Costs and benefits of fragmented financial management arrangements for donor-financed projects in the health sector Presented By: Maxwell Dapaah, Senior.

Slides:



Advertisements
Similar presentations
4 TH IHP+ COUNTRY TEAMS MEETING: Sustaining and Accelerating Change, Getting Results December 2012 Nairobi, Kenya.
Advertisements

1 John Rwangombwa Permanent Secretary and Secretary to Treasury Ministry of Finance and Economic Planning Republic of Rwanda 1 Challenges and opportunities.
KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
Session 9b: Next steps on financial management harmonization and alignment.
Guidance Note on Joint Programming
Harmonized Approach to Cash Transfers to National Implementing Partners.
1 Module 4: Partners demand and ownership Towards more effective Capacity Development.
SYDNEY MEDICAL SCHOOL AAAPS Conference | 9 April 2010 Joel Negin Sector wide approaches in health: Pacific experiences and lessons learned.
World Bank Financial Management Sector September 2010.
Review of different stakeholders needs in relation to Joint Assessment of National Strategies and Plans (JANS) Preliminary Findings IHP+ Country Teams.
What is "QuODA"? A methodology to measure donors' performance, developed by the Brookings Institution and the Center for Global Development – Expressed.
1 General Budget Support Presentation by the Ministry of Finance.
1 Collective Efficiencies Development Finance Architecture Workshop Prerna Banati - July
What has changed in 5 years ? Strengthening Accountability to Achieve the Health MDGs Nairobi, 12 th December 2012 Overview of progress in implementing.
LOCAL DEVELOPMENT PILOT PROJECT (LDP) The World Bank and Bosnia and Herzegovina.
Multilateral Mechanisms for Managing International Development Assistance. The Challenge of Effectiveness and Reform Yuriy Zaytsev National Research University.
AN INTRODUCTION Country Systems. Outline 1. What are Country Systems? 2. What does it mean to use country systems? 3. Why does the ‘use of country systems’
From Effective Aid to Effective Institutions Synthesis of Joint International Evaluations Julia Betts and Helen Wedgwood Paris 5 th October 2011.
Joint Financial Management Assessments Renaud Seligmann Practice Manager Governance, World Bank.
The Bank FM team is helping countries in the Africa region to increase reliance on their country FM systems for project implementation. Aware of the inconsistency.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
GOVERNANCE IN DISASTER RISK REDUCTION: Issues for CDM By Jeremy Collymore.
IHP+: introduction and ministerial review Action for Global Health Conference Strengthening Accountability to Achieve the Health MDGs Madrid, 7 th June.
WORLD BANK: SUPPORT FOR HEALTH SECTOR DEVELOPMENT PROGRAM 1.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
Module 4: Partners’ demand and ownership Supporting change through Capacity Development.
Budget Support in Situations of Fragility: Emerging Issues Nicola Pontara International Parliamentary Conference on State Building: Tackling State Fragility.
IEG Global Partnership Programs: Addressing the Challenge of Evaluation Christopher Gerrard Global Programs Coordinator, IEG-World Bank March 31, 2006.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
Embracing the Paris Principles and AAA to Curb Corruption and Enhance Development Performance Mitchell O’Brien Governance Specialist Team Lead – Parliament.
IHP+ Financial Management Technical Working Group One year after formation FMTWG (Nov 2015)
Session 8 Improving technical assistance in the health sector: current issues and opportunities 1.
BOSNIA AND HERZEGOVINA Ministry of Finance and Treasury Donor Coordination Forum Meeting The Report on progress on Adherence to the Principles of the Paris.
UPDATE ON GAVI ALLIANCE, THE GLOBAL FUND AND WORLD BANK COLLABORATIVE EFFORT FOR MORE EFFECTIVE HSS SEPTEMBER, 2009 Exploring a potential common platform.
Governance and Anticorruption Issues Public Financial Management.
MOH 2 February Identify needs Prioritize needs Finalize list of endorsed needs Submit needs to MOPAD Consult with donor Negotiation (intra- and.
Launched March at UN Statistical Commission in side event.
Harmonized Approach to Cash Transfers (HACT) to Implementing Partners
Progress on Aid Effectiveness: Monitoring the Global Partnership and the Moldova Partnership Principles Lucreția Ciurea, State Chancellery Jakob Schemel,
Technology and Corruption: The Case of FMIS
Assessing Sustainability in Global and Regional Partnership Programs
What has changed in 5 years ?
Sajitha Bashir The World Bank
Africa Region Accra High Level Forum Preparatory Consultation Workshop Summary of Group 3 Discussions on Harmonisation and Alignment April,
PROCUREMENT FIDUCIARY ARRANGEMENTS IN SECTOR-WIDE APPROACHES (SWAps)
Options for Sector Wide Approaches (SWAps)
Asha Ayoung Lead Procurement Specialist, OPCPR
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
OF ALBANIAN GOVERNMENT TRANSACTIONS ACCOUNTING
SWAPs: Based on Lessons Mainly from Morocco and Zambia
IHP+ First Steering Committee Meeting 15 January 2014
External Audit Core PFM Training Program Sanjay Vani
Business in Partnership Against Corruption
Joint session with IHP+ introduction
KEEPING A DEVELOPMENT FOCUS: THE CHALLENGES IN ENSURING POLICY COHERENCE FOR DEVELOPMENT: A UGANDA’S PERSPECTIVE Presented by: Pius Bigirimana, Permanent.
Financial Management Harmonization and Alignment
Financial Management Harmonization and Alignment: It’s All About Results ''Financial management in the health sector is a sacred responsibility because.
General Principles Align with country systems whenever they meet the minimum acceptable level. Harmonize among development partners, when all or part of.
Joint PBF / MPTF Office initiatives and Financial Update
Abebe Alebachew 12th December 2012 Nairobi, Kenya
Principles of Financial Management and Disbursement
Primary Health Care Improvement Global Stakeholder Meting, Geneva
The International Health Partnership: aligning for better results Marjolaine Nicod, IHP+/WHO Maxwell Dapaah, IHP+/WB.
Harmonized Approach to Cash Transfers (HACT) to Implementing Partners
Implementing Budget Reforms
Conceptual framework of the Aid on Budget Study CABRI
WITHIN THE INTERNATIONAL RECONSTRUCTION FUND FACILITY FOR IRAQ
PEFA Assessments - Analytics to Action
Assessing Sustainability in Global and Regional Partnership Programs
Africa Centers of Excellence (ACE II) Project Financial & Disbursement Management NAIROBI, May 13 14,2019.
Presentation transcript:

Costs and benefits of fragmented financial management arrangements for donor-financed projects in the health sector Presented By: Maxwell Dapaah, Senior Financial Management Specialist, World Bank Group

Why PFM in health ? An open and orderly PFM system enables desirable results in sectors, including health. Progress towards UHC requires reliance on government spending, and for some countries reliance on donor funding bringing PFM to the forefront: how budgets are formed and allocated to different ministries (including health), how these funds flow through different levels of administration, and how these budgets are implemented and/or how donor projects are implemented Reliance on country PFM system helps to minimize use of parallel arrangements for implementing donor projects. If reliance on country systems is not feasible harmonization among DPs will help minimize fragmentation and associated high transaction cost KEY FOR THIS WORK: how these budgets are implemented and/or how donor projects are implemented – key for countries that receive a significant amount of aid --- IHP+ partner countries HNP GP Management: [Presentation]/ [Notes], day/mo/year

Problem definition & aim of study Development partners have often advanced financial management risk as one of the main reasons for not using country systems or for not harmonizing. As part of a larger PFM in health study, a review was conducted to analyze data on specific FM cost items from four development partners to help determine the costs and benefits of fragmented donor FM arrangements in the health sector. The study aims to provide an evidence-based approach for determining the costs and benefits of parallel FM arrangements for donor-financed projects.

Aim of study and problem definition Parallel Arrangements cost items The study aims to provide an evidence-based approach for determining the costs and benefits of parallel FM arrangements for donor-financed projects Development partners have often advanced financial management risk as one of the main reasons for not using country systems or for not harmonizing. As a part of the larger PFM in health study, a review was conducted to analyze data on specific FM cost items from four development partners to help determine the costs and benefits of fragmented donor FM arrangements in the health sector.

Hypothesis Where a country has strong PFM systems, the incremental cost that results from reliance on country PFM systems will be less than the aggregate cost of each donor having separate FM arrangements Where a country has weak PFM systems, the aggregate cost of harmonized implementation arrangements among donors will be less than the cost of having separate FM arrangements

IHP+ principles on FM harmonization and alignment Methodology Country case studies Cost elements The incremental cost of use of country systems- if it is determined based on independently assessed fiduciary risk profile of the country and health sector FM arrangements that such systems could have been used for implementing the donor financed project; or The cost of harmonization among DPs - if it is determined in that country FM systems are weak and DPs will not rely on such systems but could collaborate to use common implementation arrangements that either partially rely on country systems, or are stand-alone. Compare either cost to the cost of parallel FM arrangements obtained from DPs per country Consolidate all the cost data from the three steps above IHP+ principles on FM harmonization and alignment

Counting the cost of Fragmentation Fund flow and reporting relationships are inherently complex in the health sector. But the addition of a plethora of FM arrangements for donor funding increases the complexity.

KENYA: Cost of parallel arrangements vs cost of harmonization The analysis proposes a hypothetical scenario that assumes the use of harmonized arrangements agreed upon by the development partners in cases where the risks in the financial management systems could not be mitigated in the short run, along with the use of country systems in cases where the residual risk is low. Hybrid arrangements would have costed US$5.5 million, compared to the total cost of US$28.8 million that the four DPs surveyed incurred over the study period. Hybrid arrangement cost is approximately 1 percent of the total disbursed by the four donors over the study period. Country systems used: FM staff FMIS – rollout to remaining counties Not used SAI Internal audit

Findings: Kenya Country case Cost of fragmentation involving 4 DPs Cost of harmonized FM arrangements Year Fiduci ary agent (FA) NGO PIU UN agency Total 2011 0.63 0.41 1.04 2012 0.52 3.01 0.36 3.89 2013 0.72 3.71 0.47 5.42 2014 0.22 7.44 0.56 0.09 8.31 2015 1.78 6.88 0.31 1.18 10.15 3.24 21.67 2.16 1.74 28.81   2011–15 Amount FM staff cost 2.0 Internal Audit staff cost 0.5 External Audit 0.6 Accounting Software 1.3 Administrative and overhead cost 0.4 Coordination cost 0.8 Total 5.50

Analysis Cost of parallel arrangements in the Sector, 2011–15 Analysis Financial management cost of using such parallel arrangements was US$28.8 million between 2011 and 2015 and beyond. This compares with a total disbursed amount of US$582.4 for project/program implementation the total cost of parallel arrangements was therefore 5 percent of the total amount disbursed over the study period majority of the cost of parallel implementation arrangements is associated with the use of NGOs (US$21.7 million), followed by the use of fiduciary agents (US$1.8 million),    This implies that over time, increases in donor contributions to the sector would result in an exponential increase in costs associated with FM arrangements if NGO’s systems continue to be used. This ceases to become sustainable as the administrative costs and inefficiencies associated with managing several different NGO’s to handle several donor projects becomes high.

Synthesis of cost for four DPs in 63 countries Cost of Parallel Implementation as Percentage of Total Disbursement by Development Partner and Year, 2011–15 Pattern of Cost of Parallel Implementation Arrangement (US$ millions), 2011–15  Period World Bank Global Fund GAVI KfW All agencies 2011 13.40 5.00 16.30 3.10 37.80 2012 19.60 9.50 44.20 5.10 78.30 2013 171.30 132.10 7.10 330.10 2014 17.30 196.80 79.00 10.00 303.10 2015 72.40 224.90 108.40 15.00 420.70 Total 142.30 607.50 380.00 40.30 1,170.00

SYNTHESIS: Cost breakdown by parallel arrangement Pattern of Cost of Parallel Implementation Arrangements by Cost Element Breakdown of Total Cost of Parallel Implementation Arrangements by Cost Element (in US$ millions)   Cost Driver 2011–15 Amount Percent UN Agencies 510.6 44 NGOs 258.7 22 PIU & Consultancy cost (FM, IA) 233 20 FM Technical Assistance (TA) 88.6 7 External Audit 54.2 5 Fiduciary Agent (FA) 23.8 2 Accounting Software 1 Total 1,170.00 100%

Findings: DP contributions to cost of parallel arrangements Development Partner Contributions to Each Cost Element (US$ millions) Development Partners’ Contributions to Total Cost of Parallel Implementation Arrangements

Findings: Cost pattern by regions and disbursement Pattern of All Development Partners’ Contributions to Total Cost of Parallel Implementation Arrangements by Region Total Cost and Disbursement of Parallel Implementation by Development Partner and Year, 2011–15 (in US$ millions) GAVI, World Bank, KfW & Global Fund 2011 2012 2013 2014 2015 Total Total FM-related cost of parallel implementation arrangements provided by participating DPs 37.8 78.3 330.1 303.1 127.5 7 876.8 Total disbursement of health project-type disbursement obtained from OECD Creditor Reporting system 2,226.0 2,753.4 3,675.4 3,155.7 2,153.9 13,964.4 Cost as percentage of disbursement 2% 3% 9% 10% 6%

Conclusions UN agencies (44 per cent) and NGOs (22 per cent) are the most common parallel arrangements used Continued reliance on parallel arrangements may have contributed to a ‘substitution effect’ Low spending on automation of accounting record-keeping and on external audit, when compared with the weaknesses in the control environment and of supreme audit institutions (SAIs) in the countries surveyed implies that project funds are at high risk of misuse Misuse might not be detected early, if at all, during implementation. the high spending on parallel arrangements may not necessarily be an adequate safeguard against fiduciary risks, so long as key aspects of the control environment fail to be consistently prioritized Although reliance on UN agencies and NGOs may be needed under certain circumstances (such as during emergencies and fragile situations), these findings show that in countries that meet neither of these criteria, continued reliance on parallel arrangements may have contributed to a ‘substitution effect,’ whereby DPs incur higher costs to establish or even strengthen parallel arrangements and expend less effort and costs to strengthen and use country systems because they consider them to be weak.