set the silicate. By controlling the composition of the setting agent, and therefore the rate of hydrolysis, the gel time of the grout can be tightly controlled. The second way to set a silicate grout is to react it with soluble metals to form insoluble metal silicates. These grouts generally have higher strength and are lower in cost. Typically, PQ’s N® sodium silicate is used for grouting applications. It is diluted to reduce its viscosity, so that it penetrates soils more easily. The viscosity adjustment takes into account the soil permeability and the strength requirement of the grouted mass. The strength of a silicate-grouted soil is influenced by several factors: concentration of silicate in the grout formulation composition and particle size distribution of the soil selection and amount of hardening agents  chemistry of the surrounding waters Soil grouting and ground modification with sodium silicate is a sophisticated engineering application and requires specialized equipment and expertise. Drilling for pre grouting (umbrella) from back position and through cutter head The principles for execution of the probe drilling and pre grouting with holes through A-ports in the cutter head (for almost horizontally holes) – green holes and through the B-ports from the “back position” inclined 7.5º outwards – blue holes press press Drilling for pre grouting (umbrella) – Arrowhead Tunnels (USA) ready Drilling for pre grouting (umbrella) from back position – Arrowhead Tunnels (USA)

There are two ways to set, or harden, liquid sodium silicates for grouting applications. The first way is by lowering the silicate’s pH. This causes the SiO2 species to polymerize into a gel. Some setting agents will hydrolyze over time and form an a cid that will set the silicate. By controlling the composition of the setting agent, and therefore the rate of hydrolysis, the gel time of the grout can be tightly controlled. The second way to set a silicate grout is to react it with soluble metals to form insoluble metal silicates. These grouts generally have higher strength and are lower in cost. Typically, PQ’s N® sodium silicate is used for grouting applications. It is diluted to reduce its viscosity, so that it penetrates soils more easily. The viscosity adjustment takes into account the soil permeability and the strength requirement of the grouted mass. The strength of a silicate-grouted soil is influenced by several factors: concentration of silicate in the grout formulation composition and particle size distribution of the soil selection and amount of hardening agents  chemistry of the surrounding waters Soil grouting and ground modification with sodium silicate is a sophisticated engineering application and requires specialized equipment and expertise. ready press The Great Melen Project in Istanbul – drilling from B-ports (back position) The Great Melen Project in Istanbul – drilling from A-ports (through cutterhead) press press

press ready Drilling from A-ports (through cutterhead) with preventers (close mode) and without preventers (open mode) press

press press press ready

The Great Melen Project in Istanbul Water ingress before annulus grouting The Great Melen Project in Istanbul 7.439% Mucking impossible ready

Water ingress still after annulus grouting: – necessity of cut-off membranes with PUR or OMR ready

The Great Melen Project. Cut-off grouting (proof grouting) with PUR/OMR press ready 12

The Great Melen Project in Istanbul – grouting options press press press press ready The Great Melen Project in Istanbul – grouting options press

One of the largest problems for sub-water Safety: One of the largest problems for sub-water tunnelling is uncontrolled water ingress. Two of the biggest risks are: 1. Immediate flooding. 2. Ground collapse associated with water ingress. Safety: One of the largest problems for sub-water tunnelling is uncontrolled water ingress. Two of the biggest risks are: 1. Immediate flooding. 2. Ground collapse associated with water ingress. press ready press

2. Dränering vs isolering vs injektering för tunnels täthet ready

Principles of tunnel sealing (valid for D&B method) or shotcrete or shotcrete 1. Grouting of rock mass: pre- and optionally post grouting. 2. Drainage and waterproof membranes. 3a. Primary shotcrete layer and waterproof (?) secondary shotcrete layer performed with anti-cracking netting (mesh) and/or fiber + waterproofing additives. 3b. Primary shotcrete layer and waterproof secondary layer performed as in situ cast-in-place concrete lining without reinforcement or reinforced – optionally with anti-cracking netting (mesh) and/or fiber + waterproofing additives. press press press press ready

press ready

Typical shotcrete final lining detail Presented drawing displays a typical shotcrete final lining section with waterproofing system, welded wire fabric (WWF), lattice girder, grouting hoses for contact grouting and a final shotcrete layer with PP fiber addition press ready

Example for drainage into the side pipe The groundwater flowing into the tunnel invert is collected with a granular filter and a perforated pipe in the longitudinal direction, placed in the deepest part in the invert ready Example for drainage into the side pipe

Héðinsfjarðargöng Project – tunnel excavation ready Héðinsfjarðargöng Project – tunnel excavation

Water ingress in heavy leaking zones ready Water ingress in heavy leaking zones

Fault above tunnel invert after PUR pre grouting ready Fault above tunnel invert after PUR pre grouting

Stone from the face grouted with PUR – solid form like amber of PU resin (Ólafsfjörður Tunnel) Large fault grouted with PUR (Ólafsfjörður Tunnel) press ready

PUR as “hard” amber (Ólafsfjörður Tunnel) ready PUR as “hard” amber (Ólafsfjörður Tunnel)

Fault above tunnel invert before wash-out of fill material press ready Fault above tunnel invert before wash-out of fill material Fault above tunnel invert after wash-out of fill material

Tunnel finishing works: ready press press press Tunnel finishing works: grouting + drainage + waterproofing membrane (+ thermal isolation) + shotcrete Tunnel primary works

Thank You for Your attention! THE END of Part 2 Thank You for Your attention! Ph.D Civ. Eng. Tomasz Najder Senior Consultant Najder Engineering AB Movägen 3, 133 36 Saltsjöbaden - Sweden Org. no: 556957 – 5433 Tel: 0046 (0)8 717 5714 Fax: 0046 (0)8 717 6042 Mobil: 0046 (0)704 217 012 E-mail: tomasz.najder@hotmail.com www.najder.se ready