LIU / HL-LHC Cost and Schedule Review

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Advertisements

School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Basics of OHSAS Occupational Health & Safety Management System
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
Prime Responsibility for Radiation Safety
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 1. Some recent views ( ) 2 Linac tunnel
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
Safety aspects of LIU Outline: Safety documentation management
Safety aspects of LIU Outline: Safety documentation management
World Health Organization
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
East Area Renovation Project Team meeting # 2 – EDMS News
SPS Crab Cavity Test Stand: Safety review summary
Safety Documentation EHN1
Forecasts for waste and radioactive material storage
Radiation Protection Issues After 20 Years of LHC Operation
Safety in Construction and Upgrade Phases
HEL – Safety aspects Christelle Gaignant
Beam Loss and Radiation Working Group: Conclusions
BE-ICS activities for LIU Project
East Area Renovation Project team #6 Launch safety agreement
Acknowledgments: LIU-PT members and deputies, H. Bartosik
EP Experiments safety validation process Safety Permits
East Hall under construction
HL-LHC Safety Assessment Process
Radiation protection organisation
PSS verification and validation
Radiation Protection Handbook
Radwaste: status & way forward
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Safety in the East Area Renovation Project
Presentation transcript:

LIU / HL-LHC Cost and Schedule Review 17-19 October 2016 17-19 October 2016

LIU-Safety aspects and documentation Anne Funken BE-ASR, Project Safety Officer Joachim Vollaire, Helmut Vincke, Robert Froeschl, Luisa Ulrici, Doris Forkel-Wirth, Stefan Roesler HSE-RP Table of contents: General safety Safety organisation Status of the documentation Conventional Waste handling Next steps towards equipment installation and beam permit Radiation protection RP documentation and studies Radiological impact of operation with LIU parameters New RP instrumentation Radioactive Waste Budget and operational RP 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review

Safety organisation of the LIU project In accordance with the Safety Regulation SR- SO, the Project Leader (PL) is responsible for Safety in the Project The PL is assisted by a Project Safety Officer (PSO) who oversees and coordinates Safety aspects of the Project: The PSO verifies that Safety aspects have been correctly considered within the different work packages, that the proposed Safety measures are consistent with the general Safety policy of the Project and that they are correctly applied by the different work packages, The PSO identifies the Safety issues arising at the interface between work packages and whenever required, asks the relevant work packages to apply the appropriate measures, The PSO coordinates the editorial work for the Safety documentation of the Project. The work package Holders are responsible for proposing and applying the correct Safety measures for the work and equipment included in their work package HSE produces the Launch Safety Agreements (LSA) for non radiological aspects that details the Safety requirements and delivers the safety clearances when applicable. The Radiation Protection Group takes responsibility for all radiation protection aspects. 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Safety documentation of the LIU project As for all projects, a safety documentation (Safety File) is required to demonstrate that the new systems or facilities: Are being designed respecting safety principles and Can be constructed, commissioned, operated and dismantled safely It covers occupational health and safety, the protection of the environment and the safe operation of CERN’s Installations The LIU project is divided in Work Packages (WP), i.e equipment or services delivered by the different groups. Each WP has one WP Holder Due to the extend of the project that covers the upgrade of five different accelerators, the concept of Safety Package (SP) was introduced 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Concept of Safety Package: LIU-PSB example PSB Rings Injection Extraction (BTY excluded) 4. New bldg.245 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Safety documentation of the LIU project: LIU-PSB example PSB Safety File Part 1 Descriptive Part 2 Demonstrative Part 3 Operational Part 4 REM Once the system/facility of a SP is in operation, the corresponding parts of the Safety File will be attached to the Safety File of the PSB Goal, motivation, brief description of the systems/facility focusing on the safety aspects Part 1 Descriptive List of hazards, risks assessment, mitigation measures Part 2 Demonstrative List of procedures required to operate and maintain the systems/facility safely, to dismantle it and dispose of its components safely Part 3 Operational Safety documents which demonstrate the compliance: test reports, certificates of conformity Inspections, safety reports, non-conformities, near-misses, incidents/accidents, experience gained Part 4 Records, Experience, Monitoring (REM) LIU-PSB Safety Files PSB-Rings PSB-Bldg.245 PSB-Extraction PSB-Injection Documents are stored in EDMS 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Status of the safety documentation (*) (*) I. Kobzeva replaced by D. Carloni as from 15.08.2016 Conventional hazards identified at this stage 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Status of the safety documentation (*) (*) I. Kobzeva replaced by D. Carloni as from 15.08.2016 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Conventional Waste handling Waste inventory required according to the LSA HSE template recently proposed for the non-radioactive waste inventory/forecast, considering the waste categories that are already declared through the CERN-wide annual waste inventory Inventory to be filled in during the project phase, focussing on operation, shall inform about the annual waste production Courtesy: Sonja Kleiner, Beatriz Leon HSE-SEE Environment 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Next steps towards equipment installation and beam permit Safety milestones: Approval and release of the Safety files of the LIU Safety Packages HSE-SEE regulatory controls Resources on overall CERN HSE-SEE budget Safety file compliance Verification that the prevention and controls measures defined in the Safety Files are implemented and functional Hardware permits and Beam permits Check-list of controls signed off by the corresponding responsible persons (installation completeness, access safety system, safety file compliance, DSO tests, patrol, RP) 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

RP documentation and RP studies RP work-packages within LIU (PSB, PS, SPS and LIU ions) RP performs studies and advises for upgrades with radiological implications (beam dumps, collimators, scrapers, energy increase, beam losses…) Studies documented in Technical Notes and are being summarized in RP Safety Files (stray radiation and shielding, residual dose rate, induced activity, air and cooling water activation, RP monitoring…) mSv/h Examples of studies (FLUKA code): SPS beam dump – Residual dose rate 1 week cooling time PS internal beam dump study (stray radiation with dump in SS75) PSB injection – Residual dose rate 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Radiological impact of operation with LIU parameters Effects (from a RP standpoint) of beam energy and beam intensity increase have been assessed and mitigated when needed: New charge-exchange injection at 160 MeV in the PSB PSB extraction and PS injection at 2 GeV (instead of 1.4 GeV) Shielding re-enforced in LS1 above the injection and extraction areas of the PS (mandatory for long term PS operation) Detailed RP studies for new intercepting devices (design optimization: shielding and intervention scenario) PSB: Beam dump (installed in LS1), new PSB scrappers PS: Replacement of internal beam dumps in SS47/SS48 SPS: Unshielded beam dump (in LSS1) replaced by new one in LSS5 with appropriate shielding. Scrappers, TCDI collimators in transfer lines are also being studied. LIU ions: no impact on the radiological situation (Linac3, LEIR, PS and SPS) 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

New RP instrumentation Defined as part of RP studies: Stray radiation monitors (example: above the new PS internal dumps…) Induced activity monitors (inside the machine) close to beam intercepting devices PS ring: four new ventilation exhaust stacks equipped with activated air monitors in LS1 (requirements for new facility) Stray radiation monitor on top of PSB dump Induced activity monitor inside the PS ring New ventilation exhaust for the PS ring Bungalow with monitors Sampling 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Radioactive waste A budget of about 5 MCHF per year is allocated to the management of CERN’s radioactive waste The forecast of all radioactive waste that will be produced until 2034 is available, based on information provided by the CERN groups and experiments (data collection as of December 2015 – Regularly updated) The elimination of radioactive waste is planned such to allow the reception and temporary storage of the forecasted waste produced until the end of LS2 (Goal: elimination of about 3700 m3) Period January - September 2016: for the first time, the amount of eliminated waste (1050 m3) exceeded the volume received (571 m3) 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Waste forecast for 2016 - 2034 The current radioactive waste forecast is not listed per project but per group or experiment An update identifying the radioactive waste linked to LIU and HL-LHC projects is ongoing and will be available at the beginning of 2017 For comparison: the volume of waste received in LS1 is about 1800 m3 over 18 months 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Remaining budget and operational Radiation Protection [kCHF] Cost to Completion Comments PSB 11 8 Half Sector Test (test of charge exchange injection in the Linac4 transfer line) in 2016 / 2017 PS 94 RP monitoring (new internal dump position for example) and RP personnel support in LS2 SPS 350 RP monitoring and mainly RP personnel support in LS2 Remaining budget for identified activities is adequate Manpower for studies and documentation tight (relying on fellows) Operational Radiation Protection: RP requirements transmitted in LS2 preparatory meetings and facility coordination meetings (training, ALARA, operational dosimetry, traceability, waste acceptance criteria….) RP cool-down requirements for access to facility integrated in overall LS2 planning 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Summary The LIU Safety structure is in place and Safety well integrated in the project Editorial work for the Safety documentation is ongoing Ionizing radiation hazards well identified and mitigated (design of new systems and operation of injectors complex with LIU parameters) Budget adequate for RP activities Manpower tight (relying on fellows for missing staff resources) 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Spare slides 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

LIU Safety Packages A SP comprises a set of systems located in a same location under the responsibility of several groups. The LIU project includes 16 SPs (and 90 WPs). A Safety Package Coordinator (SPC) is appointed for each SP. The SPC is acting as the technical link person for the corresponding SP. A SP does not change the fact that each group remains owner and responsible of their own Work Package (WP), which are covering their equipment or services. The HSE Launch Safety Agreements (LSA) covering the conventional safety aspects are produced at the level of the SPs. 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Storage of the safety documentation for the LIU project https://edms.cern.ch/project/LIU-000407: https://edms.cern.ch/project/CERN-0000092982: Operation phase Project phase 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Safety during shutdown installation Documents to be provided by the equipment groups according to the HSE LSA: design compliance, conformity of equipment, procedures (part of the Safety Files of the SPs) Standard CERN-wide procedures applicable (IMPACT, Joint Inspection Visits, TREC, ALARA). Facility coordination meetings at machine level ensure the management of the planning and the coactivity. Safety Support Officer LS2 appointed for the injectors. 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici

Safety permits A Safety permit will be issued for each major phase Installation phase Hardware Commissioning Beam Commissioning Hardware (Commissioning) Permit Beam Permit Courtesy: Christelle Gaignant 17-19 October 2016 LIU / HL-LHC Cost and Schedule Review Safety : A. Funken, J. Vollaire, R. Froeschl, H. Vincke, L. Ulrici