Car Service Station : Shahad Alotaibi 201300688 , Wafa Alotaibi 201303306 , Maram alzahrani 201301283.

Slides:



Advertisements
Similar presentations
*This is an Example of Presentation Layout
Advertisements

Chapter 13 Proposals and Formal Reports
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Webinar #1 The Webinar will begin shortly. Please make sure your phone is muted. (*6 to Mute, #6 to Unmute) 7/3/20151.
March 3, ORGANIZING TO MAKE A PROFIT OBJECTIVES By the end of the session, participants should be able to: Appreciate the need for planning before.
Business Plan Guidelines. Purpose of Business Plan  Set Goals and Objectives for the Business  Resource Planning  Secure Funding.
© 2005 Virtue Ventures LLC. Licensed under a Creative Commons Attribution-Share Alike 3.0 License Feasibility Analysis For Social Enterprise.
The Cain Project in Engineering and Professional Communication WORKSHOP SERIES Giving Students Feedback on Oral Presentations.
Do it pro bono. Competitor/Collaborator Analysis Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Competitor/Collaborator.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
1. HOW TO WRITE AWARD- WINNING GRANT PROPOSALS 2.
P4.
BIS3324 Group Assignment – Schedule, guideline & templates (2015-Jan Semester)
OUR ASSESSMENT OF AND VISION FOR XYZ HEALTHCARE ORGANIZATION PREPARED FOR BOARD OF DIRECTORS TEAM MEMBERS: XXXXXXXXXXXX OCTOBER 2013 SEE STUDENT NOTE ON.
Paper Three: SWOT, Target Market, Positioning MKTG 241 Due: March 8, points.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
The Business Plan: Creating and Starting the Venture
Preliminary Business Plan. Challenge, needs What is the business challenge your product offers a solution to? Describe the pains/costs of not using your.
MGT 450 Entire Course FOR MORE CLASSES VISIT MGT 450 Week 1 DQ 1 Strategic Planning Process (New) MGT 450 Week 1 DQ 2 Mission Statements.
Cover slide Project, course, team, date. Outline welcome  1 slide introducing the key sections/ information items in this presentation.
XYZ Cricket Club Promotions & Communications Plan
Principal Investigator ESTCP Selection Meeting
Remove this white box to use the template
CMGT 410 aid Education Begins/cmgt410aid.com
Office 365 Security Assessment Workshop
THE 4 STAGES OF EXPORT PREPARATION E X P O R T P L A N
The ADDIE Instructional Design Process
Chapter 2 The Marketing Plan
Group members: Areej Al-Sayari. ID: Interior Design .
Creating a Proposal Using Work Groups
Creating a Proposal Using Performance Team or Workgroups
SWOT Analysis Overview Hotel Level SWOT Analysis Template
Illustrate your football problem on the template on page 2
Creating a Proposal Using Performance Teams or Workgroups
Principal Investigator ESTCP Selection Meeting
Creating Proposals using Performance Teams or Workgroups
FFA Self-Assessment Session Planner
Remove this white box to use the template
Planning Reports and Proposals
Done By: Aysha Alansari Badriyah Almaghlouth Hanadi Alsubait
SWOT Analysis Use this space for description of Strengths: Point 1
CMGT 445 Competitive Success/snaptutorial.com
MKT 593 Competitive Success/snaptutorial.com
CMGT 445 MASTER Perfect Education/ cmgt445master.com.
CMGT 445 TUTORIAL Perfect Education/ cmgt445tutorial.com.
CMGT 445 Education for Service/snaptutorial.com
CMGT 445 Teaching Effectively-- snaptutorial.com.
Getting Started with Your Malnutrition Quality Improvement Project
Remove this white box to use the template
Planning Reports and Proposals
Product Pitch Template
Product Pitch Template
کنکور کارشناسی ارشد 93 مدیریت
Remove this white box to use the template
Remove this white box to use the template
Technical Report Writing
FINAL PRESENTATION AND PAPER
Chapter 2 Marketing Plan. Chapter 2 Marketing Plan.
A Commercialization Strategy for (your business/company name)
CLASS BUSINESS PROPOSAL
Chapter 13 Proposals and Formal Reports
Principal Investigator ESTCP Selection Meeting
Writing a Business Plan
Prepared by Dr. Anita Khatke
Downloadable Template
Principal Investigator ESTCP Selection Meeting
Welcome “Empowering the world, One Engineer at a time”
CJA/475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopcourse.com
CJA/475 CJA/ 475 cja/475 cja/ 475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopstudy.com
Presentation transcript:

Car Service Station : Shahad Alotaibi 201300688 , Wafa Alotaibi 201303306 , Maram alzahrani 201301283

Assessment Rubric for Group PowerPoint Presentation Criteria Assessment Rubric for Group PowerPoint Presentation SCORES Title/Outline slides Outline slide presents an overview of the presentation topics, picture 2% The project Describe the problem or project that is the focus of your proposal Analyzing the project Describe a SWOT analysis with 2 points for each letter. 4% Planning the solution Work plan diagram showing tasks and deadlines, description of the work plan, types of groups used, and the division of tasks 5% Executing the plan Describe when the group will meet, reporting structures, and how the group will ensure all tasks are completed on time Evaluating the results Discuss likely obstacles your group will face, how you will handle social loafing, and how you will maintain group cohesiveness Delivery Speaks clearly and confidently, looks at audience, does not read each slide word by word, keeps hands out of pockets 3% Slide attractiveness Slides are attractive to look at with easy to read font, graphics, colors, headings, and sufficient white space Conclusion Final slide summarizes the key points (does not repeat the Outline slide) TOTAL   25%

Outline Outline The Project Analyzing the Problem Planning the Solution Executing the Plan Evaluating the Results Summary

The Project The project aims to establish a car service station near the university. There is no car service station near the university. Breakdowns and servicing is challenging to access for students at the university. The objective of the car service station is to provide convenient and affordable services for the university.

Analysing the problem Strengths Readily available market Low start-up cost Strengths – There is a ready market in place from the university students and staff. Low start-up costs are also a strength due to affordable equipment and a readily available location. Weaknesses – Women are not allowed to drive in Saudi Arabia which reduces the available market. Another weakness is establishing an effective working schedule so that classes are not interfered with. Opportunities – There is a high potential for growth because the proposed car service station would be the first of its kind in the area. There is also the potential to expand and add more services such as car wash. Threats – There is the threat of potential competition once others realize it is a profitable business.

Planning the solution Draft a project proposal 0-4th Week Present proposal to university 5th – 8th Week Apply for business permit 9th – 10th Week Assess possible locations 11th – 12th Week Implement car service station 12th Week onwards

Executing the plan Proposal shall be executed according to defined guidelines. Once funding has been secured from the university, business permits shall be sought from relevant authorities. Locations shall be assessed near the university. The group members shall hold regular meetings to assess current progress of the project. The meetings shall also be used to hand out responsibilities to group members.

Evaluating the results Evaluate the deadlines to make sure they are realistic. Minimize social loafing. Ensure the university is involved on all aspects of the project. Prepare weekly reports on the progress of the project. Evaluate entire project after a year to determine profitability of the project.

Summary The DAPEE model is an effective project management tool. It helps managers plan out the project proposal in manageable steps. The project has been well defined in the proposal. A thorough SWOT analysis was conducted for the car service station. The solution was planned, executed and evaluated in accordance with DAPEE model.