Build Smart for a Future Ready Singapore

Slides:



Advertisements
Similar presentations
PRESENTATION ON TURNKEY CONSTRUCTION.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
CDIO Approach for Real-Time Experiential Learning of Large Structures By Dr Tao Nengfu, Yoong Yuen Soo, Tan Poh Seng School of Architecture and the Built.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Wayne Howatt 01. Welcome The Climate Challenge Director, Dearle & Henderson for Scottish FHE Institutions.
INSTRUCTIONS The Southeast Region Architectural Exhibit submittal package will be placed on this template. All projects must have been completed and occupied.
EMPA Forum 2015 Workshop 3 - Endeavour BIM (Building Information Modelling) (2nd Lesson) & Using Augmented Reality February 2015.
Building Information Modeling By Jacqueline Greiner.
Towering with ArchiCAD Presented By: Hesham Mohamed Hassan El-Shahawy By: Elizabeth Bollinger Web Address:
Introduction to BIM BIM Curriculum 01.
CDECA ™ 2014 Decorating and Design Competition © CDECA ™ 2013.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
2014 AIA San Diego Design Awards Submission Instructions Slide PowerPoint Template for the Foundation Categories Each project entry must submit a separate.
INSERT IMAGE TO ILLUSTRATE THE PROJECT OVERVIEW Project Description: Include a short narrative to explain the background to the project including any information.
Project Name: Fill in Here. Project Location: Fill in Here. Architect(s): (names and addresses) Fill in Here. Masonry Contractor: Fill in Here. Owner of.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Overview of Building Information Modeling What does it mean for Civil Engineering?
RESIDENTIAL: ________________________________________________________________________________ Category: Please select the category that best describes.
Energy Performance for an Office Building: Wind Analysis
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Module Code : AURH453 Management Principles Assessment Number 1 (a) Nature of Industry In the form of an illustrated written report Weighting : (part)
Development and Implementation of Automated Code Compliance Checking Dave Conover December 12, 2007.
Roles for xxx Team Developer Sample Text Singapore Organisation Pte Ltd M&E Consultant Sample Text Singapore Organisation Pte Ltd International BIM Competition.
SEC 410 Help Bcome Exceptional / sec410.com
advices for advancing the productivity of the construction industry:
Chapter 12 Building Information Modeling. Chapter 12 Building Information Modeling.
OCTOBER 2016 International BIM Competition 2017
Devin Rauss Building California’s Flexible Grid October 27, 2018
Citizen Driven IoT Innovation for Disaster Relief
Unit 2 Technology Systems
Headings – Arial Rounded MT Bold – min font size 16
Design Quality (30%) - 6slides
BIM EXECUTION PLANNING PROCESS
Design V Prof. Jill Bouratoglou
Headings – Arial Rounded MT Bold – min font size 16
Design Quality (30%) - 6slides Explain your key concept? (2slides)
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
KEYNOTE STAGE SPONSOR.
(Building Information Modelling
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
 BIM Training across the AEC industry is continuing apace. Students and professional need to acquire skill- based training and knowledge to meet the.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
BIM EXECUTION PLANNING PROCESS
OCTOBER 2016 International BIM Competition 2017
Design Quality (30%) - 6slides
Multi-storeyed Car Parking-cum- Commercial Complex at Nehru Place, New Delhi PROJECT DETAILS : This multistoreyed car parking and centrally airconditioned.
Computer-Integrated Design and Manufacture of Façades
Excellence w/ e-Builder PMIS Why, What, When, How?
The European Union’s programme for India
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Adoption of Building Information Modeling Top Benefits of BIM data for Facilities Managers.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
Natural Gas Innovation Fund Investment Intake Template Project Title Submitted By *Note: This template is intended as a guide on content; you may.
DBIA Manual of Practice
Basic Design Documentation
Project delivery RIBA stages Define design deliver Key Objectives 1 2
BIM for Design Collaboration
CIC BIM Competition Presentation Template & Content Guide
Team Name and Affiliation
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
ESS.VIP.SERV Shared Services
Construction Management Services April 16, 2018
Natural Gas Innovation Fund Investment Intake Template
Digital Construction Engineering in Class – A collaborative approach
RIBA Plan Tom Robinson sir david Swindells Vii
Redevelopment of Jama Masjid Precinct
Presentation transcript:

Build Smart for a Future Ready Singapore 24 - 26 OCTOBER 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore 7 About the Project Project Description Proposed xxx development comprising 6 block of 14 storey residential building (Total 1079 Units), 1 block of Multi-storey Car Park with commercial / Community Facilities, Precinct Pavilion, ESS & Neighborhood Park at Yishun Avenue 6 / Yishun street 42 Site Area 20,000,000 sqm Gross Floor Area 80,000,000 sqm Gross Plot Ratio 4.0 Est. Project Costs $ 100,000.00 Contract Period Aug 2015 – Sep 2018 Status Under Construction / Completion Description The concept: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample The construction approach: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM adoption: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM Challenges:: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM Solutions: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample. What (Basic information & Key Features) Strategies (Design to Tender) Design Communication and Collaboration Cost Estimation Design Documentation and Production Computational Design Environmental Simulations Note: Please elaborate briefly about the project, and the BIM approach, challenges, solutions and benefits at different stages in point form. Please replace the sample text with actual information and delete this note. Font size at 14, calibri Note: For completed projects, please provide an image of the actual build. For projects under construction, please provide the final rendering and delete this note Please replace with infographics/images that describes the BIM applicable for collaboration and communication , ICE (Integrated Concurrent Engineering), Virtual Visits or BIM work flow and delete this text Please replace with infographics/images that describes the BIM applicable for design purposes and delete this text Please replace with infographics/images that describes the BIM applicable for costing purposes with shop drawings or details linked with relevant costing processes to show accuracy and consistent information flow across project team members and delete this text Process Management Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Design Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Cost Monitoring Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics/images that describes the BIM applicable for submissions, tender documentation, construction details or other relevant materials and delete this text Please replace with infographics/images that describes the computational BIM with Grasshopper/Dynamo/ Scripting or other parametric and coding approach and delete this text Please replace with infographics/images that describes the BIM applicable for climate studies/ solar shading/ ventilation or other environmental sustainability simulations and delete this text Documentation Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Computational Design Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Environmental Simulation Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Project Name Developer Sample Text Singapore Organisation Pte Ltd M&E Consultant Specialist Architect BIM Consultant Sample Text Singapore Organisation Pte Lt Design Consultant Builder C&S Consultant Specialists

Build Smart for a Future Ready Singapore 24 - 26 OCTOBER 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore 7 Output and Outcome Savings Quantification and Productivity Gain Challenges, Solutions and Benefits Strategies (Construction to FM) Site Planning and Monitoring Prefabrication Site Coordination Augmented Reality Facility Management Please replace with infographics/images that describes the BIM applicable for Integrated Collaboration approach or other features and delete this text Please replace with infographics/images that describes the BIM applicable for Virtual Visits and ICE sessions or other features and delete this text Virtual Visits with Integrated Concurrent Engineering Sample explanation text BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Integrated Model for Upfront Collaboration Sample explanation text BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics/images that describes the BIM applicable for construction site planning (tower crane radius studies, ingress/egress, contour studies for site office with BIM model or other features and delete this text Please replace with infographics/images that describes the BIM applicable for modular approach with Design for Manufacture and Assembly (DfMA) or other features and delete this text Please replace item with or other innovative BIM application if prefabrication is not applicable Please replace with infographics/images that describes the BIM applicable for RFIs or discrepancies, site coordination, virtual visits or other relevant features and delete this text Site Planning and Monitoring Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Prefabrication Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Site Coordination Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics or images that describes the BIM applicable with the use of augmented reality for various purposes and delete this text Please replace item with RFID (Radio Frequency Identification Device) or other innovative BIM application if AR is not applicable Please replace with infographics or images that describes the for Facility Management and delete this text Please replace item with BIM with Robotics approach for self-installation or other innovative BIM application if FM is not applicable Please replace with infographics / graphs or charts that describes the productivity gain with time, cost, resources improvement and delete this text Augmented Reality and RFID Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample As-built and Facility Management Sample explanation text BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Savings Quantification and Productivity Gain Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Project Name Developer Sample Text Singapore Organisation Pte Ltd M&E Consultant Specialist Architect BIM Consultant Sample Text Singapore Organisation Pte Lt Design Consultant Builder C&S Consultant Specialists