Overview of the PBN Airspace Implementation Processes

Slides:



Advertisements
Similar presentations
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Advertisements

Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
Overview of the PBN Airspace Implementation Processes
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
Enroute Design 1 Lead Instructor:
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN Plan Development Aviation Industry Forum 18 November 2009.
Continuous Climb Operations ( CCO )
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
ICAO Doc 9992 Manual On The Use of Performance Based Navigation (PBN) in Airspace Design Overview Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Enroute Design 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN Airspace Concept Process
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Area Nav: RNP Evolution
ICAO SARPS and Guidance Material
Performance Based Navigation
Introduction to PBN Seminar ICAO PBN Implementation 1.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
From RNP Divergence to Performance Based Navigation Convergence
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Aviation System Block Upgrades and NAV CANADA Planning
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
Performance Based Navigation The Future
Modernising the System
Introduction to Navigation Specifications
PBN OVERSIGHT IN AUSTRALIA
Overview of Continental En-route Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
Performance Based Transition
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
SIP/2012/ASBU/Nairobi-WP/7
Performance Based Navigation: Navigation Specifications
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Airspace Concept Workshop
Basics of RNP.
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
ICAO PBN Symposium Regulatory and Certification Forum
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Safety / Performance Criteria Agreeing on Assumptions
Good Design Practices Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Continuous Climb Operations ( CCO )
PBN ICAO HQ Activities Overview
Presentation transcript:

Overview of the PBN Airspace Implementation Processes BEIJING, CHINA; 30 JUN-11 JUL 2014

General Information SSID: Public@ICAOBeijing PWD: Welcome2icao

Schedule Overview

Schedule Overview

Overview Learning Objective: This presentation will discuss Understand the Processes involved in the planning, design, validation and implementation of a PBN Airspace Concept This presentation will discuss The activities that lead up to the implementation of a PBN Airspace Concept.

ICAO PBN Manual Doc 9613 Volume I Volume II Airspace Concept Implementation Processes Volume II Navigation Specifications

Airspace Design is documented in ICAO Manual ICAO Manuals Airspace Design is documented in ICAO Manual Doc 9992 – Manual on The Use of Performance-Based Navigation (PBN) in Airspace Design

ICAO Manuals CCO and CDO are documented in ICAO Manuals Doc 9993 – Continuous Climb Operations Manual Doc 9931 - Continuous Descent Operations Manual

PBN Implementation Processes High-level sequential outline of processes to use when considering PBN implementation

PBN Implementation Processes

PBN Enables the Airspace Concept COM NAV SUR ATM NAVIGATION APPLICATION NAVAID INFRASTRUCTURE SPECIFICATION PBN

Navigation Specification by Flight Phase OCEANIC / Enroute Remote (nonSUR) RNAV 10, RNP 4, RNP 2, Advanced RNP 2 RNAV 1/2 & RNP 1 STARs ARNP 1 STARs RNAV 1/2 & RNP 1 SIDs ARNP 1 SIDs RNP Approach RNP-AR Approach Notes: The numbers given in the table refer to the 95% accuracy requirements (NM) RNP 2 and Advanced-RNP 1 are expected to be included in a future revision of the PBN Manual; 1b means that the area of application can only be used after the initial climb of a missed approach phase 1c means that beyond 30 NM from the airport reference point (ARP), the accuracy value for alerting becomes 2 NM 1a means that the navigation application is limited to use on STARs and SIDs only; RNAV 5/2/1 RNP 2 Advanced RNP 2 or 1 Enroute Continental

Airspace Concept

Overview Learning Objective: This presentation will discuss Understand the Airspace Concept This presentation will discuss What is an Airspace Concept Why develop an Airspace Concept Who develops an Airspace Concept What is needed to develop an Airspace Concept What happens after the Airspace Concept is developed.

(Ground- Space-based) PBN Concept Review NAVIGATION APPLICATION 1 (Use of NS & NI) X RNAV RNP 3 NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE 2 (RNAV System Perf.) (Ground- Space-based) RNAV RNP X X Accuracy value

RNP 1 RNAV 1 RNAV and RNP Alert to Pilot 1 Nautical Mile 95% of flight time Track Centerline 1 Nautical Mile 95% of flight time RNP is not different from RNAV: it is more than RNAV The Key Extra Ingredient: On-Board Performance Monitoring and Alerting

PBN Enables Airspace Concepts COM NAV SUR ATM NAVIGATION APPLICATION NAVAID INFRASTRUCTURE SPECIFICATION PBN

Strategic Goals (Expected Benefits) Safety? Capacity? Efficiency? Environment? Access? Airspace Concept Airspace Concept COM NAV SUR ATM NAVIGATION APPLICATION PBN NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE RNAV RNP

What is an Airspace Concept? A master plan of the intended airspace design and its operation Describes the intended operations within an airspace Developed to satisfy explicit and implicit strategic objectives (improved safety, increased air traffic capacity, improved efficiency, mitigation of environmental impact) A fully developed Airspace Concept: Describes in detail the airspace organization and its operations Addresses all the strategic objectives identified for the project Addresses all CNS/ATM enablers Identifies all operational and technical assumptions

Why develop an Airspace Concept? Airspace Concept development provides a structured and systematic way of determining What is to be achieved in an airspace, and How it will be achieved The development process helps ensure Goals (expected benefits) of planned airspace structure are clearly stated; Objectives of the airspace change are met; and The means to achieve these goals are appropriate and feasible within the resources available to the airspace system

What does it look like? An Airspace Concept can be in any document format Maintain configuration control!

What is the most critical point in developing an Airspace Concept? Setting the appropriate objectives and scope Enables the project team to remain focused and the budget to be managed within the set time Most projects which fail to meet the intended goal do so because of poorly defined scope and objectives. Beware of project creep!

Once the Airspace Concept is developed, what’s next? Lay out a detailed program plan for the specific implementation(s) in the Airspace Concept ICAO sample action plans (domain-specific and comprehensive) Consider just as a starting point Adapt as needed to the specific circumstances of a project Steps not always conducted in strict sequence Certain steps may be conducted on a recurring basis as the project progresses Steps and the sequence in which they are performed in the project should be evaluated by the implementation team on the basis of experience and judgment

Airspace Concept Summary PBN

Questions??