The “Top Down” Approach of Diagnosing Below Rail Problems

Slides:



Advertisements
Similar presentations
Deterioration of Concrete Roads
Advertisements

Version RAILER SMS Track Structure Condition Index (TSCI)
1 Rail, traffic, sleepers, and fasteners in Australia A/Prof Alex Remennikov School of Civil, Mining and Environmental Engineering University of Wollongong,
By : Prof.Dr.\Nabil Mahmoud
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
WEAR OF RAILS Engr. Muhammad Hussain.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
Jean-Pierre Zaffiro Global Product Director, Tower Cranes, Manitowoc Cranes May 12, 2011 Counter the counterfeit Identifying and managing counterfeit tower.
SESSION 10 Special Design Considerations for Reinforced Concrete Pavements.
INTRODUCTION Session 1 – 2
FDOT Aviation Pavement Inspection Training Module 2 – Pavement Fundamentals – Overview Florida Department of Transportation Statewide Pavement Management.
1 Remaining Life of Concrete Sleepers: A Multifaceted Approach A/Prof Alex Remennikov School of Civil, Mining and Environmental Engineering University.
TRACK FITTINGS AND FASTENINGS
CE 515 Railroad Engineering
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
Pipe Supports and Restraints
A new Concrete Tie design Created by Rudy Niederer.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
RAIL CRC 1 A/Prof Alex Remennikov University of Wollongong, NSW Australia International Concrete Crosstie & Fastening System Symposium Research on Railway.
Module 2-5 Field Sampling and Testing.  Identify reasons for conducting field sampling and lab testing  Describe typical field sampling and testing.
Accident Train 61 Passengers 12 Amtrak employees 1 Fatality 3 Serious injuries 43 Minor injuries.
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
ELEMENTS OF RAILWAY TRACKS
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
Pavement Analysis and Design
1 Pertemuan 06 > Matakuliah: S0182/Studi Kasus Dalam Teknik Sipil Tahun: Juli 2005 Versi: 01/01.
ERT352 FARM STRUCTURES TRUSS DESIGN
Sersa Flash Butt Welding & Destressing System Presented by Martin Benkler Member of the Board Sersa(UK)Ltd.
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
THE WAY FORWARD or WHO SAID RESEARCH WAS EASY ?. Relationship between variables  x Y = (say) roughness after 5 years Poor Good Expectation for acceptable.
Water Services Training Group WRc FOG Project Legislation and Licensing.
RAILER SMS Track Inspection Version
MECHANISED BALLAST CLEANING DYNAMIC TRACK STABILISATION & UNIMAT
Use of Geo-composites to Optimise Track Renewals and Maintenance.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
USE OF GEOGRIDS IN FLEXIBLE PAVEMENT
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
CIHT Midland Branch Paper Competition 2010/2011 Moorgate Track Slab Helena Turner Pavement Consultancy Helena Turner Slide 1.
Technical Standards Branch Class B Bridge Inspection Course BIM Bridge Inspection and Maintenance Basic Structural Considerations INFRASTRUCTURE AND TRANSPORTATION.
2 ASPECTS: -Use of better designed, ICF coaches with better springing arrangements. -Better breaking system for safe and smoother rail travel. -Use of.
Elasto - plastic behavior of beam-to- column connections with fillets of steel bridge frame piers.
WEAR OF RAILS. TYPES 1. Wear on head of rail 2. Wear on ends of rail 3. Wear of rail on curve.
Troop 8 Truss Presentation. What are Trusses? A truss is a type of framework, usually comprising straight struts and ties, which is designed to be stiff.
AN OVERVIEW OF SHALLOW AND DEEP FOUNDATION SYSTEMS
Reactive to Proactive Approach to Track Maintenance on Indian Railways
Introduction Bridge members must be able to carry the loads applied to them. This presentation considers: how loads are applied to members how bridge.
Resistance and Tractive Effort
Permanent Way.
Sustainable maintenance of high-speed lines with mixed traffic
LATEST USE OF GROUND PENETRATING RADAR FOR RAILWAY APPLICATIONS
Steve Barlow Pandrol Asia-Pacific
ERT352 FARM STRUCTURES TRUSS DESIGN
Maintenance of Track carrying HAL - Deep Screening
HIGHWAY MAINTENANCE Failures in flexible pavement.
Chapter-2 Parts of Steel Bridges.
PAVEMENTS CEE 320 Steve Muench.
Introduction to Pavement Design
RAILWAYS, BRIDGES & TUNNELS
M.ASIM 2004-AG-1081 DEPTT.OF AGRONOMY.
WEAR OF RAILS.
Updating the failure probability of miter
Reviewing differential speeds: potential route linespeed improvements
Factors Affecting Pavement Design
CHAPTER THE TRACK.
UNIT I – RAILWAY PLANNING. PERMANENT WAY A System of rails fitted on sleepers which rest on ballast and everything supported by a sub- grade is known.
M.ASIM 2004-AG-1081 DEPTT.OF AGRONOMY.
lectures Notes on: Soil Mechanics
Presentation transcript:

The “Top Down” Approach of Diagnosing Below Rail Problems Authors: Mike Martin (QR), Tim McSweeney (CQU), Darryl Nissen (QR) AusRAILPLUS2005

Two basic steps involved: Introduction A common limitation of railway maintenance practice is the lack of a proper investigation to diagnose the cause of the problem before attempting a solution. Two basic steps involved: 1. Proper investigation of degraded track geometry by trained personnel; 2. Appropriate testing procedures to determine the root cause of the problem. AusRAILPLUS2005

Primary Objective To minimize the need for reconstruction by not allowing chronic problems to develop or go unrecognised/untreated. (To this could be added that we shouldn’t continue short term solutions when a long term ‘fix’ is the only economic solution) AusRAILPLUS2005

The “Top Down” approach In simplistic terms, this process involves: Data collection/Desktop review Field Inspection Sampling/Testing (if req’d). AusRAILPLUS2005

Step 1: Data Collection/Desktop Review Gross Tonnages/Speeds/Axle loads Sleeper type and spacing/Rail Size Capping layer present (?) Previous history (eg what was sleeper type or rail size previously; what tonnages has the track carried) What is the intended future usage in terms of traffic task, axle loads, tonnages, predicted life, etc? Resurfacing frequency Track Recording Car data Track Condition Index Rainfall data (especially recent events) AusRAILPLUS2005

Step2: Field Inspection (Essence of the “Top Down” approach) Inspect (in order) the following: Rails Sleepers Fastenings Ballast Capping Subgrade Drainage AusRAILPLUS2005

Glued Insulated Joints? Poor Welds? Incorrectly stressed rail? Example 1: Rail Corrugations present? Wheel Burns? Squat Defects? Poor Joints? Glued Insulated Joints? Poor Welds? Incorrectly stressed rail? Pull aparts? Buckles? Are there splash marks on the web of the rail indicating that ‘pumping’ has been occurring? AusRAILPLUS2005

Degraded (timber) sleepers present? Example 2 : Sleepers Degraded (timber) sleepers present? Damaged (concrete) sleepers present? Is sleeper spacing uniform? Are sleepers straight or at an angle? Is there pumping at the joints? (Often occurs for interspersed steel sleepers) AusRAILPLUS2005

Ballast depth: is it sufficient for task? Example 3. Ballast Ballast depth: is it sufficient for task? Has ballast deteriorated/broken down? (Often smaller sized ballast in the crib area compared to the shoulder area) Is there evidence of moderate or severe fouling? (Coal fines?) Are there ‘mudholes’/’pumping’ of sleepers present that may have resulted from ballast having lost its ability to drain water ? Does the ballast exhibit ‘rolling’ or discolouring to a dirty grey colour indicating the onset of ‘pumping’? AusRAILPLUS2005

Step 3: Field Sampling/Testing (Note that this step may only be necessary if the revious steps have failed to accurately identify the problem) Sampling of capping and/or formation to determine grading and plasticity (Atterbergs) Dynamic Cone Penetrometers (DCP’s) to determine subgrade strength Trenching to determine layer depths/presence of ballast pockets/presence of moisture GPR of long track lengths to determine ballast depths AusRAILPLUS2005

AusRAILPLUS2005