“Should Cost” Analysis

Slides:



Advertisements
Similar presentations
Tomeka Williams, Professor Of Business-Cost and Financial Management Defense Acquisition University-CNE “Should Cost” Analysis.
Advertisements

Closeout (Preparing for the End)
4/28/2015 Presented by David McQuay, Jr., CPA 1 Non-Profit Financial Management Florida Non-profit Housing, Inc. Self-help Housing Conference.
Contract Pricing and Pricing Strategies
Accounting System Requirements The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations 1 Further.
WELCOME! Small Business Boot Camp 3 What are Rates, Build Ups, Pricing and Cost Centers?
DCAA – WHO WE ARE and WHAT TO EXPECT
Congress and Contractor Personal Conflicts of Interest May 21, 2008 Jon Etherton Etherton and Associates, Inc.
Cost Accounting Standards Accounting 6310 Richard McDermott, Ph.D.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Pertemuan 9 Department Organization Matakuliah:A0274/Pengelolaan Fungsi Audit Sistem Informasi Tahun: 2005 Versi: 1/1.
Basic Financial Requirements for DoD Government Contracting 2015 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Contract Pricing – Certified Cost or Pricing Data
Determine the Difference between Internal and External Cost Reporting © Dale R. Geiger
The Brooks A&E Act National Oceanic & Atmospheric Administration Acquisition & Grants Office January 24, 2006.
Fed Acq 101 Speaker: Sterling Whitehead. What does Sterling do? Contract for goods and services Write RFPs and RFQs Translate rocket science into everyday.
Grant Requirement Reminders Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
GWAC Ordering Procedures Overview
Nuts and Bolts of Government Accounting
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Documenting the Participation of Fishing Vessel Crew Members in Alaska’s Commercial Fisheries Documenting the Participation of Fishing Vessel Crew Members.
Courses that Meet Government Contractor Needs
COMPETITION REQUIREMENTS
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
1 Always Changing / Always Challenging Accounting for Government Contracts.
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
FAR Part 31 Contract Cost Principles and Procedures.
U.S. DEPARTMENT OF LABOR EMPLOYMENT AND TRAINING ADMINISTRATION ARRA GREEN JOB AND HEALTH CARE / EMERGING INDUSTRIES NEW GRANTEE POST AWARD FORUM JUNE.
Georgia Institute of Technology CS 4320 Fall 2003.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
1 Internal Audit. 2 Definition Is an independent activity established by management to examine and evaluate the organization’s risk management processes.
Copyright  2003 McGraw-Hill Australia Pty Ltd PPTs t/a Auditing and Assurance Services in Australia by Gay & Simnett Slides prepared by Roger Simnett.
Pricing Services Contracts Air Force Materiel Command Bill Sain HQ AFMC/PKPC DSN I n t e g r i t y - S e r v i c e - E.
1 Test Operations Contract RFP Volume III ITO Briefing RFP NNS09ZDA008R – TEST OPERATIONS CONTRACT (TOC) Ground rules This presentation is intended to.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Introduction to Procurement for Public Housing Authorities Independent Cost Estimates and Cost/Price Analyses Unit 3.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Small Business Insight Into the Business System Review and Audit Process Business Systems Overview.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
Commercial Item Acquisitions: A Brief Update
Western Michigan University Central Power Plant
FAR Part 2 - Definitions of Words and Terms
The Administration’s Small Business Agenda
“Should Cost” Analysis
Administrivia Settings Controls Attendees Record
Small Business and Subcontracting.
2015 Leadership Conference “All In: Achieving Results Together”
Internal and Governmental Financial Auditing and Operational Auditing
Costs and Economics of Construction
(Additional materials)
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
BUS 315 Education for Service-- snaptutorial.com.
BUS 315 RANK Lessons in Excellence-- bus315rank.com.
BUS 315 Teaching Effectively-- snaptutorial.com
What PIs working on federally sponsored projects need to know.
Cost or pricing data John Cancellara 7 March 2018.
A Pricing Perspective on Contract Cost/Price Analyst
United Nations Voluntary Fund on Disability (UNVFD)
Omnibus IV Contracting Strategy Michael D’Alessandro
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Certified Cost or Pricing Data vs
DLA Land and Maritime Pricing Overview
Presentation transcript:

“Should Cost” Analysis Tomeka Williams, Professor Of Business-Cost and Financial Management Defense Acquisition University-CNE

Society of Cost Estimating Glossary SHOULD COST A concept of contract Pricing that employs an integrated team of Government Procurement cost and price analysts, contract administration, auditors, and Engineering representatives to conduct a coordinated, indepth Cost review and Evaluation of a program at the contractor's plant. Its purpose is to identify uneconomical or inefficient practices in the contractor's management and operations, to quantify the findings in terms of their impact on cost, and to develop a realistic price objective for Negotiations or for the program that reflects the results of the shouldcost effort. SHOULD COST ESTIMATE An Estimate of contract price which reflects reasonably achievable contractor Economy and Efficiency, and is developed by a Should Cost analysis at a contractor's plant.

Should Cost Estimate Addresses costs of specific contracts, not a full life-cycle costs. Purpose: Identify uneconomical or inefficient practices in contractor’s management or operation Quantify findings in terms of cost Develop a realistic price objective for negotiation or for the program that reflects the should cost effort An SCE does not address the life cycle cost of a system, but rather addresses the cost for a specific contract. It is, "A concept of contract pricing that employs an integrated team of Government procurement cost/price analysts, contract administration, audit, and engineering representatives to conduct a coordinated, in-depth cost review and evaluation of a program at the contractor's plant. Its purpose: to identify uneconomical or inefficient practices in the contractor's management and operation, to quantify the findings in terms of their impact on cost, and to develop a realistic price objective for negotiation or for the program that reflects the results of the should-cost effort” A distinct difference between and SCE and other “estimates” is that it does not use a “build-up” approach to arrive at a cost. Rather, it is based on an existing proposal which the contractor has submitted. From this proposal, excursions are made which decrement the proposed price based on findings of the production and overhead teams. The SCE is normally conducted by the procurement community with price or cost analysts as a member of the team. Definition: Taken from the National Estimating Society Dictionary, Fall 1986

Should Cost Estimate, continued Typically employ two teams Production Overhead Teams work together to evaluate and challenge a contractor’s existing methods, materials, facilities, work force, management, and operating procedures Based on contractor’s proposal Results can be used to negotiate new Forward pricing Agreements A should-cost team generally is made up of two groups: 1) production program and 2) overhead. The teams work together to evaluate and challenge the contractor’s existing methods, materials, facilities, workforce, or management and operating systems. The production team focuses on direct cost and manufacturing aspects such as operations, management, pricing, engineering, material, and manufacturing and quality assurance. The overhead team focuses on indirect labor, non-labor costs, sales/base ratios, and integrates the should-cost results. These results are given to the Administrative Contract Officer who uses the information to negotiate a new Forward Pricing Rate Agreement.

Should Cost Review –FAR 15.407-4 -- Should-Cost Review. (a) General. (1) Should-cost reviews are a specialized form of cost analysis. Should-cost reviews differ from traditional evaluation methods because they do not assume that a contractor’s historical costs reflect efficient and economical operation. Instead, these reviews evaluate the economy and efficiency of the contractor’s existing work force, methods, materials, equipment, real property, operating systems, and management. These reviews are accomplished by a multi-functional team of Government contracting, contract administration, pricing, audit, and engineering representatives. The objective of should-cost reviews is to promote both short and long-range improvements in the contractor’s economy and efficiency in order to reduce the cost of performance of Government contracts. In addition, by providing rationale for any recommendations and quantifying their impact on cost, the Government will be better able to develop realistic objectives for negotiation. (2) There are two types of should-cost reviews -- program should-cost review (see paragraph (b) of this subsection) and overhead should-cost review (see paragraph (c) of this subsection). These should- cost reviews may be performed together or independently. The scope of a should-cost review can range from a large-scale review examining the contractor’s entire operation (including plant-wide overhead and selected major subcontractors) to a small-scale tailored review examining specific portions of a contractor’s operation.

Should Cost Review –FAR (b) Program should-cost review. (1) A program should-cost review is used to evaluate significant elements of direct costs, such as material and labor, and associated indirect costs, usually associated with the production of major systems. When a program should- cost review is conducted relative to a contractor proposal, a separate audit report on the proposal is required. (2) A program should-cost review should be considered, particularly in the case of a major system acquisition (see part 34), when -- (i) Some initial production has already taken place; (ii) The contract will be awarded on a sole source basis; (iii) There are future year production requirements for substantial quantities of like items; (iv) The items being acquired have a history of increasing costs; (v) The work is sufficiently defined to permit an effective analysis and major changes are unlikely; (vi) Sufficient time is available to plan and adequately conduct the should-cost review; and (vii) Personnel with the required skills are available or can be assigned for the duration of the should-cost review. (3) The contracting officer should decide which elements of the contractor’s operation have the greatest potential for cost savings and assign the available personnel resources accordingly. The expertise of on-site Government personnel should be used, when appropriate. While the particular elements to be analyzed are a function of the contract work task, elements such as manufacturing, pricing and accounting, management and organization, and subcontract and vendor management are normally reviewed in a should-cost review. (4) In acquisitions for which a program should-cost review is conducted, a separate program should-cost review team report, prepared in accordance with agency procedures, is required. The contracting officer shall consider the findings and recommendations contained in the program should-cost review team report when negotiating the contract price. After completing the negotiation, the contracting officer shall provide the ACO a report of any identified uneconomical or inefficient practices, together with a report of correction or disposition agreements reached with the contractor. The contracting officer shall establish a follow-up plan to monitor the correction of the uneconomical or inefficient practices. (5) When a program should-cost review is planned, the contracting officer should state this fact in the acquisition plan or acquisition plan updates (see subpart 7.1) and in the solicitation.

Should Cost Review –FAR (c) Overhead should-cost review. (1) An overhead should-cost review is used to evaluate indirect costs, such as fringe benefits, shipping and receiving, real property and equipment, depreciation, plant maintenance and security, taxes, and general and administrative activities. It is normally used to evaluate and negotiate an FPRA with the contractor. When an overhead should- cost review is conducted, a separate audit report is required. (2) The following factors should be considered when selecting contractor sites for overhead should-cost reviews: (i) Dollar amount of Government business. (ii) Level of Government participation. (iii) Level of noncompetitive Government contracts. (iv) Volume of proposal activity. (v) Major system or program. (vi) Corporate reorganizations, mergers, acquisitions, or takeovers. (vii) Other conditions (e.g., changes in accounting systems, management, or business activity). (3) The objective of the overhead should-cost review is to evaluate significant indirect cost elements in-depth, and identify and recommend corrective actions regarding inefficient and uneconomical practices. If it is conducted in conjunction with a program should-cost review, a separate overhead should-cost review report is not required. However, the findings and recommendations of the overhead should-cost team, or any separate overhead should- cost review report, shall be provided to the ACO. The ACO should use this information to form the basis for the Government position in negotiating an FPRA with the contractor. The ACO shall establish a follow-up plan to monitor the correction of the uneconomical or inefficient practices.

When to do a Should Cost Estimate Some initial production has already taken place The contract will be awarded on a sole-source basis There are future year production requirements for substantial quantities of like items The items being acquired have a history of increasing costs The work is sufficiently defined to permit an effective analysis and major changes are unlikely Sufficient time is available to plan and conduct the should cost analysis adequately Personnel with the required skills are available or can be assigned for the duration of the should cost analysis The instructor should discuss each of the items on this and the following slide and give examples of each type of occurrence based on their experience.

REFERENCES Burt, David. (2010) Should Cost. AFIT. Retrieved on September 29, 2010 from http://www.airpower.au.af.mil/AIRCHRONICLES/aureview/1972/sep- oct/burt.html DAU (2010) BCF 204: Intermediate Cost Analysis, Chapter 1. pp 8-9. SEER. Should Cost Modeling: Taking the Guesswork Out of What a Project Should Cost. Retrieved on September 29, 2010 from http://www.galorath.com/index.php/seer_should_cost Should Cost / Should Cost Estimate Definition. Retrieved on September 29, 2010 from http://www.sceaonline.org/prof_dev/glossary-s.cfm FAR 14-407-7. Should Cost Review. Retrieved on September 29, 2010 from http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/15.htm#P6 83_138653 US. Army Material Command. Should Cost Analysis Manual. Retrieved on September 29, 2010 from http://www.dtic.mil/cgi- bin/GetTRDoc?AD=AD746253&Location=U2&doc=GetTRDoc.pdf

Further Information Armed Service. Procurement Regulations 3-807.2(C). Department of Defense, 1969. Raymond E. Harris “Should Cost,” briefing presented at 1970 DCAS Pricing Conference Proceedings, October 1970. “Recent Development and Future Trends In Government Contract Accounting,” The Federal Accountant, XIX. 3 (September 1970), 26. “Should Cost Is the New Weapons Test,” Business Week, May 30, 1970, pp. 48-49. Dr. Fred W. Forman, lecture notes on Should Cost used in Defense Weapon Systems Management Course, Wright. Patterson AFB, Ohio.