Aviation System Block Upgrades and NAV CANADA Planning

Slides:



Advertisements
Similar presentations
Second Global Symposium on TEM and NOSS in Air Traffic Control February 7, 2007 NOSS and the ATS Provider A Perspective from Senior Management Kathy Fox.
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Aviation System Block Upgrades and NAV CANADA Planning 17 November 2012 Pre-AN-Conf/12 Workshop.
ICAO PBN Symposium Regulatory and Certification Forum Safety case – procedure ready for publication? Jeff Cochrane, Manager CNS Service Design.
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
ICAO: Global Harmonization Plan
Information Management The ICAO Perspective
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Block 0 Overview Halidou Moussa Air Navigation Commissioner International Civil Aviation Organization.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
CPWG 16 NAV CANADA Update December 3-6,  Private, non-share capital company  2nd largest ANSP in the world  12 million aircraft movements annually.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Block 0 Overview Halidou Moussa Air Navigation Commissioner
NAV CANADA INSURANCE PRESENTATION
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Modernising the System
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Technology Roadmaps H. Sudarshan
Presented by United Arab Emirates
A brief on APIRG Eng. John Tusubira Kagoro
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Technology Roadmaps H. Sudarshan
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
Aviation Innovation for Regional Integration
ANConf/12 – Agenda H. Sudarshan
ASEAN PBN Routes Objectives:
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO PBN Symposium Regulatory and Certification Forum
Templ ref: PPT-ISO-colour.001 Doc Ref no:
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

Aviation System Block Upgrades and NAV CANADA Planning 17 November 2012 Pre-AN-Conf/12 Workshop

NAV CANADA overview Corporate Planning Relationships Vision, Mission, Overarching Objectives Business Plans Corporate Safety Plan Operations Plan ANS Plan The Air Navigation System Plan (Charting the Future) Mapping to Aviation System Block Upgrades Aligning initiatives to ASBU modules Generating initiatives in support of ASBU modules Ongoing planning

Who We Are Private, non-share capital company 2nd largest ANSP in the world 12 million aircraft movements annually 18 million square km of airspace Regulated by Federal Government on Safety Performance

People 4,800 employees across the country Air Traffic Controllers Flight Service Specialists Electronics Technologists Engineering and IM Corporate Functions

NAV CANADA Services Air Traffic Control Flight Information Weather Briefings Aeronautical Information Airport Advisory Services Electronic Navigation Aids

Mission Statement NAV CANADA facilitates the safe movement of aircraft, efficiently and cost effectively, through the provision of air navigation services on a long-term, sustainable basis.

Planning Relationships

CHARTING THE FUTURE The Air Naviagation System Plan Describes NAV CANADA’s projected plans for future Air Navigation System development Initiatives are aimed at meeting customers' requirements Provides an outlook to generate stakeholder consultations with the goal of choosing the most beneficial path to the ANS of the future

ANS Plan Structure Performance Based Navigation (PBN) Communications Surveillance Air Traffic Management (ATM) Aeronautical Information Management (AIM) Aviation Weather

Operational Requirements and ASBU Threads 65 - Optimized approach procedures 70 – Optimized wake vortex separation 75 – Safety and efficiency of surface operations 80 – Airport CDM 15 – AMAN/DMAN PBN Communications Surveillance ATM AIM Aviation Weather 25 – Ground-Ground Integration 30 – Digital AIM 105 – Meteorological Information 10 – Enhanced enroute trajectories 35 – Network-wide view 84 – Ground Surveillance 85 – ATSA 86 – Climb/Descent using ADS-B 102 – Ground-Based Safety Nets 05 – CDOs 40 – Data Link Enroute 20 – CCOs

Operational Requirements and ASBU Threads 65 - Optimized approach procedures 70 – Optimized wake vortex separation 75 – Safety and efficiency of surface operations 80 – Airport CDM 15 – AMAN/DMAN PBN Communications Surveillance ATM AIM Aviation Weather 25 – Ground-Ground Integration 30 – Digital AIM 105 – Meteorological Information 10 – Enhanced enroute trajectories 35 – Network-wide view 84 – Ground Surveillance 85 – ATSA 86 – Climb/Descent using ADS-B 102 – Ground-Based Safety Nets 05 – CDOs 40 – Data Link Enroute 20 – CCOs

Operational Requirements and ASBU Threads 65 - Optimized approach procedures 70 – Optimized wake vortex separation 75 – Safety and efficiency of surface operations 80 – Airport CDM 15 – AMAN/DMAN PBN Communications Surveillance ATM AIM Aviation Weather 25 – Ground-Ground Integration 30 – Digital AIM 105 – Meteorological Information 10 – Enhanced enroute trajectories 35 – Network-wide view 84 – Ground Surveillance 85 – ATSA 86 – Climb/Descent using ADS-B 102 – Ground-Based Safety Nets 05 – CDOs 40 – Data Link Enroute 20 – CCOs

Surveillance Timeframe

Surveillance Timeframe

Surveillance Timeframe

ICAO Aviation System Block Upgrade Summary Table

Communications Timeframe

Communications Timeframe

Generating future initiatives in support of ASBU modules The planning process needs to engage the Global Air Navigation Capacity and Efficiency Plan (Doc 9750)

Planning Relationships

Planning Relationships Global Plan

Discussion