Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
EVLA SAMPLERS " High speed wide band 3-bit for most bands " Lower speed narrower band 8-bit for bands with RFI. 1.
SJD / TAB1 Fiber Tasks Preliminary Design Review December 5, 2001.
SJDLO/IF/FO - May 19-20, Production & Maintenance Steven J. Durand Thursday - May 20, 2004.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
A Low-Cost Phase Cal Monitor and RFI Spectrum Analyzer for VLBI2010 Mark-5 / Mark-6 using Cheap,COTS Software Defined Radio (SDR) Hardware & Software Gleaned.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
IVS-4th General Meeting, Concepción- Chile, Jan 2006 DBBC - A Flexible Platform for VLBI Data Process G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
02/6/ jdr1 Interference in VLBI Observations Jon Romney NRAO, Socorro ===================================== 2002 June 12.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Personal Computers… …And Their Internal Parts. Table of Contents 1.Motherboard 2.Central Processing Unit (CPU) 3.Power Supply 4.Controller Boards 5.Chipset.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
High Speed Digitizers EVLA Advisory Committee Meeting March 19-20, 2009 Steven Durand & Mike Revnell.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Cosmic Microwave Technology, Inc.
SA1: overview, first results
RFI Protection Activities in IAA RAS
Software Overview Sonja Vrcic
Accelerator control at iThemba LABS
RFI Protection Activities in IAA RAS
Mark 5 / VLBA Correlator Topics
Concepts for a Next-Generation VLBA
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
The Development of Broadband VLBI Technologies in SHAO
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
SMART ENERGY CRYO-REFRIGERATOR TECHNOLOGY FOR THE NEXT GENERATION VERY LARGE ARRAY J. Gardiner, J. Lawton, J. Hamilton, K. Knight, J. Sloan, S. Spagna.
Magnet Safety System for NA61/Shine
INSTRUMENT CONTROLLER OVERVIEW
Production & Maintenance
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
J D Romney, W F Brisken, S J Durand
EVLA NSF Mid-Project Review System / Antenna Status
Water Vapor Radiometer
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
EVLA LO/IF Racks/Bin/Modules
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
Observational Astronomy
Observational Astronomy
EVLA MONITOR & CONTROL CDR
EVLA MONITOR & CONTROL CDR
DAQ Racks, Bins and Modules Internal Design Review
EVLA Advisory Committee Meeting System Status
Gustaaf van Moorsel September 9, 2003
EVLA Racks Bins and Modules PDR
Data Transmission System Digital Design Chris Langley NRAO
Project of Direct Sampling Digital Backend for Quasar VLBI-network
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
Series 5300 Lithium Cell Formation System
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

Future LBO Developments Steven Durand & Jonathan Romney

US-China workshop July 2017

Samplers in the Vertex room US-China workshop July 2017

RF over Fiber US-China workshop July 2017

Attributes of RF over Fiber Positive Only Analog hardware is in the antenna Samplers in the control building are easier to cool Bandwidth is determined by Fiber and RF over Fiber equipment Negative LO signals are required in the vertex room. Analog and LO Fiber wraps require effort Bandwidth is determined by Fiber and RF-over-Fiber equipment US-China workshop July 2017

Samplers in the Vertex room US-China workshop July 2017

Attributes of Vertex Room Samplers Negative LO signals are required in the vertex room. LO Fiber wraps require effort Samplers in the vertex room can generate RFI Many digital fiber transmitters Cooling Digital Electronics in the Vertex is required Positive Samplers are close to the receivers - less noise Bandwidth is determined by samplers Digital fiber wraps easier Possible to have multiple colors on a single fiber NRAO is familiar with this technique. US-China workshop July 2017

US-China workshop July 2017

MARK 6 Four 10GigE input ports 16Gbps sustained record capability Supports up to four 8-disk modules for recording/playback Based on high-performance COTS hardware Easily upgradeable hardware on Moore's Law curve Linux OS (6.0.3) Supports all VLBI data formats US-China workshop July 2017

Data Transmission to the Correlator Mark 6 disk recorders for the VLBA. We are installing units at one VLBA site. A corresponding complement of Mark 6 unit to replay the recorded bits into the correlator We are also investigating a real-time data transmission scheme, using long-range optical fiber networks US-China workshop July 2017

VLBA X/Ka Band Dichroic Ka-band 26.5 to 40.0 GHz X-band 7.9 to 8.9 GHz Maintaining the existing S/X system US-China workshop July 2017

Weather Station Specification (VLBA) Wind Direction : 0-360 ±3° Wind speed: 0-60 m/s ±5% Barometer: 600-1000 mbar ± 6mbar Temperature: -40 to 60°C ± 0.4°C Dew Point: -45 to 50°C ± 1°C Solar Irradiance: 0 - 1400 W/m2 ± 3 W/m2 Liquid precipitation: resolution 0.001 inches ±5% Camera (360º Sky View) Battery back-up Calibration required – annually US-China workshop July 2017

Monitor and Control System Instrumentation installed at VLBA stations, as part of the 2013 upgrade, required new monitor-and-control capabilities, Monitor Interface Board (MIB) were installed by adapting the EVLA’s Ethernet based system. VLBA-oriented “executor” program was developed, to support the new MIBs and has already replaced many functions of the original VLBA monitor-and-control system. All the features with the MIB based system are available, search engine, plotting, and archiving US-China workshop July 2017

VLBA ACU/Servo Upgrade Replaces the functionality of current ACU and FRM electronics COTS PC-104+ based CPU board stack running Real Time Linux Ethernet interfaces to both VLBA M&C system & a dedicated Maintenance/ Engineering GUI (Linux based PC) Fully in-house supportable software system We have all source code and rights to modify it for our use Fully compatible with the New VLBA Monitor & Control system Appears to the system as another MIB Additional built-in test, evaluation and engineering capability using the supplied GUI Supports all current safety requirements US-China workshop July 2017

Water-Vapor Radiometers Many VLBA observations require accurate corrections for fluctuations in interferometer phase and delay The prototype NRAO Water-vapor radiometer (WVR) is designed to make simultaneous measurements of the water-vapor content using the 22-GHz emission lines of H2O molecules. Successfully demonstrated a 3-channel WVR system An improved 5-channel design is being developed US-China workshop July 2017

Interconnection of three Helium Compressors US-China workshop July 2017

RFI Generator US-China workshop July 2017

RFI shielded Rack 60-80dB of shielding .2 – 20 GHz Honey comb air filters Cooling air flow - Bottom to Top RFI absorbing foam lined AC power filters Filtered data connectors RFI tight fiber connectors US-China workshop July 2017

Equipto Rack RF Shielding US-China workshop July 2017

RFI tight Modules Moto: Too many screws >60 dB of shielding from 0.2 – 18 GHz Many styles: double wide, Triple wide, with heat sink, Honey comb filters or wave guides enable forced air cooling. US-China workshop July 2017

Module RF Shielding 60 dB 18 GHz I US-China workshop July 2017

Working to Reduce the RFI Module plus Rack > 120 dB of shielding Sometimes challenging to retrofit commercial enclosures Best to design using RFI tight enclosures at start Consider cooling AC power filters Fiber connections Filtered data connectors US-China workshop July 2017

Conclusion Existing suite of hardware is mature yet still scientifically interesting LBO has well-designed enhancement projects ready to install 2 Gbit samplers Mark 6 recording X/Ka receiver system Upgraded Weather station Replacement ACUs Compatibility - Data rates, Tunability, Channel band passes LBO is interested in data quality and system compatibility US-China workshop July 2017