Survey on “Chargés de Consignation” Status Update

Slides:



Advertisements
Similar presentations
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
Advertisements

112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
1 1. Some recent views ( ) 2 Linac tunnel
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
V.Montabonnet - Safety during Hardware Commissioning 18 October Contents  Electrical circuits in the LHC context  Electrical Hazards  Preventions.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
East Area Renovation Project Team meeting # 2 – EDMS News
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
Identification of the unused cables
TE-MSC activities in SPS during LS2
LIU Consolidation project (INDICO ) E. Blanco BE/ICS
Forecasts for waste and radioactive material storage
EYETS LHC 2016/2017 Works EN/EL/CF
Injector De-cabling Project
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
Configuration Management and Layout Database ELENA Project
LIU–PLI report LIU PSB meeting.
Planning and Installation
Buffer Zones - Status Report
EN 4946 – Refurbishment of Electrical Substations
De-cabling strategy during YETS
n_TOF “Draft” plans for YETS and LS2
The ELENA Safety Documentation «time to prepare the safety clearance»
Quality Assurance applied to Accelerator Safety
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Update on the Ethernet Network Installation Campaign
PSB lock-out test - Organisation AP. Bernardes, D. Hay, C
Survey on “Chargés de Consignation” Follow-up
YETS PS + PS SWY + TT2 Facility Coordinator:
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Proposal for the modification of building 151 in view of the LS2 PS main magnet and TT2 consolidaiton projects Dominique Bodart TE-MSC-MNC 29/09/2017.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
HIE-ISOLDE Project: Planning & Resources
Implementation of RP training ranks in SPS and NA_target
Radiation Working Group RADWG
WP13 outsourcing: Hollow Electron Lens
Presentation transcript:

Survey on “Chargés de Consignation” Status Update AP.Bernardes/EN-STI, C.Bedel/EN-ACE, P.Gallay/EN-EL, D.Hay/EN-ACE, C.Mugnier/TE-EPC Acknowledgments: C.Bernard/HSE-SEE, G.Cumer/EN-ACE, J.Etheridge/EN-ACE

Survey on "Chargés de Consignation" Outline Introduction Survey - First output Planning Summary 24/06/2016 Survey on "Chargés de Consignation"

Survey on "Chargés de Consignation" Introduction Why this survey? Are the “Consignation électrique” practices homogenous between the machines? Are the Roles and responsibilities well established and understood for the process of “Consignation électrique” in injectors? Are we applying the CERN electrical rules on field or could we improve the situation? The purpose of this survey is to compare the practices and the electrical rules and to identify a consolidation action in view of LS2 (if needed) 24/06/2016 Survey on "Chargés de Consignation"

Introduction To perform this survey? We would like to use the PSB Booster – EYETS 2016 activities to assess the roles and responsibilities for the process of ”Consignation électrique” and assess the compliance with CERN rules It’s not the first time that this subject is treated. Different groups are investing time and resources to be prepared on that subject for EYETS-2016 and LS2 (TE-VSC, EN-ACE, etc.) 24/06/2016 Survey on "Chargés de Consignation"

Introduction Electrical Safety code C1 mentioned in C18-510 must serve as a guide CERN Procedure: EDMS 870262 Standard C18-510 defines roles and protocols for two types of electrical work “Travaux d’ordre électrique” “Travaux d’ordre non électrique” Guarantee a safe electrical intervention in any case 24/06/2016 Survey on "Chargés de Consignation"

Vacuum chamber exchange First output Electrical work Non Electrical work Vacuum chamber exchange Type Nbr Electrical Work 14 Non Electrical Work (civil engineering) 1 Uncertain? (Vacuum chamber BHZ151 magnet) 24/06/2016 Survey on "Chargés de Consignation"

Survey on "Chargés de Consignation" First output Roles and Responsibilities: Example De-Cabling project Roles (Defined in UTE C18-150) Names Elec. Hab. Requestor G.Cumer/EN-ACE « Chargé d’exploitation » Not identified  Do we have all group involved? No process in place to garanty exhaustiveness None « Chargé de consignation » (1er étape de consignation ) 14 groups identified by now « Chargé de consignation » for each group not identified BC/HC « Chargé de consignation ou chargé de travaux” CERN (2éme étape de consignation) B2/H2 « Chargé de travaux » (Supervision de travaux) EMTE work supervisor contractor Executant B1/H1 24/06/2016 Survey on "Chargés de Consignation"

Survey on "Chargés de Consignation" First output Definition of Roles Electrical Network: Ex: « Chargé d’exploitation »: Henri De Maynard EN/EL UTE C18-510 Electrical Training « Chargé d’exploitation » None « Chargé de consignation » in charge of the « 1er étape de consignation » BC/HC « Chargé de travaux » in charge of the « 2ème étape de consignation » B2/H2 Exécutant B1/H1 or B0/H0 Electrical Facility: Ex: « Chargé d’exploitation » POPS: JP.Burnet TE/EPC « Chargé de consignation »: First Line Injectors: Ex:« Chargé d’exploitation » PSB: ? 24/06/2016 Survey on "Chargés de Consignation"

First output Roles and Responsibilities: Example De-Cabling project Training status for « Chargés de Consignation » (Between 2013 and June 2016 – Initial or refrescher- courses – Staffs,Fellows and doctorants) Groups Nbr HC/BC training since 2013 Nbr BC training since 2013 BE-BI 5 34 BE-ICS 7 BE-RF 46 12 EN-CV 1 17 EN-EL 44 EN-STI 4 Groups Nbr HC/BC training since 2013 Nbr BC training since 2013 TE-ABT 17 31 TE-EPC 66 26 TE-MSC 16 14 TE-VSC 6 TE-MPE 3 28 Training does not mean « Habilité » « Consignation électrique » may be done by another group or by a contractor Acknowledgement C.Balle/HSE extract from training data base (from 2013). Numbers to be confirmed by groups 24/06/2016 Survey on "Chargés de Consignation"

Survey on "Chargés de Consignation" First output To be discussed with the groups involved in EYETS 2016 PSB: Do you have activities where your group is identified as « Chargé de travaux »? Explain the « consignation électrique » practice for the EYETS 2016 – PSB activities What « habilitation électrique » training has your “Chargé de travaux”? Do you know who the « Chargé d’exploitation » for the PSB is? How will you define what installation needs to be « consigné »? Who will perform the « 1rst étape de consignation »? Who will perform the « 2nd étape de consignation »? What “habilitation électrique” training has your “Chargé de consignation”? Do you use, fill and record the “attestation de consignation”? Do you use, fill and record the “autorisation de travail” when needed? 24/06/2016 Survey on "Chargés de Consignation"

Vacuum chamber exchange Planning Proposed Planning Electrical work Non Electrical work Vacuum chamber exchange TE/ABT: LM.Coralejo Feliciano : 6 juillet 2016 TE/MSC: A.Newborough: 10 August 2016 TE/VSC: J.Ferreira Somoza: 29 June 2016 24/06/2016 Survey on "Chargés de Consignation"

Survey on "Chargés de Consignation" Summary A survey concerning the good practices on « consignation électrique » is proposed. EYETS 2016 – PSB activities are considered to perform this survey. A list of points to be clarified has been identified thanks to a collaboration between EN/ACE, EN-EL, EN/STI, TE-EPC Input from groups is needed to get a clearer picture of the situation Feed-back should be ready in September HSE/SEE to be involved 24/06/2016 Survey on "Chargés de Consignation"

Safety and Operation review of the MEDICIS project Acknowledgments EN/ACE: C.Bedel, M.Bernardini, J.Coupard, G.Cumer, J.Etheridge, D.Hay EN/EL: N.Bellegarde, P.Gallay HSE/SEE: C.M.Bernard TE-EPC: JP.Burnet, C.Mugnier TE-HSO: T.Otto TE-MSC: JP.Tock 27/06/2016 Safety and Operation review of the MEDICIS project

Thank you very much! Questions?