Safety aspects of LIU Outline: Safety documentation management

Slides:



Advertisements
Similar presentations
Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Advertisements

School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
Basics of OHSAS Occupational Health & Safety Management System
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
TS, Length of YETS EYETS LIU & CONS Project
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
1 1. Some recent views ( ) 2 Linac tunnel
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Radiation Protection computing tools Gérald Dumont HSE/RP.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
LIU / HL-LHC Cost and Schedule Review
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Safety aspects of LIU Outline: Safety documentation management
East Area Renovation Project Team meeting # 2 – EDMS News
SPS Crab Cavity Test Stand: Safety review summary
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Safety Documentation EHN1
Forecasts for waste and radioactive material storage
Radiation Protection Issues After 20 Years of LHC Operation
Safety in Construction and Upgrade Phases
BE-ICS activities for LIU Project
East Area Renovation Project team #6 Launch safety agreement
Quality Assurance applied to Accelerator Safety
Acknowledgments: LIU-PT members and deputies, H. Bartosik
EP Experiments safety validation process Safety Permits
East Hall under construction
HL-LHC Safety Assessment Process
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Workshop commissioning Installation Coordination at ESS
PSS verification and validation
Radiation Protection Handbook
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Safety in the East Area Renovation Project
Presentation transcript:

Safety aspects of LIU Outline: Safety documentation management Anne Funken (Project Safety Officer), Dario Carloni BE-ASR Marco Andreini, Fabio Corsanego, Ana Cunha, Dorine Fallavier, Jonathan Gulley, Sonja Kleiner, Beatriz Leon, Simon March, Saverio La Mendola, Cécile Pinto, Sabrina Schadegg, Olivier Tison HSE-SEE Sanja Damjanovic, Doris Forkel-Wirth, Robert Froeschl, Stefan Roesler, Luisa Ulrici, Helmut Vincke, Joachim Vollaire (presenting), HSE-RP Outline: Safety documentation management Conventional Waste declaration Safety Milestones Radiation Protection activities for LIU (design) Radiation Protection preparatory activities for LS2 Radioactive Waste management LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

General safety of LIU – Management of the documentation As for all projects, a safety documentation (Safety File) is required to demonstrate that the new systems or facilities: Are being designed respecting safety principles and Can be constructed, commissioned, operated and dismantled safely The Safety File covers occupational health and safety, the protection of the environment and the safe operation of CERN’s Installations The LIU project is divided in Work Packages (WP), i.e equipment or services delivered by the different groups. Each WP has one WP Holder Due to the extend of the project which covers the upgrade of five different accelerators, the concept of Safety Package (SP) has been introduced LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Status of the safety documentation Conventional hazards identified at this stage LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Status of the safety documentation LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Safety during shutdown installation Engineering Change Requests (ECRs) prepared by equipment groups include the hazards and the related control measures Documents to be provided by the equipment groups according to the HSE Launch Safety Agreement (LSA): design compliance, conformity of equipment, procedures (part of the Safety Files of the Safety Packages) Standard CERN-wide procedures applicable (Intervention Management Planning & Activity Coordination Tool, Joint Inspection Visits, Traceability of Radioactive Equipment at CERN, principle of As Low As Reasonably Achievable) Facility coordination meetings at machine level ensure the management of the planning and the coactivity Safety Support Officer LS2 appointed for the injectors (A-P. Bernardes) LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Conventional Waste handling Waste inventory required according to the LSA HSE template proposed for the non-radioactive waste inventory/forecast, considering the waste categories that are already declared through the CERN-wide annual waste inventory Inventory to be filled in during the project phase, focusing on operation, shall inform about the annual waste production LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Conventional Waste handling Further improvement: after the EYETS 2016-2017, the ECRs will include a new line allowing the declaration of the conventional waste produced during the worksites LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Safety milestones Approval and release of the Safety files of the LIU Safety Packages and/or Engineering Change Requests HSE-SEE regulatory controls (safety inspections according to Safety Instruction IS4) Verification of the conformity of equipment and installations (electrical, handling, pressure and building inspections) Safety file compliance Verification that the prevention and controls measures defined in the Safety Files and/or ECRs are implemented and functional Hardware permits and Beam permits Check-list of controls signed off by the corresponding responsible persons (installation completeness, access safety system, safety file compliance, independent validation of the access safety system by the DSO of the BE department also called “DSO tests”, patrol, RP) LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

RP documentation and RP studies RP work-packages within LIU (Linac4, PSB, PS, SPS and LIU ions) RP performs studies and provides advices for all upgrades presenting radiological implications (beam dumps, collimators, scrapers, energy increase, beam losses…) New PSB beam dump installation and PS shielding re-enforcement completed in LS1 Studies documented in Technical Notes and summarized in RP Safety Files (stray radiation and shielding, residual dose rate, induced activity, air and cooling water activation, RP monitoring…) LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Linac4 RP studies and support Linac4 Safety and RP documentation submitted to the authorities (ASN/OFSP) and the official “homologation” letter should be received soon Follow-up commissioning and installation phases RP studies for the Half Sector Test, the Linac4 connection to the Linac To Booster transfer line (LTB) and for the shielding of the new beam dump at the end of the emittance measurement line (LBE) EDMS 1363779 & 1363543 LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Linac4: Connection to the Linac To Booster transfer line (LTB) New “access sectorisation”: the “end” of Linac2 is becoming an access sector of the PS Switch-yard New shielding element specified Linac2 parts to be removed are identified and included in the radioactive waste forecast of LS2 EDMS 1682784 New shielding L4T to LT Linac2 tunnel LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Linac4: Emittance beam line dump (LBE) and shielding at the PS/PSB interface Commissioning of the Linac to Booster line with beam up to the emittance line dump (LBE) during LS2 (PSB in access mode) Shielding between the PS and PSB modified to allow the integration of the LBE dump After LS2: LBE dump shielding reduced (for ergonomic reasons) and combined with a modification of the logic of the access system preventing H- beam sent to the LBE area while the PSB is in access mode No change for ions operation Proposal endorsed by all concerned stakeholders and the PS Complex Safety Advisory Panel (PS-CSAP) H- to the LBE dump FLUKA model of the PS/PSB area LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

PS Booster Effects (from a RP standpoint) of beam energy and intensity increase assessed and mitigated when needed PSB injection region with new charge exchange injection (LS2) Detailed residual dose rate studies and Work and Dose Planning of interventions PSB Scrapers (LS2) Concentrate the now distributed beam losses at one point in the ring Reduction of residual dose rates at most locations along the PSB ring Optimization of scraper material and interventions currently ongoing PSB injection – Residual dose rate Material comparison for the internal dumps EDMS 1355930 & 1513752 LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

PS Machine development (MD-1543) done in 2016 to validate the efficiency of the shielding on top of the extraction area Replacement of internal beam dumps (SS47/SS48) Ongoing study (the functional specification is being updated) Dose Rate Objective for the extraction shielding: 10 µSv/h Achieved with a comfortable safety margin First dose rate objective after LS1 As built (civil engineering) Measured in 2016 PS internal beam dump study (stray radiation with dump in SS75) (ongoing) LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

SPS 1 week cooling time Horizontal view 1 hour cooling time Vertical view mSv/h Unshielded beam dump (Long Straight Section 1) replaced by shielded dump in Long Straight Section 5 Scrappers and Target Collimator Dump Injection (TCDI) collimator in the transfer line are also being studied Passage MARBLE Present Beam dump (LSS1) Future beam dump in LSS5 Several mSv/h to be compared with tens of mSv/h for the present dump (LSS1) EDMS 1543122 & 1570812 LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

RP preparatory activities for LS2 RP resources: tendering process for RP service contract (to start in June 2017 for 4+3 years) completed and firm selected Strategy for radioactive waste management has been defined with the objective of managing the quantity of waste expected during LS2 (see next slide) Operational Radiation Protection: RP requirements transmitted in LS2 preparatory meetings and facility coordination meetings (training, ALARA procedure, operational dosimetry, traceability, waste acceptance criteria….) RP cool-down requirements for access to facility and start of majors interventions integrated in overall LS2 planning LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Radioactive waste management RWTC Operation 2016 - Eliminated RW Net Volume To be compared to a volume of 1800 m3 during LS1 2016: net volume of eliminated waste equal 652 m3 (corresponds to about 1200 m3 before treatment) Forecast of radioactive waste volume needs regular update LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Summary The LIU Safety structure is in place and Safety well integrated in the project, including the management of conventional waste Editorial work for the Safety documentation is ongoing, in parallel with the ECR process (hazards and control measures announced by the equipment groups) Ionizing radiation hazards related to the LIU project are well identified and mitigated Connection of Linac4, design of new systems such as beam intercepting devices, operation of the injectors with LIU beam parameters Strategy defined to manage the radioactive waste expected during LS2 Equipment group: Update waste forecast Comply with the radioactive waste acceptance criteria LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Spare slides LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

LIU Safety Packages A SP comprises a set of systems located in a same location under the responsibility of several groups. The LIU project includes 16 SPs (and 90 WPs). A Safety Package Coordinator (SPC) is appointed for each SP. The SPC is acting as the technical link person for the corresponding SP. A SP does not change the fact that each group remains owner and responsible of their own Work Package (WP), which are covering their equipment or services. The HSE Launch Safety Agreements (LSA) covering the conventional safety aspects are produced at the level of the SPs. LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Concept of Safety Package: LIU-PSB example PSB Rings Injection Extraction (BTY excluded) 4. New bldg.245 LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Safety documentation of the LIU project: LIU-PSB example Once the system/facility of a SP is in operation, the corresponding parts of the Safety File will be attached to the Safety File of the PSB PSB Safety File Part 1 Descriptive Part 2 Demonstrative Part 3 Operational Part 4 REM Goal, motivation, brief description of the systems/facility focusing on the safety aspects Part 1 Descriptive List of hazards, risks assessment, mitigation measures Part 2 Demonstrative List of procedures required to operate and maintain the systems/facility safely, to dismantle it and dispose of its components safely Part 3 Operational Safety documents which demonstrate the compliance: test reports, certificates of conformity Inspections, safety reports, non-conformities, near-misses, incidents/accidents, experience gained Part 4 Records, Experience, Monitoring (REM) LIU-PSB Safety Files PSB-Rings PSB-Bldg.245 PSB-Extraction PSB-Injection LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Storage of the safety documentation for the LIU project https://edms.cern.ch/project/LIU-000407: https://edms.cern.ch/project/CERN-0000092982: Operation phase Project phase LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

Safety permits A Safety permit will be issued for each major phase Installation phase Hardware Commissioning Beam Commissioning Hardware (Commissioning) Permit Beam Permit Courtesy: Christelle Gaignant LHC Performance Workshop 23-26 January 2017 Safety aspects of LIU Joachim Vollaire

LHC Performance Workshop 23-26 January 2017