Fire Safety update Mike Kay, CEO &

Slides:



Advertisements
Similar presentations
North Carolina Office of the State Auditor Honesty Integrity Professionalism.
Advertisements

Emergency Preparedness and Response
Part of the BRE Trust Protecting People, Property and the Planet What have fire doors ever done for us? Ian Stewart Certification scheme manager June 2014.
London Warm Zone A Case Study Jim O’Sullivan Director London Warm Zone.
Audit Commission Hertfordshire Housing Conference Housing Inspectorate Developments in inspection and assessment Roy Irwin Chief Inspector of Housing.
Electrical Safety Roundtable Charlotte Lee, External Affairs Manager NAPIT and founding participant, Electrical Safety Roundtable.
AGENDA Training Fire Marshals to Evacuate People with Disabilities by DAVE THOMPSON FIRE COMPLIANCE & SAFETY NI LTD.
Michipicoten Settlement Trust Trustee Investing September 21, 2012 Heather Richardson, Executive Trust Officer.
Key Findings and Implications for the Future from the Stock Condition Survey undertaken by Savills Presented by Winston Williams January 2008.
Fire evacuation information. Procedure on finding a Fire Sound the Fire Alarm by activating the Fire Alarm system Evacuate the building and proceed to.
AN INTRODUCTION TO THE FIRE SAFETY ORDER PHIL THOMPSON MIFireE FIRE SAFETY ADVISOR UNIVERSITY OF BRIGHTON.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
A Guide to Fire Alarm Service and Maintenance Requirements.
1 Fire Service Professionals. 2 Overview n Industrial Fire Systems n Innovations n Hazardous Areas n Changes to regulations n System integration n Future.
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working Vale of Glamorgan Council Final Report- July 2008.
CORGI Services Limited December Peterborough Trevor Batt Technical Safety Manager.
Regulatory Roundup: 2014 Examination Priorities Presented by: Erika Subieta, J.D extension 216 National Compliance.
Registration no: Fire Engineering Design Consultants – treating your fire safety concerns Designing residential fire safety & the challenging area.
PROTECTING PEOPLE, PROPERTY AND THE ENVIRONMENT High Rise Retrofit Pilot Project – Callow Mount, Sheffield LGA Environment and Housing Board - 16 May 2012.
The Role & Purpose of the Customer Senate Jerry Coulton - Senator.
Delivering Private Rented Services in Edinburgh. 2 The Role of the Private Rented Sector Providing privately let homes provides a vital resource to meet.
The Regulatory Reform (Fire Safety) Order 2005 Fire Risk Assessments Part 2 Conducting a Fire Risk Assessment.
Fire Procedures A Practitioners Guide Produced by: Caroline Morgan Morgan Consultants 12 th July 2005.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
Joint Meeting of the Parish Councils Embleton Craster Newton by the Sea 6th October 2014.
Promoting Quality in Fire Safety Presentation by:.
Asset Management Major Works POST DECENT HOMES 31/10/12 John Tunney, Asset Management Consultant REGENERATION & HOUSING.
LFB/NHS Fire Safety Concordat Seminar 30 th September 2015.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
Communities Fire Safety Report following consultation with Housing Providers 25 th January 2010.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
Housing Workstream National Prevention Committee.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
South Tyneside Homes The Decent Homes Programme January 2007.
Private Rented Property Licensing Headlines – 28 June 2016.
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Fire Risk Assessment Judith Evans BEng(HONS) CMIOSH
2015/16- AGM.
Code of Practice for Fire Safety in New and Existing Community Dwelling Houses Eamon O’ Boyle.
SAFETY | TRAINING | CONSULTANCY| STAFFING SOLUTIONS
Andy Cloke Station Manager Technical Fire Safety Central support
THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005
Embedding the golden threads that lead to quality care every time……
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Safety and Prevention of Typical Fire Plan
Presentation to AON July 2017
Jason Bolton Compliance Officer
Fire Risk Assessment in Community Halls and Licensed Premises
T/A About Us Energy Efficiency Improvements for Homes and Businesses
The Responsible Person
Background Solihull Community Housing (SCH) delivers the housing management, homelessness and housing advice service on behalf of the Council Demand for.
Fire Extinguishers need timely service ! By: EnergyandFire
Life Saving Rules-Do it Right!
Strawman Best Practice IIA Change Forum June 2017
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION.
Working from Height over 3m Approved Contractor
Meeting Quality Standards when working in collaboration
When is a stay put policy acceptable
Interactive Source: Fire Statistics Great Britain,
LEGAL REQUIREMENTS FOR ACT 13 OF 2006
Scrutiny and Empowerment Partners Limited
Management and supervision of men convicted of sexual offences
Scrutiny. Net at WVHT, 4th July 2018 Yvonne Davies
FIRE UPGRADES OF EXISTING BUILDINGS
Engage_presentation_2012
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
Fire Statistics England
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Fire Safety update Mike Kay, CEO & Michael Lyons, Interim Compliance Manager 4th July 2017

CURRENT POSITION NPH Liaison and agreement with NFRS (Northampton Fire and Rescue Service) and NBC NFRS do 3 things: 1. Enforcement Inspections 2. Building Information for Fire Fighting 3. Home Fire Safety Checks NFRS Objective is PREVENTION They do not issue fire certificates, approve installations, give instructions etc

CURRENT POSITION Headlines NPH work to and comply with The Regulatory Reform (Fire Safety) Order 2005 “Responsible Person” – NPH “Suitable and sufficient Risk Assessment” Includes adequate fire safety arrangements including evacuation strategies “Stay Put” Strategy NFRS evacuate if required Effective compartmentation and suitably protected means of escape Sprinklers are not recommended “Zero Tolerance” approach to fire escape routes

Fire Safety update Michael Lyons Interim Compliance Manager

Overview on NPH Fire arrangements Following the tragic incident at Grenfell Tower in London, NPH has carried out extra safety checks in all the blocks that we manage on behalf of NBC. We have focused on a portfolio of blocks that are 18 metres and above, a rule used by the government and fire service. The events at Grenfell Tower have raised questions from the public about how social landlords and their managing agents ensure the safety of their tenants and the blocks they live in. This presentation offers an overview on fire safety within the properties managed by NPH including: Cladding and External Wall Insulation (EWI) The stay put arrangement Current fire safety arrangements Activities since the London fire

Cladding & EWI Speculation has raised questions over the use of External Cladding and EWI – in particular (ACM’s) Aluminium Composite Material. In regards to NBC blocks: Cladding on St Katherines Court is a different material to the one used on Grenfell Tower. It is a layered composite zero fire rated material. This rating is awarded to the highest fire retardant building materials such as concrete, steel and brick. The insulation used on St Katherines Court is a mineral wool, which is also fire retardant and does not support combustion. The methods of installation used on St Katherines Court, and on all NBC properties where EWI has been installed have additional fire breaks built into the design. These fire breaks offer additional compartmentalisation vertically and horizontally. EWI is a method used to provide thermal insulation to the outside of a building. The fire protection element of EWI comes from the stringent instillation methods used, and the addition of layers of silicon and then an external render that are placed over the insulation material.

The Stay Put Arrangement The stay put arrangement is a nationally recognised approach used by social and private landlords to manage the safety of residents in blocks. NPH would only review its approach to the stay put arrangements if it was advised to do so by Fire Services nationally. Over the past 2 years NPH has invested significantly into fire safety, as well as working closely with partners to ensure the highest levels of fire safety for NBC tenants.

The Stay Put Arrangement The following arrangements are in place and contribute to NPH offering assurance on fire to its tenants, board and NBC: Over 4,000 fire doors replaced All 670 properties requiring an Fire Risk Assessment (FRA) have a full and valid FRA NPH has a dedicated in-house Fire Safety Officer All works stemming from an FRA are managed by the Fire safety Officer Fire safety is a priority on all Planned Investment and regeneration works undertaken by the Asset team The estate teams and housing officers undertake regular inspections on all sites regularly The fire service have attended multiple blocks over the past 2 weeks and are satisfied with the stay put arrangement employed by NPH

Current fire safety arrangements on tower blocks NPH manages circa 11,700 properties on behalf of Northampton Borough Council. The portfolio includes 670 locations that require an FRA, of those 670 only 11 are above 5 storeys, and only one block (St Katherines Court) could be categorised as approaching high-rise. All blocks are fully compliant

Current fire safety arrangements Under the Regulatory Reform Fire Safety Order (2005), NPH is fully compliant and has completed its duty to carry out FRA’s on all locations where they are required. These FRAs are programmed in on a rolling basis, and ensures all locations are assessed on a frequency relative to the risk associated with a block. The current inspection regime and compliance data is outlined below: NPH has reviewed all high risk FRA’s and revised FRA’s are now in place on all these assets. Risk rating Risk Criteria Number of blocks FRA schedule FRA compliance High Risk 5 storeys or higher 11 Blocks Annual 100% Sheltered Blocks 1 Block Eleonore House Community Hubs 18 Medium Under 5 floors with 20 + flats 15 Blocks Blocks with 7-12 flats 524 Blocks 2 years Low Risk Blocks with 1-6 flats 101 Blocks 3 years

Activities since the London fire Since Grenfell Tower, NPH has carried out additional validation works on all blocks. Initially these activities focused on the 11 blocks managed by NPH that are above 5 storeys. The scope of this project expanded to include input and requirements from external partners including the Fire Service, central government (DCLG and HCA) and local government.

Activities since the London fire The previously mentioned revision of all high risk FRA’s was instructed commencing with the 11 high risk blocks All fire alarms and detection systems were tested All emergency lighting has been re-tested in all 11 high risk blocks An external review of cladding from St Katherines Court was instructed An external review of the NPH FRA programme has been agreed and is being instructed w/e 14th July when a contractor is agreed NPH’s fire officer has conducted 6 joint visits on NBC blocks, and a further 9 others are planned The Department for Communities and Local Government (DCLG) request information sheets were completed for all blocks above 6 stories A Fire Safety update was provided to NBC for the full Council meeting on Monday 19th June A report was delivered to NPH’s Audit & Risk Committee on 27th June, the committee noted they received assurance from the report

Thanks you for your attention Any Questions?