R&D for Fundamental Power Coupler in SRF Mass-Production

Slides:



Advertisements
Similar presentations
Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
Advertisements

The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
- Motivation - Cleaning mechanism, technique & apparatus - Nb cavity results - Copper rf gun cleaning - Summary, open topics + next steps Detlef Reschke,
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
THERMAL CYCLE TESTS OF RF WINDOWS IN STF INPUT COUPLERS 2010/12/07 Masato Satoh (KEK) 1.
L. Ge, C. Adolphsen, K. Ko, L. Lee, Z. Li, C. Ng, G. Schussman, F. Wang, SLAC, B. Rusnak, LLNL Multipacting Simulations of TTF-III Coupler Components *#
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
ILC DR RF Cavity – D. Li DR Workshop, KEK, Japan 1 Design for the DR RF cavities and impedance issues Derun Li Center for Beam Physics Lawrence Berkeley.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
SPL Seminar 2012 BE-RF-LRF HOM couplers for SPL cavities Kai Papke 1 Comparison of different design approaches.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen,
Test Results of TTF-V Couplers for ILC H. JENHANI (CEA/IRFU) 1.
1.3GHz Input Coupler for ILC
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
13/Nov/ mm STF2 Coupler Design Content 1.Motivation 2.40mm Design 3.“Preliminary” Result by HFSS 4.“Tentative” Conclusion 5.Future.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Recent Result for the STF-2 Cryomodule Operation
Status of the M-ECCTD F. Peauger - P. Bosland
S1G Experiment Schedule Plan
Field Emission Minimization for LCLS-II
ILC10 Beijing Global Design Effort
ILC-SCRF Test Facilities considerations
Development of X-band 50MW klystron in BVERI
New Cavity Techniques and Future Prospects
MICE RF Cavity Simulations and Multipactor
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
World-Wide Fundamental Power Coupler meeting #3
FKPPL and FJPPL Joint Workshop
BAW Prep S1 Global Status Pilot Plant Status
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Recent SCRF Activities in IHEP
Notkestrasse 85, Hamburg, Germany
V. Veshcherevich Cornell University
Introduction to Jefferson Lab
CEPC RF Power Sources System
Multipacting Simulations of TTF-III Coupler Components*#
ADS Accelerator Program in China
Update on Dark current generation in ILC Main Linac
Performance Recovery at CEBAF
European Coordination for Accelerator Research & Development
Cavity Degradation Experience at S1-Global
V. Veshcherevich Cornell University
SRF Science and Technology
Presentation transcript:

R&D for Fundamental Power Coupler in SRF Mass-Production Y. Yamamoto, E. Kako, T. Matsumoto, S. Michizono, H. Sakai, A. Yamamoto (KEK) C. Arcambal, E. Cenni (IRFU/CEA) Kirk FJPPL Workshop 2017 @Strasbourg

FJPPL Workshop 2017 @Strasbourg Outline Recent Large-scale SRF Accelerators Motivation (Goals for this R&D) R&D Items Summary FJPPL Workshop 2017 @Strasbourg

On-going Large-scale SRF Accelerators In recent years, SRF accelerator with several hundred cavities is standard in the world! Project Region Particle Beam energy RF # of cryomodules # of cavities / cryomodule # of cavities # of couplers E-XFEL EU Electron 17.5 GeV 1.3 GHz 101 8 808 LCLS-II U.S. 4 GeV 35 280 ESS Proton 2 GeV 352 MHz (Spoke) 704 MHz (Med., High) 13 9 21 2 4 26 36 84 Many R&Ds for cavity have been well-done, but as for power coupler, not so… ↓ We’d like to focus on power coupler, especially, for mass-production like ILC. FJPPL Workshop 2017 @Strasbourg

Goals for Power Coupler R&D Optimization in preparation/inspection works and RF conditioning method Rinsing procedure Ultrapure water rinsing Ultrasonic rinsing Ozonized (O3) water rinsing Inspection tools What tools we can use Full or Semi-automation? RF conditioning method How many steps for optimization? Which technical interlock system is used? Cost reduction TiN coating-free ceramic Lower cost design We’d like to fix the optimum method in each item! FJPPL Workshop 2017 @Strasbourg

Test Samples for Ceramic & Copper Plating φ19 x 3 (20 pieces) 100 x 50, 25μm (20 pieces) We already fabricated some test samples of ceramic and copper plating for the rinsing R&D. We will check the rinsing effect for various rinsing conditions. After that, we will try for power coupler similarly, and compare the RF conditioning time. FJPPL Workshop 2017 @Strasbourg

Test Power Couplers & Test Bench (TETD) Product No. Serial No. Ceramic company Ceramic color Ceramic coating Warm #1, #2 E42130 14L001 14L002 NGK/NTK White TiN Cold #1, #2 Cold #3, #4 14L003 14L004 KYOCERA Gray free Ceramic Ceramic Warm part Cold part The both inner surfaces are copper-plated. FJPPL Workshop 2017 @Strasbourg

Various rinsing procedures Ultrasonic rinsing in E-XFEL Ultrapure water rinsing in STF O3 water rinsing in Super-KEKB 1st step: To be done for test samples Surface inspection by microscope Measurement of secondary electron emission 2nd step: To be done for test power couplers Comparison of RF conditioning time Courtesy of Sakai-san in ARES group Courtesy of W. Kaabi FJPPL Workshop 2017 @Strasbourg

How to check rinsing effect Ceramic: Measurement for secondary electron emission coefficient Copper plating: Inspection by microscope Peeling test by 3M tape SEE measurement device C. Arcambal recommended this 3M tape! Courtesy of Hisamatsu-san FJPPL Workshop 2017 @Strasbourg

Inspection tools for copper plating Semi-automatic inspection system for cavity in STF We already developed the semi-automatic inspection system for cavity, but still not for power coupler. That is actually necessary for power coupler? Or, it is enough for the manual inspection? Digital borescope (J-SCOPE) Rigid borescope (OLYMPUS) Digital borescope (OLYMPUS) Courtesy of Takenaka-san FJPPL Workshop 2017 @Strasbourg Courtesy of Tanaka-san Courtesy of Higo-san

RF conditioning method E-XFEL STF Vacuum I/L: 1~2 x 10-4 Pa Arc I/L: Warm part & Waveguide Electron emission I/L: none Ceramic temperature I/L: none, but <50℃ How many steps for pulse width is necessary? Which technical I/L is necessary? How much is the threshold level? Courtesy of W. Kaabi FJPPL Workshop 2017 @Strasbourg

Power Coupler with TiN coating-free ceramic Unusual vacuum level in higher RF duty ↓ T-mapping attached Unusual heating in tapered section High power test was interrupted Particle simulation was done Secondary electrons can propagate to tapered section Ultrasonic rinsing will be done Material search restarts New coupler will be fabricated Made in KYOCERA LSEEC Electrical Property Volume Resistivity ohm・cm - Surface Resistivity ohm/□ 1.2 X 1014 SEE Coefficient 3.2 Dielectric Constant 1MHz 8GHz 10.0 Dielectric Loss Angle 3 X 10-3 Many secondary electrons emitted from ceramic surface can propagate up to tapered section! FJPPL Workshop 2017 @Strasbourg PIC solver in CST

Enough budget for these R&Ds is expected in F.Y. 2018. Lower cost design Cost reduction is urgent issue for ILC! L. Evans There are two candidates for power coupler in ILC. How are they merged? Which design is lower cost? Enough budget for these R&Ds is expected in F.Y. 2018. FJPPL Workshop 2017 @Strasbourg

FJPPL Workshop 2017 @Strasbourg Summary Power coupler R&D for mass-production should be focused R&D for test samples is already starting New material for TiN coating-free ceramic is searching We will discuss the contents for this R&D during IPAC2017 in Copenhagen next week! FJPPL Workshop 2017 @Strasbourg