Supply Chain Customer Order Decoupling Point

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
© 2009 Pearson Prentice Hall. All rights reserved. Process Costing.
MBA 8452 Systems and Operations Management
Chapter 4: Manufacturing Processes. Learning Objectives How production processes are organized Trade-offs to be considered when designing a production.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Little´s law Skorkovský ,KPH,ESF.MU
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Irwin/McGraw-Hill 1 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the.
COMSOAL Computer Method for Sequencing Operations for Assembly Lines Lindsay McClintock OPERMGT 345 – 004 May 6, 2003.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Operations Management
Operations Management Dr. Ron Lembke.  Price / Quality / Speed?  Decoupling Point  Make to Stock – ready on the shelf – Breyer’s  Assemble to Order.
Manufacturing Processes
Dependent Events and Statistical Fluctuations
OPERATIONS MANAGEMENT for MBAs Fourth Edition
Chapter 6 Production Processes.
PRAVENDRA KUMAR.  A supply chain is the collection of steps that a company takes to transform raw components into the final product.  Supply chain management.
Chapter 9 : Layout Strategies
F-1 Applying Lean to Factory Homebuilding Dr. Mike Mullens, PE.
McGraw-Hill/Irwin.
Line Balancing Problem
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 5 Manufacturing and Service Process Structures McGraw-Hill/Irwin.
College of Engineering ENGR 1181 Engineering Education Innovation Center Quality and Productivity Lab.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Process Layout Chapter 7 July 20, 2005.
Customer and Market Focus Information and Analysis
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Assembly Line Balancing Introduction to Industrial Engineering.
Assembly Line Balancing
1 Lean Office – Layout & Cells
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Assembly Line Balancing Boeing Corporation
Operations Fall 2015 Bruce Duggan Providence University College.
Technical Note 6 Facility Layout
Solved Problem An inspection station for assembling printers receives 40 printers/hour and has two inspectors, each of whom can inspect 30 printers per.
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing and Service Processes
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
SchedulingProducingControllingSchedulingProducingControlling.
MANUFACTURING PROCESSES Chapter Seven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
MIS Topic # 2 1 Demand Management. MIS Topic # 2 2 Definitions: Demand Management: the function of recognizing and managing all demands for.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Manufacturing Processes
OPSM 301 Operations Management Spring 2012 Class 3:Process Types
Chapter 7: Manufacturing Processes
Key Learnings: Little’s Law
5 INVENTORY MANAGEMENT.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
CHAPTER 17 Process Costing.
SECTION 2 STRATEGIC DESIGN
Additional line balancing notes
An introduction to Factory Physics
Analytical Tools for Process Analysis and Improvement
1. Draw the precedence diagram.
Process Design and Analysis
Constraint Management
FACILITY LAYOUT Facility layout means:
Chapter 5 Process Analysis.
CHAPTER 17 Process Costing.
Chapter 6A Facility Layout 2.
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Manufacturing Production Planning
Assignment Capacity The recorded solution to the first problem is available at
Chapter 5 Process Analysis.
Presentation transcript:

Supply Chain Customer Order Decoupling Point Keep Source, Make, Deliver, Return in perspective The point at which inventory is positioned to allow entities in the supply chain to operate independently. The closer the point is to the customer, the quicker the customer can be served Lead times Benefits of being close? Examples? Benefits of being farther? Examples?

Decoupling Point Options Make to stock (in between made and deliver) Served finished goods Assemble to order (right at make) Use preassembled parts to make Make to order (closer to start of make heading towards source) Use raw materials to make Engineer to order (in between source and make) Work w/ customer to design and then purchase materials

Little’s Law Long term relationship between the inventory, throughput rate, and flow time A way to predict how many products are consistently in progress If we are finishing on average 50 desks a day and it takes 3 days to build a desk Day 1 = starting 50 Day 2 = continuing 50 plus starting another 50 Day 3 = finished 50, plus continuing 100 Day 4 = Finishing 100 plus starting another 50 Inventory = throughput rate x flow time

Assembly-Line Balancing Objective is to minimize the imbalance between machines or personnel while meeting required output Starts with the precedence relationships Determine cycle time Calculate theoretical minimum number of workstations Balance the line by assigning specific tasks to workstations

Wing Component Example TABLE 9.2 Precedence Data for Wing Component TASK ASSEMBLY TIME (MINUTES) TASK MUST FOLLOW TASK LISTED BELOW A 10 – B 11 C 5 D 4 E F 3 C, D G 7 H I G, H Total time 65 This means that tasks B and E cannot be done until task A has been completed

Wing Component Example TABLE 9.2 Precedence Data for Wing Component TASK ASSEMBLY TIME (MINUTES) TASK MUST FOLLOW TASK LISTED BELOW A 10 – B 11 C 5 D 4 E F 3 C, D G 7 H I G, H Total time 65 480 available mins per day 40 units required Cycle time = Production time available per day Units required per day = 480 / 40 = 12 minutes per unit Figure 9.12 I G F C D H B E A 10 11 5 4 3 7 Minimum number of workstations = 65 / 12 =5.42, or 6 stations