2017 WECC JSIS Report March 21, 2017.

Slides:



Advertisements
Similar presentations
Model Validation in Western Interconnection
Advertisements

Using Synchrophasors for Preventing Cascading Outages
Marianna Vaiman, V&R Energy
The Model Validation Story 1. You’ve heard this story before August 10, 1996 Accurate and up-to-date models are needed for reliable and economic grid.
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
and Trend for Smart Grid
Synchrophasors: Improving Reliability & Situational Awareness
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
1 1 Office of Science Lawrence Berkeley National Laboratory Distribution µ PMU Applications Joe Eto Emma Stewart
Introduction to Phasor Measurements Units (PMUs)
WECC Joint Synchronized Information Subcommittee
Smart Grid Projects Andrew Bui.
NASPI overview and update
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
Review of BPA Voltage Control Conference
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
PHAAUG – Peak Reliability
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
1 The Tres Amigas SuperStation VLPGO November 2011.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Overview of Real Time Grid Reliability Management Carl Imhoff Pacific Northwest National Laboratory January 27-29, 2004 Washington, D.C. Transmission Reliability.
20th Century Electric Transmission Grid
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
WECC Joint Synchronized Information Subcommittee Report Planning Coordination Committee Meeting March 22,
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
1 Dr.Wang Yingtao Engineer Power System Department CEPRI,China Nov 2006 R&D OF REAL TIME DYNAMIC MONITORING SYSTEM IN CHIHA.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Presenters Curtis Mansfield Jake Barker Pacific Power
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
MISO – Synchrophasor GPA Users Forum Sept 7th, 2011.
ISO-NE Synchrophasor Related Projects
Visibility Ramu Ramanathan 10/1/2007.
September 18, 2007 Regional Disturbance
The Model Validation Story
SCE Utility Update JSIS Meeting March, 2015.
Authors : P. Mukhopadhyay, Abhimanyu Gartia, Samit Kumar Saha,
A Future Oriented Data Platform for the Electric Power Grids
PMU Emulator for Power System Dynamics Simulators
in Smart Metering Solutions
Grid Integration of Intermittent Resources
APPLICATIONS OF GPS IN POWER ENGINEERING
Terry Baker Peak Reliability
RESEARCH, EDUCATION, AND TRAINING FOR THE SMART GRID
SMART TRANSMISSION GRID 1. Smart Transmission System Wide application of HVDC/ FACTS Wide Area Monitoring & Protection New Technologies: Substation Automation.
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
Experiences with Wind Plants and Stability Studies in Isolated Systems
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Module 4 Smart Grid Implementation Issues
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
NASPI PMU Data Application Classification
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
NASPI PMU Data Application Classification
WECC Joint Synchronized Information Subcommittee
Hongming Zhang EMS Applications Manager, PEAK RC
Presentation transcript:

2017 WECC JSIS Report March 21, 2017

Syncrophasor Technology Synchrophasors are precise time-synchronized measurements system voltages, frequencies, power, currents and angles Synchrophasors provide an unprecedented wide-area view of the power system dynamic state Every modern digital relay is PMU-capable Phasor Measurement Units Conventional SCADA High time resolution: 30 to 120 samples per second Scanned every 2 to 4 seconds Data is time synchronized at the source Time stamped in the control center

History of Synchrophasors in WECC WECC installed first PMUs in early 1990s PMU coverage and networking greatly expanded following 1996 outages Inter-utility network was developed Utilities researched, prototyped and deployed several PMU applications for engineering analysis However, the original PMU network was not reliable or secure for grid operations

Western Interconnection Synchrophasor Program Starting 2010 WECC operating entities and US government invested more than $108M in the synchrophaosr technology in the West Peak RC led Western Interconnection Synchrophasor Project Unprecedented visibility of interconnection-wide dynamic state WISP WAN: 16 participants exchanging real-time data 302 PMUs are reporting to Peak RC 8,472 signals, including frequency, voltage and current phasors Recognition – BPA project received Platt’s Global Energy Award for Grid Optimization in 2013

Values and Applications The value of the investment is unlocked by the applications that use the synchrophasor technology NASPI Value Proposition Paper: Improved grid reliability Improved system transfer capability Cost savings (compliance, maintenance) Renewable integration, public policies Applications: Engineering support Control room Automated controls

Oscillation Detection BPA developed and deployed Oscillation Detection Application in its control room in October 2013 The application went operational in June 2016 Scans 100+ signals for signs of growing or sustained power oscillations – when oscillation energy exceeds a pre-specified threshold Oscillation Detection displays are developed Alarms dispatchers when an oscillation is detected

Forced Oscillation Detection and Source Locating Peak RC project Forced Oscillation Detection (PMU data) Post-processing of WSU OMS estimates Runs every 1 minute online Detect any forced oscillations Oscillation Source Location (SCADA data) Triggered by Frequency Oscillation Detection Inputs are oscillation start and end times Retrieve all generator MW and MVAR SCADA data Two algorithms are used to analyze: PMA (Pattern Mining Algorithm) MVRA (Maximal Variance Ratio Algorithm)

Oscillation Detection Success Stories BPA detected sustained power oscillations coming from a wind power plant when power output reached about 90% of plant capacity BPA worked with plant owner and wind turbine manufacturer to fix the problem Wind Ramp Before Wind Ramp After 80 MVAR peak to peak oscillation

Oscillation Events Many events detected since 2013, including: Generator instabilities Hydro generator operating in rough zone Wind power plant control mis-operations Generator control interactions HVDC equipment failure Plant controller mis-operations

Frequency Event Detection Frequency Event Detection is deployed in its control room in 2014 Frequency and power charts are auto-generated Smart grid uses technology to enhance power delivery and use through intelligent two-way communication. BPA has long promoted smart grid technologies to improve reliability, reduce operating costs, and defer the need for new transmission infrastructure. BPA promotes new technologies through Technology Innovation projects. BPA is creating the business case to show how smart grid can help the region, utilities, and consumers. Map shows where frequency event originated

Frequency Event Analysis PMU data is used for baselining frequency performance for NERC BAL-003 BA Frequency Response versus the BA hydro generation on-line Generator performance assessment Smart grid uses technology to enhance power delivery and use through intelligent two-way communication. BPA has long promoted smart grid technologies to improve reliability, reduce operating costs, and defer the need for new transmission infrastructure. BPA promotes new technologies through Technology Innovation projects. BPA is creating the business case to show how smart grid can help the region, utilities, and consumers.

Islanding Detection An application you hope never need to use, but indispensable when you need it Smart grid uses technology to enhance power delivery and use through intelligent two-way communication. BPA has long promoted smart grid technologies to improve reliability, reduce operating costs, and defer the need for new transmission infrastructure. BPA promotes new technologies through Technology Innovation projects. BPA is creating the business case to show how smart grid can help the region, utilities, and consumers.

Power Plant Performance Monitoring PMU data is extensively used for power plant monitoring

Analysis of System Tests BPA and WECC perform system tests several times per year to stimulate power oscillations under controlled conditions 1,400 MW braking resistor is applied for half a second to “ping” the power system Wide-area data is analyzed to understand the inter-actions among the generators in the Western Interconnection

Real-Time Voltage Stability Assessement for IROL Monitoring at Peak RC V&R ROSE VSA is deployed for monitor voltage stability: San Diego area IROL NW Washington area IROL Calculates voltage stability limits over multiple stress scenarios

System Model Validation and Real-Time Transient Stability Studies Peak RC, WECC, GE, BPA developed a process of running dynamic simulations on a state estimator snapshot and comparing with PMU data A number of system events were validated Steps are taken towards running transient stability studies in real time 2015 Validated system models improve simulation accuracy NERC MOD-026, 27 require power plant model validation NERC MOD-033 requires system model validation

System Model Validation and Real-Time Transient Stability Studies Reminder – dynamic models in 1996 We improved A LOT because of WECC processes Reality Model

JSIS Activities Value Proposition – collaboration with NASPI and NERC SMS Technology outreach - “success stories” and “lesson’s learned” of infrastructure deployment Application development, demonstration and deployment Power system dynamic performance analysis

JSIS Activities – Value Proposition For Synchrophasor Program to be successful and sustainable, institutional support is essential – FTE and investment dollars Data quality remains a challenge For companies to make such commitments, they need to see value There are examples of the successful technology deployment, such as BPA and SDG&E “Success stories” and “lesson’s learned” of infrastructure deployment Presentations on value proposition and business case

Provided by Alex Ning, Peak RC

JSIS – Technology Outreach There are mature vendor-supported applications There are simple freeware data management systems Basic applications are available Model validation – power plant, system Performance analysis Frequency response Oscillation detection and source location

Thank you