Rongli Geng ILC Cavity Group Meeting October 25, 2011

Slides:



Advertisements
Similar presentations
Cavity Yield-Cost Models Peter H. Garbincius Fermilab IWLC2010 – Geneve October 2010 filename: PHG cavity yield-cost models oct2010.ppt.
Advertisements

SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
New Results on Field Emission Suppression in EP Multi-Cell Cavities at JLab Rong-Li Geng Jefferson Lab ILC10, March 26-30, 2010, Beijing, China.
Latest Design of ILC ( RDR). 1.3 GHz technology developed by TESLA Collaboration, R&D from 1992 to reduce the cost per MeV by a factor of 20 from current.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Update on Global Cavity Database and Yield Evaluation DESY Database Group: D. Gall (DESY) V. Gubarev (DESY) S. Yasar (DESY) 28.Mar.2010Yamamoto/Ginsburg.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
August 16, 2007ILC Video Conference at FNAL Update on testing of Jlab fabricated 9-cell cavities P. Kneisel, G. Ciovati.
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Cornell Updates Commissioning of T-map for ILC single cell starts.
Strategy and Status of Reference Cavities for European XFEL
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC-SCRF Test Facilities considerations
Cavity Gradient R&D Status and Future Plans for TDP-2
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
STF Plan of gradient improvement
New Cavity Techniques and Future Prospects
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
Main Linac EDR Planning: Cavity Fabrication Discussion W. Funk / H
High Q via N infusion R&D at Jefferson Lab
S0 Status report from KEK
European-XFEL summary: Cavities/Modules performance
R&D Activity for Field Emission and Vertical EP
9-cell Vender Qualification test for LCLS-II
Recent VT Results in the STF-2 cavities
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Highlights from EU Global Design Effort
Mechanical Polishing of 1.3 GHz Niobium Cavities
TTC topical-meeting on CW SRF 2013
Nick Walker (DESY) EU GDE Meeting Oxford
LCLS-II High Q0 Cavities: Lessons Learned
Retreatment of Superconducting Cavities for the European XFEL
Vertical Test Results of 9-Cell Cavities for LCLS-II
TTC Meeting, 28 February - 2 March, 2011, Milan
LCLS-II HE R&D ongoing results
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Presentation transcript:

Rongli Geng ILC Cavity Group Meeting October 25, 2011 Cost Analysis of Cavity Production/Processing Strategies Based on Recent Gradient R&D Results Rongli Geng ILC Cavity Group Meeting October 25, 2011 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

ILC Cavity Gradient Design Values Average operational 31.5 MV/m Allowable spread up to ±20% (25.2 – 37.8 MV/m) Average vertical test qualification 35 MV/m Acceptable spread up to ±20% (28 – 42 MV/m) 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

Baseline Cavity Fab. & Proc. Recipe High purity sheet Nb forming and machining Electron beam welding Light BCP Bulk EP Vacuum furnace heat treatment Rinsing Field flatness tuning Final light EP Post-EP cleaning and high pressure water rinsing Clean room assembly, evacuation and leak check In-situ low temperature bake 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

R&D Results since RDR - I RDR goal: achieve ≥35 MV/m with 80% production yield R&D results since RDR and understanding ~ 20% of cavities will fail at 20 MV/m or lower due to fabrication/material defect (bad news) Yield after one pass processing (or the typical definition of production yield) demonstrated on a global basis at ≥35 MV/m is ~ 30% at ≥28 MV/m, ~ 70%??? (Present global yield plot does not contain yield information at ≥28 MV/m – this should be fixed because 28 MV/m is an important number, i.e. the minimum acceptable gradient for vertical test) 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

ILC 36th Cavity Group Meeting 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

Cost Analysis of the Over Production Model RDR assumes 25% over production (OP), based on assumption of 80% production yield (i.e. the yield after one pass processing) at ≥35 MV/m Total number of cavities need N Total number of cavities produced 1.25*N Total cavities accepted 1.25*N*0.8=1.00*N=N Ideal model for mass production Tolerate 25% produced cavities being “thrown away” 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

ILC 36th Cavity Group Meeting Consideration of the Over Production Model for the Present Cavity Gradient and Spread Design Choice Current ILC design gradient and spread for vertical test acceptance: average 35 MV/m with allowable spread of up to ±20% (28 – 42 MV/m) This is equivalent in stating that cavities qualified to ≥ 28 MV/m are all acceptable Even though the present yield at ≥ 28 MV/m is less than 70% on a global bases, one may expect a yield of 80% at ≥ 28 MV/m can be achieved (next slide) Then the question arises: can we stick to the 20-25% over-production model in line with the RDR? 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

ILC 36th Cavity Group Meeting 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

ILC 36th Cavity Group Meeting Consideration of the Over Production Model for the Present Cavity Gradient and Spread Design Choice (continued) Cost of an accepted cavity: C = Cf + Cp Cf: Fabrication cost Cp: Processing cost Normalize cost to Cf Typical ratio of Cp/Cf=0.2 Based on cost analysis of “production style” ILC cavity processing at JLab (spread sheet available) and typical present day fabrication cost of 9-cell cavities based on small orders For future high-volume production, both Cf and Cp may go down due to value engineering, but the Cp/Cf ratio likely to stay ~0.2 So C=1.2*Cf 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

ILC 36th Cavity Group Meeting Consideration of the Over Production Model for the Present Cavity Gradient and Spread Design Choice (continued) C=1.2*Cf 25% over production Total number of cavities produced 1.25*N Total cost to get needed cavities TC_OP=1.25*N*1.2*Cf = 1.50*N*Cf Reminder: tolerate 25% of produced cavities are “thrown away” after one pass processing Ultimately one needs to know the Gradient Distribution Probability (GDP) to verify whether the current ILC gradient spread choice is compatible with the ILC average gradient choice 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

R&D Results since RDR - II R&D results since RDR and understanding A second pass re-treatment or re-processing is found effective in raising gradient and yield (good news) 100% yield at ≥ 31 MV/m is possible if a data-driven second pass re-treatment/re-processing is allowed (next slide) Three main procedures (all in hand now) for second pass Re-HPR, when cavity is field emission limited after 1st pass Re-EP, when cavity reaches ≥ 25 MV/m but quench limited after 1st pass Repair (local grinding or mechanical barrel polishing of entire inner surface), when cavity is quench limited below ~20 MV/m after 1st pass 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

Effective gradient yield improvement if a 2nd pass RT/P is allowed 16 9-cell cavities based on recent results from US ART groups 94% JLAB + FNAL + Cornell Average gradient 39 MV/m 100% yield at ≥31 MV/m + + Average gradient 39 MV/m AES6 after CBP At FNAL ✔ AES5 After Mechanical Polishing at Cornell ACC15 after at FNAL Rongli Geng LCWS11, 9/26-30, 2008

ILC 36th Cavity Group Meeting Consideration of the Re-treatment Model for the Present Cavity Gradient and Spread Design Choice Reminder: realistically assuming 80% yield at ≥ 28 MV/m after 1st pass Reminder: 100% yield at > 28 MV/m if a data-driven second pass re-treatment/re-processing (RT/P) is allowed Cost analysis if 2nd pass RT/P is allowed Total number of cavities produced N Same as the total number of cavities needed 80% of cavities acceptable after 1st pass 20-25% need 2nd pass RT/P to become acceptable Total cost to get needed cavities (assuming 25% RT/P) TC_RT/P=N*(Cf+Cp)+0.25*N*Cp = N*Cf+1.25*N*Cp=N*Cf+1.25*N*0.2*Cf TC_RT/P= 1.25*N*Cf 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

ILC 36th Cavity Group Meeting Cost Benefit Analysis Significant cost saving benefit by allowing 25% 2nd pass re-treatment or re-processing as compared to allowing 25% over production 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

Additional Benefit from RT/P Further analysis requires knowledge of gradient distribution of probability p(G) p RT/P tends to push p(G) upward, hence higher average gradient 1 G Gr Gu Gr: Rejection limit, below which cavity not acceptable Gu: ultimate limit, above which physically not possible 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting

Next Step and Required Inputs Get GDP from the available data This allows to calculate average gradient Needed for “gradient margin” analysis Get breakdown table of RT/P fractions Needed for refined cost benefit analysis Useful for RT/P strategy to be reflected in TDR Get cost spread sheet for CBP Needed for analysis of cost saving potential to insert CBP into baseline processing recipe 10/25/11, R.L. Geng ILC 36th Cavity Group Meeting