Manufacturing Simulation Case Studies

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Rapid Process Assessment Overview. Ultriva’s Rapid Process Assessment (RPA) consists of a structured Business Process Analysis (BPA) engagement focused.
Theory of Constraints Part II: TOC Concepts
Supplier Development Kaizen Implementation Kit
Chapt 3 Modeling & Simulation Processes Intro/ steps in the process –Formulate problem –Specify the model –Build model –Simulate model –Use model –Support.
Chapter 15 Application of Computer Simulation and Modeling.
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Ch 3 Manufacturing Models and Metrics
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Session Pooja patnaik.
Managing Project Quality
Production Planning and Control Introduction
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
© OpStat Group Inc. All rights reserved. 1 A Lean Analysis Methodology Using.
The Simulation Project. Simulation Project Steps a.- Problem Definition b.- Statement of Objectives c.- Model Formulation and Planning d.- Model Development.
Value Analysis/ Flow Analysis
Capacity analysis of complex materials handling systems.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Just in Time Chapter 9 Vollmann, Berry, Whybark, Jacobs.
CHAPTER 3 PROCESS MANAGEMENT. WHAT IS PROCESS MANAGEMENT ? The selection of the inputs, operations, work flows and methods that transform inputs into.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Process Analysis CHAPTER 5. Learning Objectives 1. Recognize three basic types of processes: a serial flow process, parallel processes (such as what happens.
How to Organize the Systems Selection Process Using the SCOR Framework Pittiglio Rabin Todd & McGrath April 12, 2000 David Kennedy, Principal.
Traditional Approaches to Facility Layout
Process Characteristics
Presented By Dr. Mohsen Alardhi College of Technological Studies, Kuwait April 19 th,2009.
"Using Simulation with Scheduling Visualization to evaluate Change Initiatives in a Bio-Pharma Environment”
Project Chiron SMU TEAM ALCON
Intelligent Supply Chain Management Strategic Supply Chain Management
Chapter 1 Introduction to Operations Management. Production and Operations Management Definition: Managing the activities involved in converting inputs.
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Background: - Founded in 1924, Lee Industries has evolved from a tin can and heavy duty kitchen equipment manufacturer in to a global leader in process.
Chapter 6 Managing Capacity
Activity Scheduling and Control
Chapter 12 The Network Development Life Cycle
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
Design of a large scale production system for aluminum GLARE sheets
Value Stream Mapping Plus Learning to See Better Know the Laws. Use the Tools. Profit. © Factory Physics, Inc.
AXUG Partner Showcase – Introducing Preactor
Chapter 7: Manufacturing Processes
CHAPTER 9 Lean Manufacturing.
Lean Six Sigma Road Map Improvement Process Road Map
Design of a Flexible Shopfloor Layout for a Fabrication Jobshop
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Management is Essential
Management is Essential
Chapter 14 Aggregate Planning.
An introduction to Factory Physics
Process Design and Analysis
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
Simulation - Introduction
Production and Operations Management Function
FACILITY LAYOUT Facility layout means:
Value Stream Mapping (VSM) Training
Chapter 5 Process Analysis.
IE 469 Manufacturing Systems
Project Chiron SMU TEAM ALCON
World-Views of Simulation
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Modeling Scheduling Problems
Project Chiron SMU TEAM ALCON
Facilities Planning and Design Course code:
Capacity Planning For Products and Services
Production and Operations Management
Capacity Planning For Products and Services
Theory of Constraints Part II: TOC Concepts
Chapter 5 Process Analysis.
Presentation transcript:

Manufacturing Simulation Case Studies Chapter 11 Manufacturing Simulation Case Studies

Chapter objectives Explore the manufacturing applications of simulation modeling Apply a complete simulation process on a real-world manufacturing system Learn how simulation project management practices are used in real-world projects Validate the value and benefits of simulation modeling

Chapter Content Chapter Overview Hybrid Simulation of Titanium Manufacturing Process Paint capacity study of an aviation company Simulation of a seamless pipe facility Chapter Summary

Manufacturing Process Simulation Simulation can be used as an effective platform to model several manufacturing applications WITNESS modeling techniques can be used to develop realistic representation of complete real-world simulation projects. It is important to learn the practical aspects of simulating manufacturing systems, execute the various phases of the simulation process, and practice simulation project management.

Hybrid Simulation of Titanium Manufacturing Process A summary of a simulation project conducted at an automotive supplier of high-quality Titanium Metal Products referred to as TMP. The project analyzes a hybrid simulation of one of the supplier’s manufacturing processes. The study aims at improving the manufacturing system throughput (productivity) in order to meet the growing demand requirements.

The Schematic of TMP Plant

This project will allow TMP manufacturing teams to: Study benefits This project will allow TMP manufacturing teams to: develop system-level strategies to increase sponge throughput and reduce costs test these strategies in a “safe” environment before implementation understand the robustness of these strategies to changing market conditions The primary deliverable of the titanium sponge simulation will be a constraint-based throughput improvement road map. 

Modeling Process Identify questions/issues to be addressed by the model List and define operational / financial evaluation metrics Develop a block diagram of the process to be modeled Collect, scrub, and organize the input data set Program and validate the simulation model Run what-if experiments to evaluate alternatives to increase throughput

Model Assumptions A number of assumptions were made to define the model scope, simplify the process logic, and provide repeatable conditions for model start up and experimental runs. The set of simplification assumptions include: Raw materials are always available (chlorine, coke, rutile, etc.) Finished goods are never blocked Mass balances are calculated every hour Cranes and forklifts are black-boxed and operators are always available Plant operates continuously (24 hours per day, 7 days per week)

Model Data Inputs facility layout annual volumes routings / flow logic / operating practices processing times chemical process yields and material balance relationships set up times and batch sizes mean cycles between failure and mean times to repair shift hours / preventive maintenance WIP inventories and move times

Output 1: Reductions (starts) Model Outputs Output 1: Reductions (starts) Per day Per week Output 2: Mass Production (lbs/day) TiCl4 MgCl2 Mg Ti Output 3: Time Between VDP Feed Starts Time Between MgCl2 Taps

Fitting distributions to collected data

Baseline Plant Performance Summary

Baseline Time-In-State report chart

Baseline Mg Production Histogram

Simulation Output Analysis The largest value-added of simulation modeling is achieved from analyzing simulation outputs and optimizing the model parameters. This is typically achieved through statistical analysis, experimental design, and optimization. DES models provide a flexible and cost-effective platform for conducting statistical analysis and running experimental design, what-if analysis, and optimization methods. Decision-makers can draw better inferences about the model behavior, compare multiple alternatives, and optimize performance.

Paint capacity study of an aviation company This case study presents a WITNESS application for a paint process in an aviation company. The paint process is referred to as SP3. Study objectives include the following: Develop a detailed process map (Value Stream Map) of the current state paint process Illustrate all of the current positions in the paint process Perform a “sharp pencil” analysis to determine precise painting capacity Identify opportunities to reduce waste and increase throughput

Airplane paint shop Layout

Study Assumptions The following assumptions were made when developing the WITNESS simulation model: Planes are always available to be prepped There is no downstream blocking after Detailing station Labor resources are not the constraint Equipment PM and Downtimes as provided

Data collected from paint capacity study

Data collected from paint capacity study … POS # Description Mean Min Max Distribution POS 1 or 3 Prep Work 14.5 8.34 19.8 Triangular (8.34,14.539,19.8) POS 2 or 4 Base Paint 14.4 18.8 Triangular (8.34,14.439,18.8) POS 5 Layout 14.9 Triangular (8.34,14.905,18.8) Paint Stripes POS 6 Detailing 16.0 34 Triangular (8.34,15.959, 34.0)

Process Flow and Base Model

Time-In-State chart for paint operations

KPIs results

Simulation of a seamless pipe facility This case study presents a WITNESS application for a seamless pipe facility simulation. The facility includes a Hot Mill Area, a QA area, and the area of finishing lines Study objectives include: Study operation of proposed tube & pipe plant in Saudi Arabia using a simulation model Validate capability of lines to achieve expected production level of 600,000 mt/yr Optimize intermediate storage area size and capacities in the facility Test the effect of various schedules and product mixes on operation metrics Analyze and optimize shift patterns for each plant area to ensure minimal blocking of the Hot mill area.

System Description Plant is expected to achieve 600,000 mt/yr target Plant produces tubes, casings & line pipe Range of OD: 60 to 365 mm Three main areas Hot Mill QA – Heat Treatment and EMI Finishing Lines – LP and OCTG Product is heat-treated depending on grade WIP Storage Two intermediate storage areas (serves as a decouple between each pair of areas) Two heat treatment storage areas Number of in-process buffers (mostly cooling beds) Material Handling System Overhead cranes (4 each) in the Intermediate storage areas.

Model Input Parameters Product Mix Schedule and Sequence Product description: Product Code, OD, WT, Length, Type, Grade, Thread Processing rates of each part type on each equipment Down times of each equipment (randomized) Cycle, time or product based setups Buffer and storage area capacities Plant working hours – shift patterns Crane cycle times All input parameters are read into the model through an Excel Interface

Process flow diagram and the data collected for the Hot Mill area

Process flow diagram and the data collected for the QA area

Process flow diagram and the data collected for the Finishing Lines

The simulation results of the baseline model

TIS Graph of Facility Operations