ATF status and plans for 2017

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
What’s been Achieved and What’s to be Done K. Yokoya ILC Annual Meeting 2012/12/20 ILC Annual, Yokoya1.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Prospects of the ATF operation in FY2016 N. Terunuma, KEK 19 th ATF TB/SGC meeting Jan , LAL Orsay.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
R&D for Fundamental Power Coupler in SRF Mass-Production
ILC Accelerator Activities in Japan
Introduction and Meeting Objectives
ILC + CLIC status Personal assessment
LCC L. Evans, Santander, 2nd June 2016
ILC Accelerator Update
Lyn Evans CERN/Imperial College SLAC 29th June 2017
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Activities of Cavity Fabrication Facility at KEK
Chris Adolphsen Sergei Nagaitsev
ILC Status in Japan LCWS2016, Morioka M.Yamauchi KEK December 5, 2016
Superconducting Cavities: Development/Production
A. Yamamoto, S. Michizono, and B. List
Status Update for NRI Commissioned Survey
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
High Gradient Cavities: Cost and Operational Considerations
Status of ATF/ATF2 and machine schedule in this fall
ILC Global Design Effort
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
CEPC RF Power Sources System
HIE-LINAC status report
Electron Source Configuration
IHEP Cryomodule Status
Nick Walker (DESY) EU GDE Meeting Oxford
Yasuhiro Okada, Executive Director, KEK
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
ILC Cryogenics -- Technical Design Report Planning
ATF project meeting, Feb KEK, Junji Urakawa Contents :
J. Seeman Assistant Director for PPA/LCLS
Barry Barish Paris ICHEP 24-July-10
Daresbury ESS In-Kind Contributions
Presentation transcript:

ATF status and plans for 2017 Nobuhiro Terunuma, KEK 19th ATF2 project meeting/TB meeting March 15th 2017, CERN

Changes on the ATF/ATF2 operation Significant amount of US contributions on ATF/ATF2 program FNAL DR bpm readout system; from front-end to DAQ SLAC manpower; Glen White, Douglas McCormic,... Flight simulator with multi-OTR; emittance measurement, Dispersion Correction BPM readout system; ext-stripline and CBPM ATF2 magnet PS, magnet movers and final doublet magnets Injection/extraction kicker system Provided by SLAC. Spares for maintenance are under the process of shipping and will be delivered by the end of March, but no future support will be expected. Remote maintenance becomes difficult. Possible longer recovery time to fix a failure by ourselves.

Risks on the ATF operation Long shutdown may happen in the case of expensive failures. KEK faces very tight budget. Decisions will depend on how the ATF is important to move forward the ILC project. Possible failures (beam-operation stoppers) are ... LINAC RF klystrons Highly required! No spare at present. It is on the top of the list for the supplementary budget. Bigger Power Supplies Septum magnets (3000A x 4), Dipoles (DR, BT, EXT) Cooling water facilities LINAC (RF, Magnet), DR (RF, Mag, Vac), ATF2 (Mag)

Planning of the 2017 beam weeks Background In 2016, discussions for the cost reduction of ILC has been started. SRF cost reduction R&D initiated by MEXT and DOE Realistic staging scenarios to bring the cost of the first stage down. SRF cost reduction R&D needs an equipment to be prepared in 2017 for the timely approach within 2 years to contribute the ILC decision. Supplemental funds by MEXT for this R&D are expecting from 2018. The cost of this equipment should be shared by all running ILC programs and resulted 20% budget reduction in FY2017.

Shin MICHIZONO, ACFA, Jan.19 2017 ILC technical status Shin MICHIZONO (KEK) ILC overview Recent R&D results at KEK Scope of the ILC R&D US-Japan Cost reduction R&D CERN-KEK collaboration Staging Shin MICHIZONO, ACFA, Jan.19 2017

Shin MICHIZONO, ACFA, Jan.19 2017 Ministry of Education, Culture, Sports, Science, and Technology On July 7,2016 -Cost reduction study with new technology -Feasibility study with current technology US-Japan cost-reduction R&D Positron: international collaboration Beam-dump: CERN-KEK Shin MICHIZONO, ACFA, Jan.19 2017

Shin MICHIZONO, ACFA, Jan.19 2017 ILC technical status Shin MICHIZONO (KEK) ILC overview Recent R&D results at KEK Scope of the ILC R&D US-Japan Cost reduction R&D CERN-KEK collaboration Staging Shin MICHIZONO, ACFA, Jan.19 2017

US-Japan cost reduction R&D The ILC is the electron-positron collider of ~30 km linac. The main fraction of the construction cost is coming from main linac (ML). Thus we focused into ML (superconducting RF technology) Shin MICHIZONO, ACFA, Jan.19 2017

US-JAPAN cost reduction R&D Short-term R&D (2–3 years) A-1. Niobium material preparation - with new processing for sheeting and piping A-2. SRF cavity fabrication for high gradient and high Q - with a new surface process recipe provided by Fermilab A-3. Power input coupler fabrication - with new-ceramic window (w/o additional coating) A-4. Cavity chemical treatment - with vertical configuration and new chemical Shin MICHIZONO, ACFA, Jan.19 2017

Shin MICHIZONO, ACFA, Jan.19 2017 A-1. Niobium material preparation (with new processing for sheeting and piping) Motivation Niobium material cost for fabricating SRF cavity cell and end-groups is relatively high. If the ingot purity and manufacturing method for each part is optimized precisely as well as satisfying the ILC specification shown in the TDR, the cost will be reduced significantly. Approach - Optimize the ingot purity with a lower residual resistivity ratio (RRR) with accepting specific residual content. - Simplify the manufacturing method such as forging, rolling, slicing and tube forming with small loss. Ingot Manufacturing (forging, rolling, slicing, tube forming) Total, 50% off Ingot Manufacturing Niobium ingot Shin MICHIZONO, ACFA, Jan.19 2017

R&D plan for Nb material JFY2017: - Production of total 4 three-cell cavities High Ta medium RRR(100〜200)material High Ta high RRR(200〜300)material - Evaluation of these cavities from the view points of material cost, chemical cost, etc. - Selection of the material JFY2018,2019: Production of 8 nine-cell cavities (satisfying the high pressure regulation) Material optimization of end-group (including HOM coupler) Chemical processing, vertical test Schedule 2016 2017 2018 2019 KEK Masashi Yamanaka Feasibility study using 4x3-cell cavities (ongoing) Preparing materials Manufacture 8x9-cell cavities Evaluation (Vertical&Horizontal tests) Shin MICHIZONO, ACFA, Jan.19 2017

Shin MICHIZONO, ACFA, Jan.19 2017 A-2. SRF cavity fabrication for high gradient and high Q (with a new surface process provided by Fermilab) - High Q cavity enables the decrease in number of cryogenics leading to the cost reduction. - FNAL researcher (A. Grassellino) found the new cavity preparation recipe having high Q and high gradient. - Demonstrate N2-infusion (High-gradient and High-Q) technology with 9-cell-cavities. By A. Grassellino (FNAL) Preparation of clean-vacuum-furnace + N2dope High-gradient, High-Q example of Cornell Shin MICHIZONO, ACFA, Jan.19 2017

R&D plan for High-Q High-G JFY2016: - Single-cell KEK-cavity processing at FNAL (done) - Q-measurement (with residual magnetic field dependence) at FNAL (done) - Q measurement at KEK (to confirm the measurement system configuration) JFY2017: - New single-cell cavity production - Processing at small vacuum furnace - Procurement of new vacuum furnace for 9-cell cavity JFY2018: - High-Q High-G processing to 3 nine-cell cavity - Production of 8 nine-cell cavities JFY2019: - Performance test - Preparation of the installation to STF-2 2016 2017 2018 2019 KEK Hitoshi HAYANO FNAL process 1 cell processing Performance test Preparation for cyromodule Preparation of vacuum furnace 3-9cell performance Shin MICHIZONO, ACFA, Jan.19 2017 8 - 9cell cavities fabrication Performace test

Shin MICHIZONO, ACFA, Jan.19 2017 A-3. Power input coupler fabrication - By innovating the ceramic window material, we will try to make the coupler without additional surface treatment on the ceramic leading to the cost reduction. - Material cost (including Cu plating) in cavity input coupler is rather high. We will review the materials and Cu plating procedure. Schedule 2016 2017 2018 2019 KEK E. Kako Y. Yamamoto Evauation of ceramic (on going) Design Manufacturing #2 Manufacturing Manufacturing For cyromodule High power test High power test Collaboration with FNAL Shin MICHIZONO, ACFA, Jan.19 2017

Shin MICHIZONO, ACFA, Jan.19 2017 A-4. Cavity chemical treatment The change of the SC-cavity chemical treatment, from horizontal EP and sulfuric acid + HF (TDR) to vertical EP (VEP) + non-HF solution + bipolar EP. VEP with wing-cathode Bipolar EP using non-HF solution Shin MICHIZONO, ACFA, Jan.19 2017

Shin MICHIZONO, ACFA, Jan.19 2017 ILC technical status Shin MICHIZONO (KEK) ILC overview Recent R&D results at KEK Scope of the ILC R&D US-Japan Cost reduction R&D CERN-KEK collaboration Staging Shin MICHIZONO, ACFA, Jan.19 2017

CERN and KEK Collaboration for LCs Nano-beam technology Nano-beam size and the stability as a common subject for ILC and CLIC, using ATF, SCRF technology Cavity fabrication/forming technology, such as electro-hydro forming Cryomodule integration and the industrialization study Input-power couplers and tuners, as a common subject Cryogenic engineering, specially on He inventory management including emergency RF technology, including high-efficiency Klystron Civil engineering Central region design, specially based on the CMS site experience, Optimization of acc. layout and access, using Tunnel Optimization Tool (TOT) originally developed for Future Circular Collider Study at CERN. Radiation Safety and Acc. Tunnel Design Radiation safety design with optimization of the central wall thickness. Beam Dump design study 18 MW beam dump design engineering study as a common subject for CLIC and ILC. Shin MICHIZONO, ACFA, Jan.19 2017

ILC Beam Dump Design of 18 MW with common features with CLIC Shin MICHIZONO, ACFA, Jan.19 2017

Shin MICHIZONO, ACFA, Jan.19 2017 ILC technical status Shin MICHIZONO (KEK) ILC overview Recent R&D results at KEK Scope of the ILC R&D US-Japan Cost reduction R&D CERN-KEK collaboration Staging Shin MICHIZONO, ACFA, Jan.19 2017

The beauty of a linear collider is that it can be staged. LCWS2016 By Lyn Evans Cost reduction All of these measures will reduce the cost by 10-20%, but that is not enough for a realistic project funding. The beauty of a linear collider is that it can be staged. Serious discussions must now start on realistic staging scenarios to bring the cost of the first stage down. Shin MICHIZONO, ACFA, Jan.19 2017

Examples of 250GeV & 500GeV ILC TDR 500GeV CM 250GeV e- 250GeV e+ Option C:250GeV CM 125GeV e- 125GeV e+ Option D:250GeV CM,500GeV tunnel 125GeV e- 125GeV e+ Option E:250GeV CM,500GeV tunnel 125GeV e- 125GeV e+ These configurations will be considered in the working groups at LCC. Shin MICHIZONO, ACFA, Jan.19 2017

Planning of the 2017 beam weeks Impact on the ATF operation Electricity expenses are under the assessment by the KEK executive board. We had submitted an annual plan of electricity to the board and requested to have the same number of beam weeks as FY2016, i.e., 12 weeks. (not include the CERN's support) If we need to apply 20% of reduction on the electricity budget, it results only 10 weeks operation. We are expecting a conclusion of the executive board by the end of this month. Even if it still needs more discussion, we schedule the beam operation before summer. It should be in a range of guarantee then 4 or 5 weeks. Draft of schedule will be discussed at the end of this talk.

Number of ATF beam weeks Fiscal Year Electricity cost became twice. CERN/CLIC supported additional 2 weeks in FY2014 and FY2016. 12 2 Cost Reduction R&D for ILC 2017 10 or more?

Candidate of ATF beam weeks to be discussed