An Overview of the CLIC RF Structure Development Program ~

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
Design of Standing-Wave Accelerator Structure
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
W. Wuensch, rf development meeting Considerations on running normal conducting cavities cold.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Overview of the CLIC RF Structure Development Program W. Wuensch Second Collaboration Meeting on X-band Structures KEK,
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Structures design R&D program Alessandro D’Elia-UMAN/CI and CERN On behalf of Roger M. Jones 1.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
X-Band: test stand and structure program
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
CLIC Power Extraction and Transfer Structure.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Accelerating structure and PETS baseline parameters and layouts - selected issues W. Wuensch
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
CLIC Accelerating Structure R&D Introduction W. Wuensch CLIC ACE
1 Design and objectives of test accelerating structures Riccardo Zennaro.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
Structure Wakefields and Tolerances R. Zennaro. Parameters of the CLIC structure “CLIC G” (from A. Grudiev) StructureCLIC_G Frequency: f [GHz]12 Average.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Test Accelerating Structures Designs, Objectives and Critical Issues
CALIFES A proposed electron beam test facility at CERN
Development of X-band 50MW klystron in BVERI
CLIC_DDS study
CTF3 Collaboration Technical Meeting January 2008
Brief Review of Microwave Dielectric Accelerators
Review of rf structure test results
Developments on Proposed
Testing Infrastructure, Program and Milestones
Tolerances: Origins, Requirements, Status and Feasibility
Task 2: High-gradient normal-conducting technology development
Update of CLIC accelerating structure design
CLIC rf structure program
Measurements, ideas, curiosities
Progress in the design of a damped an
Presentation transcript:

An Overview of the CLIC RF Structure Development Program ~ A Tale of Two Structures W. Wuensch CLIC ACE 16-2-2008

Outline Introduction to the PETS and accelerating structures Specialties of structure development People, organization and resources Collaborations Organization of this meeting

CLIC module Main Beam ~1 A Accelerating structure, Alexej +100 MV/m, 64 MW, 229 mm Drive Beam 100 A rf distribution PETS, Igor -6.5 MV/m, 136 MW, 210 mm Module in more detail Germana

Fundamental mode properties PETS CLIC_G Aperture [mm] 23 6.15-4.7 Phase advance π/2 2π/3 Vg/c 0.45 .017-.012 R’/Q [kΩ/m] 2.2 15-16 Length [mm] 210 229 Pmax [MW] 136 64 Esurfmax [MV/m] 56 245 Pin/CtPp1/3[MW/mm ns1/3]* 13 18 ΔT (ºK) * 2 Allowable breakdown rate (Daniel’s talk) O(10-7 to10-6) O(10-7) moding overmoded single * pulse length 240 ns High-power constraints, Alexej

Full structure properties PETS Accelerating structure linear field increase Power flow Direction may be a crucial issue for damage potential (Igor) along with degree of tapering. Pulse shape (Frequency domain calculation almost ready to verify energy spread compensation, Raquel Fandos)

Higher order mode properties The drive beam has single bucket spacing and the main beam has six bucket spacing. Damping mechanism PETS: Heavy damping through eight symmetry slots Accelerating structure: Heavy damping with detuning. Heavy damping from four cutoff waveguides in CLIC_G. Option of addition of damping slots if pulsed surface heating too strong a constraint. cell first middle last Q1 10 7.7 6.3 A1 [V/pC/mm/m] 117 140 156 f1 [GHz] 16.74 17.21 17.67 PETS Accelerating structure

Higher order mode properties continued Wakefields computed using GDFDL and HFSS. Benchmark from old ASSET experiment. Main uncertainty now is from load material but this can be resolved later.

Accelerating structures Power couplers E max (135 MW)=41.7 MV/m H max (135 MW)=0.07 MA/m PETS couplers were extremely difficult to figure out due to over-moding. Now this robust choke–based coupler solution must be verified with low and high power tests. Accelerating structures Mode launchers are used in current generation of test structures for simplified interpretation of results. More compact couplers will be added once structures are working OK. Electric or magnetic coupling will depend on damping.

Tolerances Accelerating structure PETS: 10 μm precision so not a critical issue. Accelerating structure: Shape and transverse-alignment tolerances 5 μm. Good progress towards this goal on test pieces, disks and quadrants. Going as low as 1 to 2 μm for the bookshelf. This is not obvious… Review of requirements by Riccardo and achieved progress by Mauro. Accelerating structure ± 2.5 μm band PETS 2 μm shape error with ‘banana’ removed

Accelerating structures Technology PETS: Milled octants in copper, forget about disks. Copper can be heat treated if necessary due to low pulsed surface heating. Accelerating structure: Baseline test-structure assembly is disks in copper that have diamond turned irises with milled damping waveguides, then brazed/bonded (NLC/JLC and very old CLIC). BUT soft copper may not be tolerable so CuZr alloy milled quadrants may be required. Also this might be the better mass production solution anyway… And no heating cycle after machining best for maintaining tolerances. And the PETS are milled. More from Mauro. PETS Accelerating structures

PETS on/off Key question: After a breakdown does the power to the PETS or accelerating structures need be turned down to get the structure to run stably again? If yes only for the accelerating structures we can implement a waveguide variable attenuator. If yes for the PETS then we need a way to suppress power production even with the beam going through the PETS. This is hard. If we need to ramp the PETS back on again, this is probably very hard. Igor’s talk. We will only know the behavior of the PETS once we have tested it, and even then it won’t be certain immediately so we have initiated a PETS on/off study in the mean time.

Specialties of structure development Structure and linac design: Beam dynamics, wakefields, bookshelves, tilts, HOM suppression, tolerances and alignment, couplers, high-gradient-high-power performance and overall machine optimization. High-gradient-high-power RF testing: Power sources, infrastructure (components, electronics, etc.), test structure fabrication and testing itself. Technology: Fabrication, achieving tolerances, materials, material states, surface preparation, vacuum. High-power physics and mechanics and specialized experiments: Understanding breakdown and its dependencies. Lifetime - pulsed surface heating. RF constraints. High-gradient-high-power RF and beam testing: Breakdown kick, beam loading and breakdown rate, PETS operation, acceleration and deceleration. Two-beam test stand and TBL. CLIC module integration: Cooling, Vacuum and instrumentation like wakefield monitor. Cost:

Schematic view of the structure development program dc spark testing High-power RF testing High-power RF constraints Technology Linac design Accelerating structure design PETS design Beam-based testing Pulsed surface heating tests Beam-based testing

People, organization and resources The CERN manpower working on structures comes from a number of sections, groups and departments. Roughly ¾ are in AB and ¼ are in TS . In AB most are from the RF group, in TS most are from the MME group. A significant effort comes even from outside of CERN Total number involved Total combined staff full-time on structures 4 staff part-time on structures* 9 3.5 Fellows, Doctoral students, and associates 7 Visitors at CERN 5 Guessing at outside CERN 4-5 Total 23.5 * not including services we pay for

People, organization and resources Most of the progress comes from the efforts of highly talented and highly motivated individuals who make their own direct contacts with each other. To increase the coherence of the radiated output from these individual sources, we have a weekly ‘team meeting’ (chaired by me). Here we have a broad exchange of information and a forum to describe work in progress and launch new ideas among colleagues. Presentations stored in a special directory. Over the past year a series of specialized meetings have been put into place and chaired by Germana (more information in talk) for work that requires precise coordination including: Test structure production - weekly Mechanical design – weekly Two-beam test stand – weekly CLIC module working group – biweekly Structure tolerances – approximately monthly Phone meeting with SLAC and KEK - approximately monthly Minutes of all these meetings are available on EDMS with actions clearly defined.

People, organization and resources Sergio holds a bi-weekly ‘Breakdown Studies’ meeting for detailed technical discussion among those, especially fellows and PhD students, working on the dc spark, rf breakdown and pulsed surface heating experiments. Then there is the ‘Structure Working Group’. Here larger subjects like testing plans, proposed new nominal CLIC and test structures, optimization results etc. are presented, discussed, possibly modified and approved. The makeup is the structure team plus other relevant members of the CLIC study. There is also the CTF3 operational meeting which is also used to discuss test results during 30 GHz testing.

People, organization and resources Last year we had a materials budget of 1.2 MCHF and we committed about 1.9 MCHF which just so happens to be this year’s budget.

Collaborators with specific linear collider expertise SLAC: High-power testing, pulsed-surface-heating testing, test structure fabrication and a significant exchange of ideas. KEK: Test structure fabrication and high-precision machining. High-power testing is planned. Cockcroft Institute (Roger Jones): Structure and beam dynamics simulations are planned. PSI (Micha Dehler): Interest in structure design and breakdown theory. (not Fermilab or DESY)

Active collaborators Helsinki Institute of Physics: Precision mechanical engineering. Breakdown simulation. Uppsala University: Two-beam test stand beam-lines, instrumentation and experiments. Breakdown experiments. CIEMAT: Test-PETS and RF components US High-gradient collaboration Gycom/Nizhniy Novgorod: High-power RF components Pakistan: Two-beam test stand hardware. Dubna: Pulsed surface heating experiment DAPNIA, SACLAY: Superconducting-level cleaning now. Next hopefully test accelerating structure fabrication and wakefield monitor.

Organization of this meeting New collaborators Frascati: Accelerating structure RF design. Ukraine: Plasma physics applied to RF breakdown and exotic materials Organization of this meeting web page