Probabilistic Transmission Planning - ERCOT

Slides:



Advertisements
Similar presentations
Goshen Area Bus Reconfiguration
Advertisements

Framework for comparing power system reliability criteria Evelyn Heylen Prof. Geert Deconinck Prof. Dirk Van Hertem Durham Risk and Reliability modelling.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
Integrated Reliability Measures Heide Caswell, Team Lead, Reliability Metrics Working Group (RMWG) Director of Network Performance, PacifiCorp Compliance.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Nodal Planning Go Live Austin, TX February 3, 2011
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Minnesota Renewable Energy Integration and Transmission
Transmission Planning in ERCOT- Overview
Wind Management at MISO
Phase Angle Limitations
ECEN 460 Power System Operation and Control
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
1 The roles of actuaries & general operating environment
Overview of New Control Room Desk
Modifications to Planning Charter
Risk Assessment and Probabilistic Transmission Planning Methods
Grid Integration of Intermittent Resources
ISO New England System R&D Needs
Project WECC-0100 Update Load Modeling Task Force
Transmission Planning in a Modern Market Environment
Benchmarking Quasi-Steady State Cascading Outage Analysis Methodologies IEEE Working Group on Understanding, Prediction, Mitigation and Restoration of.
Software Project Management (SPM)
Reliability Assessment Committee Reliability Workshop Priorities
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Jonathan young ColumbiaGrid
Risk Adjusted Project Schedules
Security assessment: decision support tools for power system operators
EE362G Smart Grids: Architecture
Reliability Assessment Committee Reliability Workshop Priorities
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
Planning Reserve Margin
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
NERC Congestion Management
Statistical Analysis of Power System Faults
Assigned to the WEQ OASIS and BPS Subcommittees
Presentation transcript:

Probabilistic Transmission Planning - ERCOT (November 16, PLWG)

Contents Introduction Deterministic Vs Probabilistic Applications Efforts and Issues Next Steps & Summary Appendices

Introduction Motivation Increasing uncertainties (intermittent generation, distribution, weather pattern) are expected in ERCOT system NERC reliability standard requires to test a large number of contingencies and identify contingencies with severe impact ERCOT and others within the industry are currently researching probabilistic transmission planning methods and tools. It is believed that deterministic planning processes can be enhanced by supplementing with a probabilistic planning approach The probabilistic planning concept is not new but not popular mainly because of the deterministic nature of planning standards, lack of tools, and lack of data

Deterministic vs Probabilistic Transmission Planning Deterministic Approach Reliability Analysis is done assuming each contingency is certain System issues (thermal loading, voltage, etc.) Several cases for certain operating conditions (e.g. summer peak and off peak) based on engineering judgement Probabilistic Approach Risk Assessment (Risk = Impact x probability of events and scenario) (e.g. Expected Unserved Energy) Reliability Analysis is done for each contingency that has outage statistics (frequency and duration). System issues (thermal, voltage, etc.) as well as Impact (e.g. load curtailment) A large number of cases covering a wide spectrum of operating conditions by considering uncertainties of weather, intermittent generation, load forecast, economic, distribution side. Probability is assigned to each case Drawbacks of Deterministic Approach does not cover various system conditions nor consider many uncertainties in a system ignores likelihood of system conditions and the probability of events

Example: Magnitude of Risk Associated with Critical Event

Applications Development of a number of credible study cases with many uncertainties considered Identification of critical planning or extreme events using likelihood, system impact or magnitude of risk associated with each event Evaluation of project alternatives in terms of benefit (e.g. test deeper contingencies such as substation outage: compute expected unserved energy (EUE) or incremental reliability index (IRI) to compare reliability benefit of each option Identification of weak areas based on the number of interruption of load at each bus, number of occurrence of thermal or voltage issues on line or bus Measure the health of real-time system (e.g. by computing EUE periodically)

ERCOT’s Efforts ERCOT started to participate in the EPRI Risk-based Transmission Planning Program Mid 2014~1st qtr. 2015 Goal: Develop basic concept, risk-based analysis method, metrics, data requirement guideline, new tools and improving existing tool for probabilistic planning Value: 1) Increase system reliability by considering deeper contingencies, 2) Incorporate some of the uncertainties, 3) Help us make a better decision on transmission investment Deliverables: 1) Technical document of the RBTP, 2) Prototype of tools (e.g. TransCARE, Outage statistic creation, Risk-based Scenario Builder) EPRI’s ERCOT Case Study 1st qtr. 2015~1st qtr. 2016 EPRI performed a case study using the data ERCOT provided: 11 years of weather, historical wind and load data, and economic load forecast error to create a number of system conditions Transmission network models, contingency definitions Outage statistics from NERC TADS and GADS Deliverables: 1) Technical document of the case study, 2) Improved version of the tools (TransCARE, Risk-based Scenario Builder), 3) Cases and input data used for ERCOT Case study ERCOT’s Review on EPRI’s Case Study and Tools 1st qtr. 2016~present Using the cases and input data, ERCOT performed the analysis using the tools Identified many issues in tools and areas to improve, documented the problems and created user-guide Delivered the issues to EPRI so the tools can be fixed and improved For the proof of concept, ERCOT tested three transmission options using cases representing various system condition and extreme events such as substation outages and common right or way. The result has been delivered

Framework of Probabilistic Risk Assessment Case Development Tool: EPRI’s Risk-based Scenario Builder Input: historical data (11 year weather, renewable, load), 5 different load forecast errors, network model (RTP case), outage statistics (optional) Output: cases in PTI format, probability of each case, deeper contingencies (optional) Key issues to be resolved: How many cases need to be drawn to minimize the chances of missing critical operating conditions? Are those cases valid? Reliability Analysis Tool: EPRI’s TransCARE or PSS/E, Outage Statistics Creation Tool Input: cases, contingencies, user-defined contingencies, outage statistics of each element (e.g. NERC TADS or GADS data) Output: criteria violations, system impact (e.g. load curtailment), outage statistics of each event Sensitive to slight change in operating condition resulting in Inconsistent result of system impact, numerous non-converged contingencies and tools not capable of calculating load curtailment for voltage collapse Risk Assessment Tool: EPRI TransCARE or PSS/E Input: system impact (MW curtailment) associated with each contingency, probability of each critical contingency Output: risk metrics (e.g. EUE or IRI) Data is the key to this probabilistic analysis. Outage statistics are needed for various contingency types (P1~P7) and extreme event

TransCARE (Transmission Contingency And Reliability Evaluation) TransCARE, an improved version of an older EPRI program known as Transmission Reliability Evaluation for Large-Scale System (TRELSS), is designed for probabilistic reliability analysis Power Flow Cases Input data including outage statistics Probabilistic Reliability Assessment (TransCARE) Reliability Indices

TransCARE (cont.) Reliability indices calculated: Input files to TransCARE: Power flow case: *.sav in PSSE version 32, or GE PSLF. Up to 10 cases Contingency: up to N-9 can be handled. Up to 1 million contingencies Outage Statistics: outage frequency and duration of each element Other optional files: Common mode outage data, breaker location data, generation dispatch data and load data Reliability Analysis and Remedial Actions: Available solution methods: DC and AC Full NR Reliability analysis: Circuit loading, high/low bus voltage, voltage deviation, etc. Remedial actions: Load curtailment, generation/shunt/transformer adjustments Protection Control Group (PCG) Analysis: simultaneously trip elements when a fault occurs anywhere within their primary protection zone. Reliability indices calculated: Frequency, Duration, and Severity of system problems (by bus, circuit, and for study area) Frequency, Duration and Severity of load curtailment as well as unserved energy (by bus and for study area as well as by contingency)

Key Issues To Be Resolved Tools are research-grade. Significant improvement needed for tools Tools should be capable of computing system impact (e.g. MW load curtailment) to eliminate non-convergence (e.g. voltage collapse) in terms of MW load curtailment Results (e.g. MW load curtailment) need to be verified. TransCARE is very sensitive even for a slight change in a system Cases developed from RBSB tool needs to be verified. The number of cases to draw and study should be researched and determined Even if cases and tools are perfect, it may take longer time depending on the scope of study (e.g. a number of study cases, number of contingency combinations)

Key Issues To Be Resolved (cont.) Availability of outage statistics Probabilistic data requires outage data of transmission elements and generators Nation-wide generic data: NERC GADS (generator outage data for decades), TADS (transmission with 200 kV above since 2008), Canadian Electricity Association (CEA, greater than 60 kV since 1980) Best practice is using ERCOT region-specific data (by weather zone, by event type (P1~P7, EE), by voltage level). These are currently not available Criteria is not available (e.g. threshold associated with system impact, probability of event, magnitude of risk) that triggers action

Next Steps Tentative Schedule Description Present ~ 2018 Beyond 2018 Continue to engage in EPRI’s R&D project Collect historical outage data for ERCOT system (e.g. voltage level, automatic vs non-automatic, cause, fault type, time/load level, weather zones), and investigate statistics such as P4, P5, P7, EE2 Analyze outage data collected and review against other statistics (e.g. NERC TADS, GADS or EPRI data) Attempt to address the challenges identified and continue to work with EPRI to address issues with tools and more (e.g. cases, tools, statistics, criteria, metrics) Test potential applications (ranking contingencies, risk metrics) Beyond 2018 Continue to work with others in industry on the success of this concept Continue to work on gathering historical outage data Engage in EPRI program if exists Consider risk metric(s) in decision-making (e.g. Evaluation of multiple options in ERCOT independent review)

Summary Probabilistic transmission planning approach is great idea and can be supplemental to the traditional deterministic planning process A number of issues with tools, data and criteria need to be addressed ERCOT will continue to work with others in industry and research institutes To investigate probabilistic transmission planning approach To address challenges and ultimately to apply this approach to the current planning process

Appendix: Example - Probability of occurrence for load and wind output based on historical data

Appendix: Expected Unserved Energy or Incremental Reliability Index Expected Unserved Energy (EUE) * Note: EUE can be calculated for all cases tested and probability of each case need to be multiplied) Incremental Reliability Index (IRI) = reliability improvement per million dollar EUE before project - EUE after project Capital cost of project ($M)

Appendix: Issues and Suggested Improvements EPRI Scenario Creation Tool (RBPSB) 1. Generators dispatch to include reserve not losses 2.Does not randomly sample scenarios 3.Does not have enough information to map output back to input data 4.Does not solve and validate re-dispatched power flow scenarios 5.Output does not include probability of scenarios and strata 6. Unclear documentation on sampling scenarios based on distribution within strata RBPSB >> TransCARE 1.Several adjustments (defining new zones, change of swing bus, etc.) on re-dispatched power flow scenarios need to be made to be able to run in TransCARE (Manual Process) 2. TransCARE ‘s capability of handling up to 10 scenarios once might not be sufficient to implement the idea of stratified sampling. API tools are needed such that TransCARE can be run as an engine in scripts TransCARE 1. Questionable remedial actions 2. Post contingency power flow solving issues(diverge, large mismatch) 3. Does not recognize unrealistic contingencies (a filter function is needed) 4. Does not keep a track of skipped must-run contingencies 5. Enumeration does not work properly 6. Report data format needs to be improved 7. Better documentation on EUE calculation methodology is needed

ERCOT Probabilistic Planning Team Supervisor, Transmission Planning Engineer, Resource Adequacy ERCOT Probabilistic Planning Team Supervisor, Engineer Development Program Principal, Grid Integration Engineer, Transmission Planning Lead Engineer, Resource Adequacy