Locational Net Benefit Analysis Working Group

Slides:



Advertisements
Similar presentations
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Advertisements

Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
BASELINE POLICY FRAMEWORK Dina Mackin, CPUC Workshop on Energy Efficiency Baselines April 28, 2015 California Public Utilities Commission1.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Integration Capacity Analysis & Locational Net Benefits Analysis Working Groups Kick-off Meeting May 12, 2016.
LNBA to Integrate and Optimize DERs for Maximum Value DRP--LNBA Methodology and Demonstration Workshop Dr. Eric Woychik, Strategy Integration, LLC 1 February.
MTS Working Group San Francisco F2F Agenda Mar. 23, 2015.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
1 Distribution Resources Plan [R ] Locational Net Benefit Analysis (LNBA) and Demonstration Project A (Demo B) Workshop California Public Utilities.
Locational Net Benefit Analysis Working Group June 9, pm – 3:30 pm CPUC Golden Gate Room, San Francisco drpwg.org.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
1 CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup: Meeting 2 – Distribution Planning Group (DPRG) Structure and Time Requirements.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
Locational Net Benefit Analysis Working Group
Multifamily Working Group Announcement Webinar
CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup:
LNBA Subgroup: Avoided Transmission Value
Integrated Capacity Analysis Working Group
Transmission-Distribution Interface Working Group Meeting
SEIA Perspective on Smart Inverter Functions
Pacific Coast Inter-Staff Collaboration Summit
Locational Net Benefit Analysis Working Group
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
Integrated Capacity Analysis Working Group
Locational Net Benefit Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Integrated Capacity Analysis Working Group
August LNBA Agenda Time Topic 1:00 – 1:15
LNBA Subgroup: Avoided Transmission Value
Rule 21 Working Group 2 Issue 6 subgroup
Middle States Accreditation Standards and Processes
Resource Adequacy Demand Forecast Coincidence Adjustments
Integrated Distribution Planning Process
Introduction to Growth Scenario Working Group
Inter-Staff Collaboration Summit
Integrated Capacity Analysis Working Group
Rule 21 Working Group 2 Issue 6 subgroup
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
Exit Capacity Substitution and Revision
Developments in Connecticut
Planning Reserve Margin
SIWG CALL ISSUES 27 AND 28 APRIL 4,
SIWG CALL ISSUES 27 AND 28 APRIL 4,
ICA Methodology Clarifications ICA Working Group 5/18/2016
Independent Energy Producers (IEP) Steven Kelly, IEP Policy Director
DER Growth Scenarios and Load Forecasts Working Group
California Transportation Electrification Activities
Capacity Access Review
Presentation transcript:

Locational Net Benefit Analysis Working Group October 19, 2016 Webinar drpwg.org

Agenda Time Topic 9:00-9:15 9:15-9:30 9:30-9:45 9:45-12:00 12:00-12:30 Introductions 9:15-9:30 B. Schedule of Reports 9:30-9:45 C. Update on deferability criteria Grid services (6.1.b) 9:45-12:00 E. Long-term refinement topics and interim report 12:00-12:30 F. Summarize/wrap-up

ICA and LNBA Working Group Background ICA and LNBA WG Purpose - Pursuant to the May 2, 2016, Assigned Commissioner’s Ruling (ACR) in DRP proceeding (R.14-08-013), the Joint Utilities are required to convene the ICA WG to: Refine ICA and LNBA Methodologies and Requirements Authorize Demonstration Project A and Project B CPUC Energy Division role Oversight to ensure balance and achievement of State objective (ensure adequate stakeholder representation in consensus statements, keeping WG activities on track with Commission expectations/needs, demonstration project results review, quality control on deliverables) Coordination with both related CPUC activities and activities in other agencies (IDER CSF WG, CEC and CAISO interagency matters, interconnection/Rule 21/SIWG, other proceedings that may impact or be impacted by locational value calculation such as AB 350/IRP and LTPP/TPP/RPS) Steward WG agreements into CPUC decisions when necessary More Than Smart role Engaged by Joint Utilities to facilitate both the ICA & LBNA working groups. This leverages the previous work of MTS facilitating stakeholder discussions on ICA and LBNA topics.

Schedule – tracking progress   May June July Aug Sep Oct Nov Dec Jan Feb Mar Apr Jun CPUC DELIVERABLES Demo B Report x Draft Final WG Report Long Term Refinement Report SHORT TERM DELIVERABLES 6.1.a LNBA Maps X 6.1.b Grid services X IDER LONG TERM REFINEMENT 6.2.1 (A) long-term location-specific benefits 6.2.1 (B) Smart inverters 6.2.1 (C) Alternatives to avoided cost method 6.2.1 (D) DER avoided cost in same substation OTHER: data

Schedule of reports LNBA & Demo B Category Report Oct Nov Dec Deadline Lead Author LNBA & Demo B Short-term IOU Final Report for Demo B 11/15-11/16 (tentative) – Final WG meeting to discuss issues before Dec. report 12/16: final report submitted Dec. 31* Each IOU, individually (3 reports) WG Final Report on LNBA / Demo B “short term” topics 11/30-Draft to WG 12/8: final stakeholder comments due MTS on behalf of WG Long-term Refinement WG Interim Status Report on LNBA “long-term refinement” topics 10/26: comments on scope due 10/31: draft to WG 11/7: final comments due 11/10: final report submitted Nov. 10 WG Final Report on LNBA “long-term refinement” topics Jun. 30

5. Interim Report Process 10/12: Initial Scoping Documents Submitted for four topics 10/19: WG Meeting Present Initial Scoping Documents Present Comments on Initial Scoping Documents 10/26: Stakeholder Written Comments on Initial Scoping Documents 11/1: Draft Interim Status Report Shared with WG 11/10 Interim Status Report Submitted

Update on deferability criteria and grid services (6.1.b)

Long-Term Refinements LNBA Working Group Meeting October 19, 2016

Agenda 6.2(1)(A): Locational Benefits Over Long-Term Horizon 6.2(1)(B): Locational Grid Services Provided By Advanced Smart Inverter Capabilities 6.2(1)(C): Alternatives Avoided Cost Method 6.2(1)(D): Effect on Avoided Cost of DER Working “in Concert”

6.2(1)(A): Locational Benefits Over Long-Term Horizon Based on experience, explore whether/how probability estimates could be made that undetected needs will arise the during distribution planning period procurement of DERs will avoid future upgrades beyond the distribution planning period Key questions: What is uncertainty within 10 year planning window and what are key drivers of uncertainty? What are “undetected needs”? Is it appropriate to estimate system needs/projects/costs beyond 10 year planning window? Can DER deployment mitigate these costs? What is the possible magnitude of these costs What are possible approaches to this issue? How should these be reflected in LNBA refinement?

6.2(1)(B): Locational Grid Services Provided By Advanced Smart Inverter Capabilities Examples of seven functions identified by SIWG: (i) Disconnect/Reconnect, (ii) Limit Max Real Power, (iii) Set Real Power, (iv) Freq-Watt Mode, (v) Volt-Watt Mode, (vi) Dynamic Reactive Current Support, (vii) Schedule Power Values and Modes Key questions: Any additions/subtractions to the seven functions? Which grid services enabled by each function? Which grid services enabled by smart inverter functions are included in LNBA and which are not? What new methodologies are needed?

6.2(1)(C): Alternatives Avoided Cost Method Key questions: What are alternative methods? “Deferral Value” based on Long-Run Incremental Costing? “Present Value” of alternative expansion plans including cost of customer interruptions “Reliability Differentiated Rates” “Annual Deferral Value” What are strengths/weaknesses/typical applications for each? What are data needs for each? What are some improvements to LNBA? Include full set of costs and benefits Use dynamic models Use marginal distribution costs Link ICA/LNBA and DER procurement and load forecasting Optimize subject to GHG constraints and minimizing ratepayer cost Test cost-causation hypothesis

Process to Achieve LNBA The process of determining the locational impacts of a DER (or portfolio of DERs) requires three steps: (1) determining the impact of the DER on the electric grid [using ICA]; (2) translating that impact into cost—whether an avoided cost (i.e., a reduction in overall cost of providing electricity via the electric grid) or an increased cost—for each of the components listed above; and (3) aggregating, into a single present value of locational net benefit impact, the identified costs across all value components, for the life of the DER being evaluated.

PG&E Distribution Resources Plan: Chapter 2 – Distribution Resources Planning Page 64

Example of Substation Capacity Deferral EE?

6.2(1)(D): Effect on Avoided Cost of DER Working “in Concert” Determine method for evaluating effect on avoided cost of DER working “in concert” (e.g. using a DERMS) in the same electrical footprint of a substation. Key questions: What are upgrades can be avoided/deferred? If requirements for avoiding/deferring DERs are technology neutral, DER working in concert don’t require modification in avoided cost methodology itself. Enhancement is required in determining how aggregation/coordination of resource changes which costs are avoided and to what degree. DERs working in concert will perform differently than the same DERs without coordination (e.g. increased reliability/diversity). Fewer resources may be needed if working in concert DERs in concert may complement each other such that avoided costs are greater than the sum of their independent avoided costs LNBA WG should review assumptions on how DERs interact, including through DERMS, and the impacts on benefits/costs to ratepayers