Oil-Field Hydraulics Chapter 2 Production Equipment

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

Well Design PE 413 Surface Equipments and Placement Techniques
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
PETE 411 Well Drilling Lesson 17 Casing Design.
Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010.
Present Procedure for cutting stuck casing on Drilling PLATFORM
HVAC523 Soldering.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
Environmental Drilling By: Josh Humphreys October 8,2006.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Cutting and Threading Steel Pipe
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Installation. Indoor Unit Installation Typical Installation.
Petroleum Engineering 406
Drilling Engineering – PE311 Circulating System
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
BASIC MUD LOGGING.
RIG PROCESSES  Drilling, Coring, Directional Drilling & Survey.  Tripping, Wash & Ream, Fishing.  E- Logging.  Casing & Cementing.  Perforating &Testing.
Drilling Engineering – PE311 Rotary System
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
STEAM HEATING.
Lesson 25 Well Control, cont’d
Hydronic Mechanical Controls
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Petroleum Engineering 406 Floating Drilling
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Well Design PE 413.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Casing Design.
Artificial Lift Systems
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Petroleum Engineering 406 Floating Drilling
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Rotating System Students: DINESH JOSHI RAJNISH VERMA RAMDEEN BISHNOI
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Chapter 3 Well Completions. Two basic types: Open Hole Perforated Casing.
Valves.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1321 Oil-Field Hydraulics Chapter 1 Completion and Workover.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1321 Oil-Field Hydraulics Chapter 5 Blowout Prevention Equipment.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
VALVES IN PIPE LINES.
DOWNHOLE EQUIPMENT FOR CONPLICATED CONDITIONS
Chapter VIII Packer and Tubing Forces.
CASING.
Chapter 2: Casing Design Introduction and API Standards of Casings
Cementing How it is Done
14 Refrigerant Recovery, Recycling, and Recharging.
SUSTAINABLE DRILLING OF OIL & GAS WELLS
MAGM 262 Hydraulic Seals Mr. Conrado.
HYDROSTATIC DEVICE FOR
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Welcome! Drafting 2345: Advanced Pipe Drafting
Recent Advances in Oil and Gas Production Engineering
ADVANTAGE BRIDGE/FRAC PLUG S
Well Design - PE 413 Surface Equipments and Placement Techniques
CHAPTER 45 Engine Lubrication.
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Casing Design Workshop
Safety Practices: Cold Metal
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Presentation transcript:

Oil-Field Hydraulics Chapter 2 Production Equipment PTRT 1321 Oil-Field Hydraulics Chapter 2 Production Equipment

Introduction Many devices and tools used in a producing well Installed on the surface Control panels Injection pumps Control lines Flow couplings Safety valves Installed below the surface Mandrels Packers Landing nipples Subs Guides

Typical sub-surface equipment Some equipment is permanently installed Some installed only during workover Some equipment is run in as part of the original string Some run in on tubing or wireline

Christmas Tree (Well Head) Mechanical structure Spools Flanges Connections Hangers Control of fluid flow and pressure Valves Chokes Pressure gauges Carelessness can prove fatal

Component Descriptions Pressure gauges – display tubing, casing or annular pressures Gauge flange (cap) – seals the top of the tree (often a hammer fitting). Remove to allow access to the well for wireline, coil tubing or other workover units. Crown (swab) valve – isolate the well to allow access through cap Flow (cross) tee – allows tools to be run into the well while still producing Wing valve – shuts in the well for most routine operations not requiring access to the well bore

Choke – controls the amount of flow from the well Master valves – primary shut off valves, open most of the life of the well, lowest master valve used as last resort to avoid wear and tear Tubing hanger – supports the tubing string and seals off the casing annulus Casing valve – provides access to the annular space between the tubing and the casing Casing hanger – slip and seal assembly from which the casing is suspended Casing – string of pipe the keeps the wellbore from caving in and prevents vertical communication from one zone to another. Tubing – string of pipe through which produced fluids flow

Back-pressure valves Installed into the tubing hanger Two types available One-way check valve Flow only into the well Two way check valve Holds pressure in either direction Allow Christmas tree to be removed or replaced without having to kill the well

Type H Back Pressure Valve Type H Two-way Check Valve

Christmas Tree Removal Careful planning is a must Consider the following questions: Is the tree to be removed before or after the rig is moved in? Will service on the tree (if required) be at a shop or in the field? Is the manufacturer rep present and are spare parts available on site? Is the BOP equipment ready to be installed? Is the well to be killed or worked on under pressure (live)

Christmas Tree Removal (cont) Other considerations: All exposed flanges should be protected and all BOP flanges should be inspected and cleaned prior to use New seal rings should be available as metal seal rings cannot be reused Tubing and casing pressures should be checked with gauges KNOWN to be working. If the well is being killed the casing should be installed and cemented properly No communication between the casing and tubing should exist. All points of failure should be repaired

Removing the well head Kill the well by bullheading kill fluid into the formation Pumping fluid down the tubing and displacing the formation fluid back into the formation Calculate the tubing volume and note when that much kill fluid has been pumped A few interesting notes: Clear fluids can fall faster than they can be pumped (pressure will drop) Gas migrates faster than it is bullheaded Too much fluid pumped down hole can cause formation damage Increase in pump pressure should signal that the kill fluid has reached the bottom

Finishing steps Record the volume pumped and the pressures Shut in the well and check for pressure build up for about 1 hr Have a full opening valve available with proper threads and sized to fit the tree If no pressure build up occurs remove the tree and install a BOP stack

Casing Steel pipe that runs from surface to specified depth in well (4 1/2 to 20 inches) Hangs from casing hanger and cemented into the hole Several casings can be used to reduce cost Casing prevents lost circulation and comingling of well fluids Foundation for surface equipment

Liners Casing hung inside an existing casing Hangs from liner hanger installed near the bottom of the casing in which the liner is run Many reasons to use a liner Cost Isolate problems from other zones such as lost circulation Handling issues same as casing Inspect and careful handling Thread protectors removed only prior to stabbing the joint Sometimes a stabbing guide is used to prevent cross-threading

Liner hanger Supports the liner near the bottom of the last string of casing Both grip the inside of the casing Mechanical slips (j-slot and rotation) Hydraulic slips (hydraulic pressure pushes the slips outward)

Tubing Majority of wells are produced through tubing Protects casing from pressure and corrosion Tubing is suspended from the well head Sizes from fractions of an inch to several inches (2 7/8 and 2 3/8 common sizes) Strength classifications such as J-55 or N-80 Also available with protective coatings applied for corrosion protection

Work Strings Length of tubing or drill pipe used for workover or completion Can be the production tubing or replace the production tubing with drill pipe In either case tubing is removed, tools installed on the end and the tubing is run back in the hole Of course the OD must be small enough to fit into the well without restriction

Packers Seals the annular space between the tubing and the casing Protects the casing from pressure and reservoir fluids Multiple packers isolate multiple completions to prevent commingling Special packers are also available for squeeze cementing, acidizing and fracturing Often a gauge run is made (scraper and junk basket) to confirm full size through the length

Packer slips Elastomer seal

Setting the Packer Hydraulic – pump out ball seat near the bottom of the tubing provides the means to apply the setting pressure Mechanical – packer plus a seal assembly run in on tubing to the setting depth. Upper slips are released with right-hand rotation of tubing and then lower slips are set with upward tension on the tubing Electric wireline – electrical current sets off a small explosive charge in a setting assembly that gradually builds up gas pressure to set the packer. Sandline or slickline – similar to wireline except concussion from a go-devil dropped into the well sets off the charge

Seal Nipples Sometime installed in packers to prevent fluid and pressure from escaping between the tubing and the packer Run in on bottom of tubing and inserted into packer Latch type (locator) locks into packer so tension may be applied Sealing elements can be redressed at the job site if needed

Anchor Seal Nipple Assembly Locator Seal Nipple Assembly

Bridge Plug Set into casing to prevent fluid movement in the casing Permanent or retrievable Seals the well to provide added safety when removing the well head Can also be set between perforations to isolate lower zone while workover is performed on upper zone

Blast Joints Used in multiple completions Protect section of tubing opposite upper perforations against erosion and/or corrosion from produced fluids Abrasion-resistant steel or normal steel coated with plastic, rubber, tungsten carbide or ceramic

Safety Joints Special large-profile threads Quick release of tubing string from down hole equipment Parted by reverse rotation or shearing Used above tools that might become stuck in the hole Allows for upper sections of tubing to be retrieve and fishing or other workover tools to be used to recover stuck sections

Sliding sleeve Allows circulation between casing and tubing Installed in tubing Allows upper zone to be produced or shut off at later time Can be used for treating or acidizing a zone Ports can be opened and closed: Wireline Jarring

Mandrels Installed in tubing that allows communication between tubing and casing at the location of the mandrel Gas lift mandrel on which a gas lift valve is mounted Sidepocket mandrel allows gas lift valves to be installed and removed with wireline without pulling the tubing Other mandrels will accept plugs, subsurface control valves or downhole chokes

Landing Nipples Small sub into which flow-control devices can be installed ID slightly smaller that tubing ID Seating area for pump-down and wireline flow-control devices ID’s vary according to the tools they receive Larger ID’s used near the surface than at bottom to allow tools with different ID’s to be set in the same string Usually have a locking device to hold the tool in place

Seating nipples Provide a place in which flow-control devices can be installed and retrieved by wireline Can be used to set: Blanking plugs for shutting in the well or testing the tubing string Circulating blanking plugs Equalizing check valves Velocity-type safety valves Chokes to reduce surface flowing pressures Instrument hangers for pressure ro temperature recorders

Flow couplings Smaller landing nipple ID causes turbulent flow above and below Sand and other solids can erode the tubing as a result Flow couplings (collars) are installed in the tubing string above and below the landing nipple Usually choose the same ID as the tubing

Retrievable cementer Special mechanically-set packer Used to do: Squeeze cementing High-pressure acidizing job Well test Does not become part of the completed well

Cement retainers Special packers used in squeeze cementing Set with wireline or tubing Must be drilled or milled out Retainer valve closes when tubing is picked up and opens when tubing is set down Closed valve holds the final squeeze pressure as excess cement is circulated out Also keeps hydrostatic pressure from contacting the squeezed zone in low fluid level wells during batch squeeze

Circulating washers Used to acidize or wash perforations Straddle-type tool with swab cups or inflatable packers that can be replaced easily at the well site Sleeve on upper portion opens and closes circulating ports between the tubing and casing Swab cup spacing is adjustable to the desired zone can be isolated (6” to 42” in 6” increments) Ports are opened as tool is retrieved to allow fluid to drain from the tubing

Packer Milling Tools Usually faster and cleaner to mill a packer’s slips and retrieve the packer than drill through Only a small amount of the slips need to be cut to release a permanent packer Mill is labeled A Mill engaging the packer is labeled B Pick up device may be run in with the mill, latches onto the packer after it is cut loose A B

Junk and Boot Baskets Remove milled or drilled debris from a well Circulation sweeps cuttings into an inner chamber (basket) Heavy materials that cannot be circulated are thus caught and retrieved when the basket is retrieved. Caution to not apply excess torque or weight or fingers of junk basket may break Boot basket is similar but with narrow annulus to cause high velocity flow. As fluid leaves narrow annulus velocity drops suddenly causing the debris to drop vertically into the basket

Casing Scrapers Used to remove foreign substances from casing ID Scale Perforating burrs Cement Rotated or reciprocated Rubber blocks under the scraper blades to allow flex Caution to not excessive wear the casing

Casing Rollers Several rugged, heavy-duty rollers mounted on a mandrel Rollers mounted on different centerlines As tool rotates only one roller at a time contacts the casing Eccentric motion can restore collapsed, dented, or buckled to its normal diameter and roundness Operates with ample fluid circulation and slow rotation speeds

Centralizers Used to center in the well bore: tubing Casing Perforating guns Wireline tools For example can keep the casing centered in the hole while cementing. This allows turbulent flow needed to avoid void areas