Dozer: Sensors Calibration and Hydraulic Calibration

Slides:



Advertisements
Similar presentations
Page 1 Koasis II Specifications & Operation. Page 2 1.System Design Map Water Tank Fertilizer Tank A Fertilizer Tank B Fertilizer Tank C Filter Automatic.
Advertisements

LOGGING ON AND SHUTTING DOWN How to do both successfully at school.
Grading Features V11.2 AccuGrade and GCS900
Machine Setup. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS? Webinar Information.
Spectra Precision Laser Entry Level Machine Control
Trimble® GradeMax™ What is grade max. Trimble® GradeMax™ What is grade max.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Corrections and Adjustments TCA 1800
3D Machine Control Systems
Trimble 2D & 3D Grade Control Systems for Dozers & Graders
`SET-UP MANUAL SRM D248 PURPOSE:
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
Portable/Desktop Projectors Small and light, ideal projectors for transports.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
© Emotron AB Protection against damage and downtime Emotron M20 Shaft Power Monitor.
EPOCH 1000 Series Procedure Phase Array Straight Beam Calibration
Note if in doubt click the “Help” button
1 Lab Equipment. 2 TopicSlides DC Power Supply3-4 Digital Multimeter5-8 Function Generator9-12 Scope – basic controls13-20 Scope – cursors21-24 Scope.
Features of CNC Machining Centers
Parrot CK3300 with Nokia 6681 and TOMTOM Mobile 5 Parrot CK3300 with Nokia 6681 and TOMTOM Mobile 5 TOMTOM Mobile 5 Nokia 6681.
What is the It is the Next Generation, Calibration Station for the GasBadge ® Plus Personal Monitor
Propellers The engines are equipped with four bladed, full
Ensure that the Field Day Call Sign is correct.
Field-IQ System Boom Height Control. Benefits  Maintain boom height in uneven terrain  Reduce operator fatigue  Consistent spray tip height reduces.
Trimble GCS900 Dual Antenna System Why Trimble uses a Dual Antenna Solution and why it is the better solution?
Parrot CK3300 with Nokia 9300 and Wayfinder Parrot CK3300 with Nokia 9300 and Wayfinder.
GEN IV IP NVR Setup And Instructions. Playback Recordings 1)Click and select your device 2)Select Camera in next box a) To select more then one camera.
Excavator X62 Installation. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?
Ensure that the Field Day Call Sign is correct.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
GCS 300 System Operation Application – Level 1.
Equipment Setup GCS300 – GCS900 Components Presented By:
MOVEMENT TRACKING SYSTEM (MTS) TURN ON THE SYSTEM & LOG INTO THE CONTROL STATION INSTRUCTOR:
EPOCH 1000 Series Procedure Phased Array Angle Beam Calibration
CONTROL SYSTEMS Control Systems A command is a directive that performs a specific task An argument is a variable that can be used by the function reveiving.
FAC calibration for wheel balancer Editor: Song Zhi C HECKED : Li Chuanhong Version : A1001 Date : The factory calibration program can be suitable.
Chapter 3 Device Monitor Screen Otasuke GP-EX! Chapter 3 Device Monitor Screen Chapter 3 Device Monitor Screen.
Graphing Calculator Steps Steps to follow to find the vertex of a parabola & to find the zeros of a parabola. Make sure you view this in presentation mode.
GCS400 Lift & Tilt Dozer Control System
2D Guidance for Excavators on the 3D Display. Configuring a 2D Hex Machine If this was a 2D only display you would only see “Depth and Slope”
Computer Vocabulary Computer
PCS400 Software Phil Jackson Training Manager January 2009.
PCS400 Software\ v1.1 Phil Jackson Training Manager May 2009.
CTCT PCS900 v1.10 Quick Start Guide Phil Jackson Training Manager March 2010.
EXCAVATORS. Excavator.dll : General Settings Contains:  Excavator Dimensions  System Override Values  Useful when a sensor fails  Sensor Adjustments.
CTCT 3D Paving Training 3D UI, Configuration & Use March 2010 Phil Jackson CTCT Training Manager.
CAG – (Auto)CAD Commands
Done By: Huraiz AlGaoud. The mouse Mouse: It is a handheld pointing device that lets you select or move items on your screen. Mouse pad: provides a smooth.
CB430 Display Basics. Display Introduction LCD Screen Data Card Door/Slot Main Hardkeys Hardkeys / Softkeys.
Word Processing vocabulary (a day) & (b day) Put the vocabulary words in your notebook.  Alignment - The way multiple lines of text line.
EXCAVATORS.
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: Detailed Heat Transfer Measurements Inside Rotating Ribbed Channels Using the.
Version of document: 2.02 Software CBox: v3 User Manual Application Examples Language: English.
CNC Motion BenchMill 6000 Machining Center
By: Citlalli Dominguez and Beiry Estrada
Features of CNC Machining Centers
Powertap User Guide.
BASIC COMPUTERS Merced Adult School
Trimble PCS900 Measure-ups using SPS930 UTS and SCS900
Features of CNC Machining Centers
Effective Methods to Calibrate the Reverse Parking Sensors of your Car of your Car.
Start by going to E-First Piece under Quality in Business Functions
Controlling your quadcopter
N3FJP Field Day Logger.
University of Warith AL-Anbiya’a
Creating the jwork folder
Controlling your quadcopter
Windscreen Wash / Wipe Systems
Finding Statistics from a Grouped frequency table
Presentation transcript:

Dozer: Sensors Calibration and Hydraulic Calibration

Pitch Sensor Location Mount the sensor on the blade Allow the sensor to rotate 90 degrees for tilt calibration In this graphic it is positioned in the normal operating position

Pitch Sensor Calibration Required if AS400 is permanently installed on the machine to measure blade pitch Park machine on level ground Make sure the left mast is vertical (if possible) in the forward/aft direction If it is not possible to make the left mast vertical, put the machine and blade in the normal working position Press “Calibrate” to zero the pitch sensor.

Pitch Sensor Calibration

Pitch Sensor Calibration

Valve Calibration - Basics Allows smooth automatic control GCS900 monitors the valve movement and computes a response curve. Can be done with and without GPS /ATS Before starting the valve calibration you need to ensure that the machine measurements are entered into the CB430 The valve calibration should be done with warm oil and at normal operating revs.

Lift Calibration Must be in Manager mode Setup / Installation Menu / Valve Calibration Select “Lift” A set of screens follow – perform the instructions

Calibration without GPS/ATS The following screens appear if the GPS/ATS sensors are not detected or due to a low accuracy condition

Calibration without GPS/ATS

Calibration without GPS/ATS

Calibration without GPS/ATS

Calibration with GPS/ATS Similar screens to previous method without the requirement to measure blade height differences (GPS/ATS does this for you!)

Calibration with GPS/ATS

Calibration with GPS/ATS

Calibration with GPS/ATS

Calibration with GPS/ATS

Calibration with GPS/ATS

Lift Calibration Place in Auto Press the Auto/Manual switch System will then automatically move the blade and monitor the movement against the valve command

Lift Calibration

Lift Calibration

Lift Calibration

Tilt Calibration Process is similar to the lift calibration Tilt Calibration requires the AS400 sensor to be rotated 90 degrees to measure the blade tilt

Tilt Calibration

Tilt Calibration

Tilt Calibration

Tilt Calibration

Tilt Calibration

Questions?