RASRS Report to Operating Committee March 21, 2017

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Reliability in the International Arena Alberta Perspective
Remedial Action Scheme Reliability Subcommittee, RASRS WECC Operating Committee June 18-19, Gene Henneberg.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Western Electricity Coordinating Council Market Issues Subcommittee Report to the Market Interface Committee Philip Tice October 30-31, 2008.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Presented to PGDTF February 11, 2015
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Goshen Area Bus Reconfiguration
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee RASRS Report to Operating Committee October 8-9, 2014 Salt Lake City, Utah.
RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC and NERC Protection Criteria and Standards
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
JJ Jamieson MIC Chair MIC Report for ISAS August 2014 Salt Lake City.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
JJ Jamieson MIC Chair JGC update September 2014 Salt Lake City.
Standards Review Subcommittee Update August 17, 2010.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
PRC and SPSs in ERCOT RAS Workshop May 9, 2016.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Bert Peters Chair, Path Operator Task Force
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
Steve Rueckert – Director of Standards
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Unscheduled Flow Administrative Subcommittee Report
WECC Regional Standards Update
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Presented by: LADWP November 14, 2017
Kenneth Silver Los Angeles Department of Water & Power
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Kenneth Silver Los Angeles Department of Water & Power
Update from PEAK on RAS Visualization Efforts
NERC TPL Standard Overview
Module 4 Smart Grid Implementation Issues
Larry Bugh ECAR Standard Drafting Team Chair January 2005
Reliability Assessment Committee Reliability Workshop Priorities
Larry Bugh ECAR Standard Drafting Team Chair January 2005
Western Electricity Coordinating Council
Yale Runback Local Area Protection Scheme
NERC PRC Drafting Team Voltage Ride-Through (VRT) Curve Genesis
Western Electricity Coordinating Council
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
North America Energy Standards Board
Reliability Assessment Committee Reliability Workshop Priorities
Update from PEAK on RAS Visualization Efforts
North America Energy Standards Board
Steve Rueckert – Director of Standards
Kenneth Silver Los Angeles Department of Water & Power
Variable Generation Subcommittee Update to PCC
WECC – NERC Standards Update
Document Categorization Policy
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

RASRS Report to Operating Committee March 21, 2017 Remedial Action Scheme Reliability Subcommittee Gene Henneberg, Chair Western Electricity Coordinating Council

RASRS Scheme Reviews, November 2016 (8 Entities, 22 schemes) PG&E Sobrante-Standard Oil SPS classification change from LAPS to Safety Net approved Carrizo RAS modification due to new switching station. Still classified as LAPS. LADWP Owens Valley RAS modifications related to voltage collapse mitigation were approved. Scattergood RAS generation removal and logic modification were approved. Harbor RAS removal due to system upgrades approved. Hollywood RAS (Safety Net) was approved Western Electricity Coordinating Council

RASRS Scheme Reviews, November 2016 BPA Paul Substation LLL modification to the AC RAS was approved McNary transformer LL modification was approved BPA information discussion on RAS Automatic Arming. Changes in the grid such as sub-hourly energy markets, e.g. EIM, require faster dispatcher reaction to changing loads and put a greater burden on RAS dispatchers to make necessary adjustments if manual-only arming were maintained. BC Hydro Peace Area Wind RAS information update with scheme now in service Peace Area Load Shed RAS approved Saltery Bay (SAY) RAS removal due to system improvements approved Bridge River Area RAS. RASRS conclusion that the scheme is a WAPS due to level of potential generation shedding and will require further review. North Coast RAS modifications to this RAS resulting from an earlier misoperation were approved. Western Electricity Coordinating Council

RASRS Scheme Reviews, November 2016 SDG&E   TL50001, TL50003, TL50004, TL50005 originally approved as SPS (LAPS), but modified to WAPS due to involvement of CENACE. Tucson Electric Power Tie Open Load Shed RAS (TOLS) five year review approved the scheme as WAPS with one action item  PacifiCorp Goshen RAS Action Items. RASRS accepted completion of two of three action items from July 2016 meeting  SCE High Desert Power Project RAS (HDPP RAS) modifications accepted as a LAPS Mojave Desert RAS (MD RAS) modifications due to retirement of Cool Water generation and system upgrades was approved Whirlwind AA-Bank RAS adding third transformer bank and additional arming points. Modifications were approved. Western Electricity Coordinating Council

Western Electricity Coordinating Council Other RASRS Business RASRS Charter. No changes are proposed at this time. RAS Design Guide revision in conjunction with Relay Work Group. Approval through the RWG sponsorship. WECC-1 revision. Western Electricity Coordinating Council

NERC New RAS Definition FERC issued a final order in November 2015 accepting the proposed new RAS definition. Effective date is April 1, 2017 Two year implementation period for any existing schemes newly identified as RAS Immediate application to new RAS OK to de-list schemes that do not meet the new definition, review through RASRS Western Electricity Coordinating Council

Western Electricity Coordinating Council PRC-012-2 Status FERC issued a NOPR proposing to approve the proposed PRC-012-2 and seeking additional information: Clarify that proposed PRC-012-2 will not modify or supersede any system performance obligations under TPL-001-4, e.g. non-consequential load loss always <= 75 MW for P1, P2, P3 events. Seek comment on the processes used to ensure the WECC LAPS or NPCC Type III RAS will be compliant with TPL-001-4 prior to the effective date of PRC-012-2. Seek comment on whether “limited impact RAS” should be defined in the NERC Glossary of Terms. Western Electricity Coordinating Council

Western Electricity Coordinating Council PRC-012-2 NOPR Response NERC legal support to the standard drafting team is preparing response to the Notice of Proposed Rulemaking I discussed the NOPR and standard with EEI’s Reliability Task Force (RTF) on February 15, and expect EEI to comment Other Entities are welcome to respond to the FERC NOPR Closing date for comments is April 10, 2017 Western Electricity Coordinating Council

Procedure to Review RAS RASRS revised the Procedure and Information Required for RAS Assessment document to Recognize the new NERC RAS definition as part of the WECC RAS review process Update LAPS, WAPS, and SN definitions referring to revised WECC Criteria and updated NERC standards Modify related flow chart figures Update references and links No changes to data collected for scheme review Western Electricity Coordinating Council

Procedure to Review RAS Motion: Resolved, that the WECC Operating Committee hereby approves the revised “Procedure and Information Required for RAS Assessment” as posted. Western Electricity Coordinating Council

Western Electricity Coordinating Council RASRS Future PRC-012-2 assigns the present reliability responsibilities of the RASRS under WECC to the RC. The Organizational Structure Review Task Force is well aware of this situation. No immediate structural changes are proposed for WECC and the OC related to RASRS. Peak Reliability is interested in retaining an organization that looks similar to the RASRS. Peak and WECC have time to develop a specific transition plan, if and when PRC-012-2 is approved by FERC. No real discussion yet with AESO. Western Electricity Coordinating Council

Western Electricity Coordinating Council Next RASRS Meeting April 10-12, 2017, Salt Lake City (Typically) review about 20-25 schemes from 7-10 entities Other RASRS business Western Electricity Coordinating Council

Remedial Action Scheme Reliability Subcommittee March 2017