Study of the socio-economic impact of CERN HL-LHC and FCC-hh

Slides:



Advertisements
Similar presentations
Impact analysis and counterfactuals in practise: the case of Structural Funds support for enterprise Gerhard Untiedt GEFRA-Münster,Germany Conference:
Advertisements

Learning from Existing Evaluation Practices on the Impacts and Effects of Intellectual Property on Development Geneva 6th/7th October 2011 Evaluation Section.
Copyright © 2004 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Developed by Cool Pictures and MultiMedia Presentations Copyright.
23 Flexible Budgets and Performance Analysis Principles of Accounting
Business plan overview (1)
How Policy Evaluations and Performance Management are Used Maureen Pirog Rudy Professor of Public and Environmental Affairs, Indiana University Affiliated.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
Welfare Reform and Lone Parents Employment in the UK Paul Gregg and Susan Harkness.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Evaluation of an ESF funded training program to firms: The Latvian case 1 Andrea Morescalchi Ministry of Finance, Riga (LV) March 2015 L. Elia, A.
Beyond surveys: the research frontier moves to the use of administrative data to evaluate R&D grants Oliver Herrmann Ministry of Business, Innovation.
The Nature of Costs Chapter Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 09 Business Markets and Buying Behavior Part Four Customer Behavior.
Francesco Crespi University of “Roma Tre” Mario Pianta University of Urbino ISAE - Monitoring Italy 2007, Rome 18th October 2007 New processes, old patterns.
Universiteit Antwerpen Conference "New Frontiers in Evaluation", Vienna, April 24th-25th Reliability and Comparability of Peer Review Results Nadine.
Framework of Preferred Evaluation Methodologies for TAACCCT Impact/Outcomes Analysis Random Assignment (Experimental Design) preferred – High proportion.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
Impact of the inter-firm cooperation on company's performance: major changes during the economic crisis November 27, 2013 Oksana Kabakova.
Do European Social Fund labour market interventions work? Counterfactual evidence from the Czech Republic. Vladimir Kváča, Czech Ministry of Labour and.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
STEP - 4 Research Design 1. The term “research design” can be defined as, The systematic study plan used to turn a research question or research questions.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
The External Environment: Opportunities, Threats, Industry Competition, and Competitor Analysis 1.
Chapter 3 Learning Objectives
Food Product Development
Strategic Information Systems Planning
Chapter 3 Learning Objectives
CEDEFOP Session 2: Closer look at the roadmap Moving towards detailed analysis of occupations – use of expert opinion Production of Skills Supply and.
University of Ljubljana
Doing business with CERN Anders Unnervik
Optimize the HR Department to Support the Organizational People Strategy Enhance your HR departmental structure, process, technology, and capability to.
Introduction to Business (MRK 151)
Study of the socio-economic impact of CERN HL-LHC and FCC-hh
Purchasing supplies at CERN
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Purchasing supplies at CERN
The External Environment: Opportunities, Threats, Industry Competition, and Competitor Analysis 1.
L. Elia, A. Morescalchi, G. Santangelo
The External Environment: Opportunities, Threats, Industry Competition, and Competitor Analysis 1.
Purchasing supplies at CERN
Cooperation between CERN and Ukrainian Industries 2017
Chapter 1 Cost control & cost reduction
Study of the socio-economic impact of CERN HL-LHC and FCC-hh
Information for Decision-making Chapter Ten:
TENDERING PROCEDURE IT-3981/EN
Best practices ideas for improvement of industrial return
CIMA F3 Financial Strategy
ALIGNMENT RULE PROCEDURE
IT-4328/EN Bidders conference
History Dec 2015, FC Discussion about contract splitting
PROXIMITY AND INVESTMENT: EVIDENCE FROM PLANT-LEVEL DATA
Matching Methods & Propensity Scores
Matching Methods & Propensity Scores
ESF EVALUATION PARTNERSHIP MEETING Bernhard Boockmann / Helmut Apel
Chapter 5: Software effort estimation
26th Meeting of the Wiesbaden Group on Business Registers
Matching Methods & Propensity Scores
An Overview of Strategic Marketing
1/18/2019 1:17:10 AM1/18/2019 1:17:10 AM Discussion of “Strategies for Studying Educational Effectiveness” Mark Dynarski Society for Research on Educational.
Evaluating Impacts: An Overview of Quantitative Methods
ALIGNMENT RULE PROCEDURE
Class 2: Evaluating Social Programs
Class 2: Evaluating Social Programs
Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n „Innovation of Subject Financing of Building.
Estimating net impacts of the European Social Fund in England
IT-4464/EN Bidders conference
Presentation transcript:

Study of the socio-economic impact of CERN HL-LHC and FCC-hh Workshop on “The economic impact of CERN colliders: technological spillovers, from LHC to HL-LHC and beyond” May 31st, 13:30 – 15:30 Intercontinental Hotel, BERLIN Are CERN suppliers different? A quasi-experiment Andrea Bastianin (University of Milan) with Paolo Castelnovo (University of Milan), Massimo Florio (University of Milan) and Anna Giunta (Center Manlio Rossi-Doria, Roma TRE University)

Outline Introduction Data Methods Results Conclusions

Introduction

Aim Distinguishing features of the study: Identify the determinants of the probability of being a CERN supplier. Evaluate the impact of CERN procurement on profitability. Distinguishing features of the study: Reliance on counterfactual: what would happen to the profits of firms that are not CERN suppliers, if they were suppliers? Data about CERN potential suppliers: firms registered with CERN procurement that have not delivered any order yet. Relevance: A growing body of research investigates the economic impacts of Public Procumement of Innovation (PPI).

Overview of results “Play by the rules”: CERN’s procurement practices drive the probability of becoming suppliers. “Variety matters”: more diversified firms are more likely to get orders. “Innovate”: high-tech firms are more interesting for big- science labs and hence get orders more easily. “Science pays back”: CERN’s effect on profits is positive and statistically significant.

Data (with a focus on potential suppliers)

Details about CERN activity codes http://procurement.web.cern.ch/

Details about CERN activity codes

Details about CERN activity codes http://procurement.web.cern.ch/

Details about technological intensity of activity codes Classification of activity codes according to their technological intensity based on CERN experts’ assessment of a sample of 300 LHC orders > 10,000 CHF1. 23 two-digits hi-tech activity codes in classes 3-5. Lo-Tech Hi-Tech (1) very likely to be "off-the-shelf" orders with low technological intensity (3) mostly "off-the-shelf" but usually high-tech and requiring some careful specification (2) "off-the-shelf" orders with an average technological intensity (4) high-tech orders with a moderate to high specification activity intensity to customize products for LHC   (5) products at the frontiers of technology with an intensive customization work and co-design involving CERN staff. 1 Details in: Florio, M., S. Forte and E. Sirtori (2016). “Forecasting the socio-economic impact of the Large Hadron Collider: A cost–benefit analysis to 2025 and beyond.” Technological Forecasting and Social Change, 112, 38–53.

Who would like to collaborate with CERN? Potential suppliers Who would like to collaborate with CERN? Potential suppliers: firms registered with CERN Procurement Office that never delivered any order. In the 1991-2014 period: 2553 firms. A total of 7919 self-reported activity codes have been recorded spanning 59 CERN’s 2 digits codes.

Potential suppliers by country of origin (% of firms recorded as potential suppliers)

Potential suppliers by self-reported activity codes Share of Hi-tech and Lo-tech activity codes

Estimation sample Actual suppliers (AS): 867 firms that have delivered LHC- related orders (> 10,000 CHF) between 1991 and 2008. Potential suppliers (PS): 2553 firms registered with CERN Procurement Office that never delivered any order in the 1991- 2014 period. Matching CERN data and ORBIS data (with company accounts data): 886 firms (26% of original sample). AS = 323 firms (36% of total). PS = 563 firms (64% of total).

Estimation sample: timing 1991 1995 2008 2010 Registration Procurement ATE estimation 2014

Data: controls Controls xt are a set of time-invariant and time-varying variables belonging to two classes. Firms’ characteristics: Size: Log Total Assets (average over 2008-10); Reliability: Liquidity ratio (average over 2008-10); R&D intensity: Intangible Assets as % fixed assets (average over 2008-10). See e.g. Chan et al. 2001, JoF; Location: country fixed effects; Common idiosyncratic shocks: time fixed effects (for registration year).

Data: controls CERN’s procurement practices: Variety: Dummy = 1 if self-declared no. of activity codes > 1. Proximity: Dummy = 1 if firm is located in Switzerland or France. Procurement policy: Dummy = 1 for very poorly balanced countries (if Ind. Ret. Coef. for supplies < 0.3 when firm registered). Firms in very poorly balanced Memeber States have a priority in tendering preocedures for orders > 100,000 CHF. Two alternative proxies of technological intensity: Dummy = 1 if at least 1 of the self-reported act. code is classified as hi-tech. Categorical variable with share of self-reported hi-tech act. codes (0%, 1%-25%, 26%-50%, …, 100% of total registered activity codes). return coefficient = ratio between a country’s percentage share of the value of all contracts during the preceding four calendar years and its percentage contribution to the CERN Budget over the same period Limited tendering is used to improve the return coefficient for supplies to Member States with a very low return coefficient (i.e. below 0.3). In this case, firms from other Member States cannot participate in these tendering procedures. Alignment is used to give priority to firms in poorly-balanced countries. For instance, if the lowest bid is posted by a firm in a well-balanced country, CERN negotiates with the two lowest bidders in poorly-balanced Member States, provided that their bids fall within 20% of that of the lowest bidder. If one of these two firms aligns its price to that of the lowest bidder in the well-balanced country, it gets the contract. When technically feasible, contracts can also be split among multiple bidders to give an advantage to firms in poorly-balanced countries, even if they have not posted the most economically convenient bid. Non-competitive tendering is used also when: (i) for reasons of standardization or strategic constraints the product or service must be supplied by a certain firm (single source procurement); (ii) when there exist only one firm proposing a given product or service (sole source procurement).

Methods

A program evaluation look at CERN procurement Aim of program evaluation (PE): to measure the impact of treatment on outcome for a set of statistical units. Units = firms; Treatment = being a LHC supplier; Outcome = Earnings Before Interest and Taxes, EBIT in 2010 ( profits) Characteristics of the methodology: There is a vast literature on the econometrics of PE James J. Heckman won the Nobel in 2000 for his contributions to the PE. The survey by Imbens and Wooldridge (2009, JEL) cites over 300 references.

Propensity score matching in a nutshell Use a model for binary dependent variables (i.e. logit) to estimate the probability of being supplier: p(xt) = Pr(treatment | xt). where xt are control variables capturing firms’ characteristics and CERN’s procurement practices. Match actual and potential searching “intersections” in their estimated propensity score, p(xt). Estimate Average Treatment Effect (ATE) where ATE is difference in EBIT between actual and potential suppliers, once the characteristics that determine assignment to treatment have been accounted for. Aim of steps 1-2 is to approximate a sample design, where firms are randomly assigned to treatment.

Results

Estimates of the probability of being CERN suppliers Logit model for binary dependend variables

Estimated probability of being CERN suppliers (Model 1) Lo- VS Hi-Tech firms in well/poorly balanced and very poorly balanced countries

Estimated probability of being CERN suppliers (Model 1) Lo- VS Hi-Tech firms in well/poorly balanced and very poorly balanced countries Base case DProbability

Estimated incremental probability of being CERN suppliers With respect to lo-tech firms in a well or poorly balanced country (Model 1)

Estimates of the CERN effect With Hi-tech dummy

Conclusions LHC procurement is associated with an increase in the profitability of firms. Positive impact on EBIT. As a side effect propensity score matching delivers some insights on the CERN procurement strategy. The way ahead… Quantile approach: Estimate the entire distribution of ATE for EBIT and other measures. Work on the timing of the analysis. Add robustness checks: change x and implement different matching algorithms.

Additional Results

Estimates of the probability of being CERN suppliers Logit model for binary dependend variables – without time fixed effects

Estimates of the «CERN effect» With Hi-tech categorical variable – with time fixed effects

Propensity score estimation: controls, xt concept variable FIRM Size Avg. log Total Assets in 2008-10 Reliability Avg. Liquidity ratio 2008-10 R&D intensity Avg. Int. Ass. as % fix. asset 2008-10 Location country fixed effects Common shocks time fixed effects (for registration year) CERN Variety 1 if No. activity codes>1, 0 if = 1 Proximity 1 for Switzerland & France Procurement policy 1 if very poorly balanced Tech. Intensity 1 if Hi-tech (at least 1 act. code) Share Hi-tech Act. Codes (Categorical)