Berkeley status Aug 10th, 2012.

Slides:



Advertisements
Similar presentations
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Advertisements

UKDC2 Stavelet with Tandem Converters Peter W Phillips.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS Module building at Glasgow
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 Module and stave interconnect Rev. sept. 29/08.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Walls crates cables gas chambers electronics CERN adb.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Module and stave interconnect Rev. sept. 29/08.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Sergio Díez Cornell, Berkeley Lab (USA),
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
1 ABC130 Module Envelope Envelope set by 2 locations 1.Power end – biggest contribution coming from shield box 2.Data I/O end – set by wire bonding from.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
HV Connections for SP HV RETURN Dummy Pad Backplane Connection Do we need to connect the HV and HV return to the “left hand” hybrid? The HV trace serves.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Phase-II strips update S. Díez, 22 Mar S. Díez, Phase-II strips update Outline  Recent activities at Berkeley (What’s new since January)  US stavelet:
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
ATLAS pixel module assembly flow
TOTEM Electronics Status
Markus Friedl (HEPHY Vienna)
Hybrid Issues.
Gluing jigs for Demonstrator
Equipment for Assembly – UK Experiences
Module Production in Brussels
Updates on the Silicon Tracker 2S Module
Presentation transcript:

Berkeley status Aug 10th, 2012

US stavelet: status Already glued the first 2 modules of the DC-DC side of the US stavelet First electrical tests just performed last night M. Defferrard contributed to most of this work during the last 3 months, some of the next slides are his 12/17/2017

Stavelet core Aluminum shielded module for comparison Initial idea was to start with shielded module, but that would have many complications during the assembly (glue application, placing of converters,…) Decided to go from the EoS side to the other 12/17/2017

Mounting tools Pickup tool Stavelet frame Pick the Modules by vacuum on top of the ABCNs, leaving enough clearance for the wirebonds. Place them precisely on the Core : ~ 500 μm between the silicon sensors, pads for wire bonding. 12/17/2017

Module placement Linear bearings allow the pick-up tool to move vertically but not horizontally Module position controlled by the dowel pins. 12/17/2017

Gluing Silver epoxy : Electrically conductive HV contacts to sensor backplane Two contacts (as opposed to previous stavelets) Three layers of low tack (blue tape) mask for SE4445  Very similar to the one used at RAL Fishing lines : 125 μm diameter Height control Allow to remove the SE4445 (but probably not the silver epoxy...) 12/17/2017

Glue spreading 3 layers mask: 240 μm of glue Glue spreads, but not perfect (may need to change mask layout) 2 layers mask: 160 μm of glue no glue spreading 12/17/2017

First 2 modules glued 12/17/2017 8

US stavelet so far Pins + set screws for precision positioning of the core Carbon fiber shielding connection LV power supply soldered on DC-DC tape STAR connection to DC-DC converters 12/17/2017

Module 0 Horrible looking scratch on guard ring Sensor current goes > 100 uA at -5 V, also when cooled down Ohmic behavior 12/17/2017

How and when? Sensor was tested prior to be used for a module, and as an individual module Picture on slide 8 shows the scratch already (if you look carefully) That was taken right after the gluing on the core, meaning that this was not caused during the DC-DC converters placement, soldering of “star' connection, LV cable soldering, or final bonding stage Hard to believe the pickup process did something like that to the sensor The scratch looks like if it was made with metal tweezers My conclusion is that I did that to the sensor when removing the glue on the corners of the hybrid that attached the module to the individual test frame Only previous step that did not involve subsequent testing The module will probably be very difficult to remove due to the silver epoxy for the HV contacts We decided to leave it there and glue the second module (we can still disable it with the 1-wire control) 12/17/2017

Other HV: SCT HV supplies on a VME rack HV controller on Labview developed by M. Defferrard LV: Sorensen XPF60-20D (60 V, 20 A) dual output power supply (can power both the serial and the DC-DC side at the same time) Looks identical to CPX400DP from TTi So far controlled manually Cooling and shielding box around the stavelet frame HSIO borrowed from UK batch (thanks) Latest software and firmware versions installed and working (thanks Peter, Matt, Bruce!) USB-RJ11 1 wire interface and interface board Followed bonding schemes for DC-DC stavelet that Peter circulated last week (thanks Peter!) 12/17/2017

First tests First tests from yesterday evening: Module 0 (broken sensor, not biased) Hybrid 55 Hybrid 56 ~ 1100 e ~ 1100 e 12/17/2017

First tests First tests from yesterday evening: Module 1: Roughly 100e more than individual module (DC-DC powered) Very fresh results! (this is just the very first test of the stavelet from last night) Hybrid 57 Hybrid 58 ~ 710 e ~ 650 e