SMB Service Status 113th ACCU Meeting

Slides:



Advertisements
Similar presentations
WMS – Warehouse Management Systems
Advertisements

THE CONTEXT OF LOGISTICS. Cycle of Supply and Demand Customers Other Inputs Other Outputs Operations Demand for Products Supply of Products passed to.
Chapter 14 Supply chain management
Service Management Status 107 th ACCU Meeting 10 March 2015.
Chapter 7 Functional and Enterprise Systems. Chapter 7Slide 2 Customer Relationship Management  Customer Relationship Management The philosophy that.
Order Fulfillment Along the Supply Chain
Data Management Solutions
Service Management Status 108 th ACCU Meeting 09 June 2015.
E-Commerce and Supply Chain Management (SCM) Chapter 4.
Chapter 1: 21st Century Supply Chains
Housing Service Review Service Report 24 November 2014.
SAP ERP Sales and Distribution Solutions
M. Tiirakari 9 December2009. CERN regular shuttle services CERN Hostel services and WWW booking Miscellaneous 9 December 2009 M. Tiirakari 2 Summary.
1 Copyright ©2009 by Cengage Learning Inc. All rights reserved Designed by Eric Brengle B-books, Ltd. CHAPTER 14 Prepared by Amit Shah Frostburg State.
OMSAN LOJİSTİK. Reception and Inspection Processes Procurement and Supplier Relationship Management Latin America Logistics Center Logistics Management.
Quovera Confidential 1 ManagingCustomerConsignmentInventory.
UNIT F MANAGEMENT OF DISTRIBUTION, PROMOTION, AND SELLING Summarize management of the distribution process.
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
E-BUSINESS SUITE 11i.10 – CUSTOMER RELATIONSHIP MANAGEMENT ORACLE ACCELERATOR FLOWS, FUNCTIONS & PRODUCTS Sales & Marketing Service Insight to Campaign.
Management Information Systems Islamia University of Bahawalpur Delivered by: Tasawar Javed.
Service Management Status 102 th ACCU Meeting 04 December 2013.
Service Management Status 104 th ACCU Meeting 03 June 2014.
M. Tiirakari 1 9 September CERN Hostel Service 2 As requested by ACCU and the Management -Implementation of the WWW booking -New deals with hotels.
SMB Service Status 111 th ACCU Meeting Tuesday, 8 march 2016.
I.GS Action List following the 96 th meeting held on 15 June 2012 II.CERN Hotel III.Shuttle IV.Bicycle entries V.NOVAE snack service improvement VI.Parking.
1.CERN Hotel 2.Mobility 3.AOB 2 Contents B. 38 (In progress) 1.Formulate and implement a safety plan for the whole building (In progress); Replacement.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Best Practices Consortium
Melissa Nipper, BEAM Business Services Coordinator
Outbound Process Using Wave, Pick-HU, Packing, Staging, and Loading
GS-SEM Group ACCU Meeting 10 June 2009 M. Tiirakari EDMS:
SMB Service Status 114th ACCU Meeting
Functional and Enterprise Systems
89th ACCU Meeting 8th September 2010
Supply Chain Management
SMB Service Status 115th ACCU Meeting
INTRO TO SAP EWM.
2016 TCS SMT Training - Dallas
Mobility service Presentation to EN
Materials in Projects Scenario Overview
Supply Chain Management
SMB Service Status 117th ACCU Meeting
Intracompany Stock Transfer Scenario Overview
Common Learning Blocks
SMB Service Status 116th ACCU Meeting
UNIT –V SUPPLY CHAIN MANAGEMENT
2017 TCS SMT Training - Dallas
Presented by Waleed Rawhi Ahmed Tomeh Mohamad shtaiwy Siham Abu Rabie
WMS An Overview.
SMB Service Status 112th ACCU Meeting
5th Edition.
Functional and Enterprise Systems
Achieving synchronisation through shared information
Procurement’s Impact on Logistics.
Introduction to Global Supply Chain Management Module Eight: Customer Service In The Age of Globalization.
SMB Service Status 118th ACCU Meeting
Intracompany Stock Transfer Scenario Overview
Order Fulfillment along the Supply Chain in E-Commerce
College of Coastal Georgia
ENTERPRISE INFORMATION SYSTEMS
Sales Order Process.
September 21, 2017 Carmen Connect Webinar
Logistics in Marketing
Intracompany Stock Transfer Scenario Overview
A Process View of the Supply Chain
Demand Management, Order Management, and Customer Service
Supply Chain Management Strategy and Design
Property Control Asset Forms
3PL Logistic Software. What is a 3PL? You take the orders. Your third-party logistics provider (3PL) fulfils them. It’s that simple and if it’s seamless,
Supplier EDI On-boarding Overview
Presentation transcript:

SMB Service Status 113th ACCU Meeting Tuesday, 6th of September 2016

Agenda Service Report (Performance, Availability, Customer Satisfaction, Complaints, Feedback, Suggestions) Service Update Cars & Bikes Hotel Point on distribution and logistics Project Update Bicycle Path Prevessin, etc….

12 % increased compared to the same period last year. Service Report Number of tickets with a human caller still growing 12 % increased compared to the same period last year. 159,907 2015 2016

Feedback Feedback stable at ~ 1700 per month (~10% of all “human” tickets) Only 2.6 % negative evaluations

Mobility center – Bikes August: New application, new request form 609 requests handled during august The bikes are returning back home

Mobility center – Bikes No significant waiting list problems Capacity seems ok with 518 bikes (for current service) Usage first stats  Cern users are biggest clients

Mobility center – Car Rental 5th of September: New application, new request form Announced in bulletin, available from service portal Expected benefits Improved pool management EDH based requests

Mobility… changes Public car sharing with mobility on globe car park Mobility Coordinator

Occupation Rate Meyrin and Saint Genis Hotel – Summer 2016 Ca. 300 rooms reserved for summer students Few modifications of reservations Relatively calm and no incidents in the hotel No issues encountered following adjustment of Group Cancellation/Modification Policy Occupation Rate Meyrin and Saint Genis B38 B39 B41 Saint Genis Grand Total Year Month Occupation rate 2016 6 86.32% 80.73% 80.12% 70.82% 80.26% 7 96.31% 86.48% 86.09% 99.27% 93.42% 8 85.70% 77.98% 70.31% 88.36% 82.29% 89.48% 81.74% 78.81% 85.38%

Supply Chain / Logistics Services Internal Goods and Material flow

Goods Receptions Packaging and documentation control Quantitative control through the delivery note Establishment of eventual reserves and responsibilities in case of damage CERN official order matching and ERP registration Shipment preparation

Internal distribution, transport and removals EN-HE Transport Any CERN address <-> Any CERN address >1 t and oversized SLAs: 2 days (standard) to 5 days (LHC + heavy) >1 t and oversized SMB Removals CERN Departments (contact org-unit <> EP) EP-AGS Removals Users (contact org-unit = EP) SMB-SC Internal Distribution Goods receptions + Stores <-> Any CERN address < 1t SLAs: ½ day Prevessin/Meyrin, 1 day CERN points

SMB Internal Distribution Goods reception + Stores <-> Any CERN address < 1t 150k / year 5.5 FTEs, 6 trucks + 1 reserve Note: Time calculation = difference between the distribution request and the distribution list validation by the driver at the end of the tour. It could be up to 8 hours after the actual distribution.

SMB Removals SMB Services: Scope: CERN Departments furniture only 2k per year 2 FTEs 1 truck Organized together with requestors

Stores Identification and definition of standard items (18k available on CERN Catalogue) based on the needs of the CERN Community through a standardization process A centralized front line capturing and processing demands of standard items (EDH Material Request: 100k / year). It also covers non-standard material request in technical areas such as raw materials if the treatment may leverage existing CERN Stores expertise Stock management and replenishment via order management using a pre-defined contractual framework following procurement rules (11k purchase order lines / year) Inbound, internal and outbound warehousing operations: reception, quality control, put-away, inventory, picking preparation (125k / year)

Supply Chain – Logistics: Planned Improvements Complete traceability of goods and material in the flow through an asset tracking system Drivers with Proof Of Delivery device/application to replace the paper list and signature Integration of electronic advanced ship notice messages from punchout suppliers (external e-catalogue) representing 40% of actual goods reception Shipping data in e-procurement system currently under development Increase of the contractual support for Stores items. It will speed up stock replenishment for an improved stock availability.

Projects Bicyle path Prevessin, delivery as planned. Official opening early October. Prevessin entrance. Works to start 1st semester 2017. Esplanade des particules. Works to start 2nd trimester 2017. Extension of the tramway. Studies ongoing on different St-Genis roundabout options for the final configuration.

Security and site access Enforced security at the entrances of the CERN sites: Following recommendations of our host state authorities the enforced security at the CERN entrances will remain in place at least until the end of the year. Turnstiles at entrance B for pedestrians and building 33 Before end of the year turnstiles, equipped with card readers to check validity of badges, will be installed (2 at entrance B and 1 in building 33). This will result in savings and improved access control. Reduced mobility and group access possible.

Many thanks for your attention!