Alternative ways to address growth

Slides:



Advertisements
Similar presentations
Using High Speed Rail to Achieve Connectivity and Integration Prof Andrew McNaughton.
Advertisements

Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Securing a safe, sustainable rail network Michael Roberts Chief Executive.
Hertfordshire County Council Scrutiny 20 May 2010 Gerard Burgess Partnerships Manager London Midland (D) (ii)
1 Delivering Through Partnerships Stephen Rhodes Passenger Services Director EMTA General Meeting 10 th November 2011.
The independent campaign for a better bigger railway.
HS2 and Airports Peter Fry, Public Affairs Manager HS2 Ltd CIC Economic & Policy Forum 17 Feb
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
Delivering a sustainable and future-proof railway in CP5 - and beyond 10 th February 2014 Tony Berkeley – Chairman, Rail Freight Group Institution of Railway.
1 HS2 - the Case Against Chris Stokes. 2 The issues Background Economic benefits The Business Case Environmental impact Technical specification The opportunity.
Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.
Delivers top speed of 90 mph in North Wales for first time Partnership funding £500k Welsh Assembly, circa £1m Railtrack Major investment in track, signalling,
Presentation to: Inaugural meeting of North East Rail Forum – July 2014 Jerry Farquharson Director of Business Planning First ScotRail.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
First Capital Connect St Albans City & District Council Overview & Scrutiny (Public Services) Committee 13 July 2011 Neal Lawson Managing Director First.
Quiz 1: Rail Transport Case Study, 2013 This quiz requires knowledge of the pre-release case study, the issues that lie behind it, and of the Unit 4b specification.
1Rail Group The Big Question Peter Wilkinson, Director, Rail Franchising.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
Public Infrastructure Management Public Transit. What is public transit? Modes.
Rail Reform – Czech Experience Zdeněk Tomeš – Martin Kvizda – Tomáš Nigrin – Daniel Seidenglanz – Monika Jandová – Václav Rederer.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
Stockport Key Centre Analysis 1 This PowerPoint presentation has been created to accompany GMTU Report 947 – GMATS Stockport Key Centre report Whereas.
1 Northern Hub – the business case Duncan Law 26 June 2012.
Earning Enhancing Schemes Sanjay Upreti PAM. Rolling Stock Assets Locomotives Diesel Electric Steam Total Wagons Coaches
Introduction to Transportation Systems. PART I: CONTEXT, CONCEPTS AND CHARACTERIZATIO N.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Crossrail 2 London Assembly Regeneration Committee.
Gridlock? – Transport in 2030 Solving Congestion in South East England 14 th November, 2007 Adrian Shooter Chairman, ATOC.
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.
Meeting the capacity challenge: The case for new lines Iain Coucher Chief Executive, Network Rail.
Martin Tugwell 17tNovember 2016
in Croatian Track access charging system
TfN Freight AND RAIL UPDATE
London to Birmingham Rail Line
High Speed Rail Some Development Principles
How can we encourage more private investment in Britain’s railways?
Public Conference December
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING
Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
Light Rail Enhancement Project
Creating connected and liveable cities: The Route 96 Project
The Freight RUS - a draft for consultation
1st November, 2016 Transport Modelling – Developing a better understanding of Short Lived Events Marcel Pooke – Operational Modelling & Visualisation Manager.
Network Rail Infrastructure Limited Interim Results 2006/07 1 April – 30 September November 2006.
Midlands Connect: A Pan Midlands Strategic Transport Partnership
North Wales Main Line - linespeed increase
Capital Programming Committee South Coast Rail Phase 1 Service
Delivering East West Rail
Creating connected and liveable cities: The Route 96 Project
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
East Coast Route Study November 2016 update.
Introduction to Micro-Transit / Demand Responsive Transit
KEYNOTE STAGE SPONSOR.
North Suburban Planning Council
Kent Route Study – Draft for Consultation
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
North Wales Main Line - linespeed increase
Presentation transcript:

Alternative ways to address growth Chris Stokes

Passenger numbers continue to grow strongly Virgin West Coast (VWC) passenger kms increased by 21% from 2010/11 to 2014/15 Average passenger loadings per train were 192 in 2014/15 (240 on Virgin East Coast) But average VWC load factors are still only 35%

But additional capacity into Euston is not an obvious priority.....

There are practical, affordable ways of increasing capacity on the West Coast Main Line (WCML) Pricing policy Adjusting the train service Longer trains Train configuration Demand management Signalling enhancements Infrastructure enhancements

Pricing policy At the time of initial privatisation, the long distance “saver”fare was regulated, and unrestricted tickets weren’t. This resulted in the structure for walk-on fares being frozen in time, resulting in artificial peaks, before and after the times when off-peak tickets can be used. The heaviest loaded trains from Euston are the first trains for each destination immediately at or after 1900. In contrast, Virgin services in the “peak period” are often poorly loaded (eg 41% loading for the 1840 Euston – Manchester) A more rational pricing structure would smooth peaks, without increasing average fares.

Train service pattern Train loadings can be equalised by fine tuning stopping patterns Significant additional evening peak capacity can be provided from Euston to Milton Keynes at no cost - at present 6 VWC trains stop to pick up only, even though the services involved have an average loading of less than 50%. This restriction is unique to the WCML; InterCity trains carry commuters to Reading, Luton, Bedford and Peterborough.

Longer trains Longer trains are almost always the most cost effective way of increasing rail capacity (passenger and freight) VWC trains are currently either 9 or 11 cars – lengths could be increased to 12 cars (11 for Liverpool) Euston commuter services are a mix of 8 and 12 car trains – could all be increased to 12 cars Birmingham, Manchester commuter trains could be increased from 3/4 cars to 8 (and HS2 does nothing for Manchester commuter capacity) Some expenditure would be required to lengthen depots and platforms – but at a tiny fraction of the cost of HS2

Train configuration Current 9 car trains are 3 first/6 standard, with 468 seats Current 11 car trains are 4 first/7 standard, with 589 seats. 12 car trains could be 3 first/9 standard, with 693 seats – an increase of 48% on the existing 9 car sets

Demand management Modern IT will allow introduction of instant seat reservations, with fully reservable trains – and maintain rail’s advantage as a walk-on mode. Together with a rational fares structure, this will deliver peak smoothing, and generate increased revenue This can be achieved years before HS2 opens “Reserve your seat as you walk across Euston concourse”

Signalling Enhancements Network Rail are claiming that “moving block” signalling and modern control systems can increase line capacity by up to 40% This is unrealistic: existing signalling provides 80 – 90 second headways on the WCML, but capacity is constrained by terminals, junctions, station stops and differential speeds eg 125 mph non-stop vs 30 mph average speeds of stopping trains on some sections. But with state of the art signalling, WCML peak capacity can be increased by, say, 2 trains an hour in each direction

Infrastructure Enhancements Rail routes do not have uniform capacity, nor single points where capacity is constrained. WCML capacity can be increased by, for example: Grade separation at Ledburn Junction, south of Milton Keynes Provision of a second northbound track between Brinklow and Nuneaton Provision of “dynamic loops” between Coventry and Birmingham Grade separation at Colwich, south of Stafford

Shouldn’t these actions be properly considered before committing to a £55bn project?