Smart Virtual Power Plants for the Future Electric Grid – Realization and Benefits Authors: Somasundaram Essakiappan, Martin Koerner, Jens-Fredrik Rees,

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

Planning, optimization and regulatory issues
The Benefits of Dynamic Pricing of Default Electricity Service Bernie Neenan UtiliPoint International Prepared for Assessing the Potential for Demand Response.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Campus da FEUP Rua Dr. Roberto Frias, Porto Portugal T F © 2009 Decentralised Energy Systems.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Electric vehicle integration into transmission system
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
K YLE H AAS E NERGY P OLICY M ANAGER M ARYLAND E NERGY A DMINISTRATION Distributed Energy Resources and Resiliency: A State Perspective.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Predictive Learning for Energy Storage Dinos Gonatas (978) Ryan Hanna Center for Renewable Resources and Integration.
1 © A. Kwasinski, 2015 Cyber Physical Power Systems Fall 2015 Security.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
LNBA to Integrate and Optimize DERs for Maximum Value DRP--LNBA Methodology and Demonstration Workshop Dr. Eric Woychik, Strategy Integration, LLC 1 February.
Sensing and Measurements Tom King Oak Ridge National Laboratory April 2016.
Carnegie Mellon University Solar PV and Energy Storage for Commercial & Industrial Customers Shelly Hagerman, Paulina Jaramillo, Granger Morgan, Jay Whitacre.
Évora demonstrator site
Future Power System Control Architecture
Energy System Control with Deep Neural Networks
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Distribution System Analysis for Smart Grid
Transmission-Distribution Interface Working Group Meeting
Davion Hill, DNV GL Elizabeth Endler, Shell
Wind Management at MISO
Asst. Prof. Dr. Sameer Saadoon Algburi
Analysis and Mitigation of Harmonic Currents due to Clustered Distributed Generation on the Low Voltage Network Authors: Ehab Shoubaki, Somasundaram.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Challenges of integrating Variable Renewable Energy Sources (V-RES)
D. Menniti, N. Sorrentino, A. Pinnarelli, M. Motta, A. Burgio and P
VEHICLE ENERGY SYSTEMS
Best practice to build an accurate baseline model
NWA Suitability: Resiliency & Microgrids
Grid Integration of Intermittent Resources
Low Voltage Ride Through (LVRT)
Presentation of the three technological pilots
System Control based Renewable Energy Resources in Smart Grid Consumer
Évora Demonstrator Site
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
penetration of wind power
ETIP SNET + JRC Outcome of the South Eastern + Islands Workshops
EE5900: Cyber-Physical Systems
The Future of Demand Response in New England
Energy Cluster.
Automatic Generation Control (AGC)
ISO New England Net Load Analysis with High Penetration Distributed PV
MIT tour of the California ISO Control Center March 31, 2015
Baselining PMU Data to Find Patterns and Anomalies
Western Wind and Solar Integration Study Phase 1
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
2500 R Midtown Sacramento Municipal Utility District
30 Minute Reserves EPFSTF January 4,
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
EE362G Smart Grids: Architecture
RE Grid Integration Study with India
SMUD’s Microgrid Definition
Sandip Sharma ERCOT Manager, Operations Planning
Arslan Ahmad Bashir Student No
Jakov Chavez Vega Kalle Valtavirta
The Global Forum Electricity Ancillary Services and Balancing | Berlin, SmartNet Pilots: The demonstration of the different TSO-DSO coordination.
Waleed Iftikhar Michel Mabano
Solar Energy Commercialization
Load forecasting Prepared by N.CHATHRU.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
The Future Grid and Energy Storage
Alex Glenn President.
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

Smart Virtual Power Plants for the Future Electric Grid – Realization and Benefits Authors: Somasundaram Essakiappan, Martin Koerner, Jens-Fredrik Rees, Ehab Shoubaki, Johan Enslin Presenter: Dr. Johan H. Enslin, FIEEE, FSAIEE, PrEng Director, Energy Production and Infrastructure Center (EPIC) Duke Energy Distinguished Chaired Professor UNC Charlotte, NC, USA JEnslin@uncc.edu EPIC.UNCC.EDU The authors wish to acknowledge and thank Duke Energy for their financial support to this project.

The Vision: An Integrated Grid Power System that is Highly Flexible, Resilient and Connected and Optimizes Energy Resources Source: EPRI

The Vision: Virtual Power Plants Power System that is Highly Flexible, Resilient and Connected and Optimizes Energy Resources Virtual Power Plants (VPP) are the building blocks of the Grid of the Future Small, DERs located throughout a region work together to provide same functionality as a large central power station Achieved through centralized and distributed controls, monitoring, diagnostics, prediction and forecasting Perform control at local-level, minimize communication infrastructure

Microgrids and Virtual Power Plants (VPP) Microgrids are typically confined to smaller geographical area; VPPs may not be – components may be far away from each other and may consist of several microgrids Microgrids have a local controller for close control of the energy balance and voltage profile; VPPs have centralized dispatch control (ISO based) for dispatch, ancillary services, spin, demand response, frequency and voltage regulation. VPPs emulate a large power generating plant by responding to market demand, pricing, ADR/ancillary service pricing, load and resource forecasting Source: DOE

Structure of a Virtual Power Plant (VPP) – forecast and analytics Precise models of DER plants and weather forecasts are inputs Accurate forecasts are assumed available ADR resources, LMP, auxiliary service requirements from an economic perspective System agnostic approach using historical generation data

Structure of a Virtual Power Plant (VPP) – electrical systems control DER-level controllers calibrate power references based on dispatch schedule Power to/from grid is excess/deficit power in VPP area Local loads are serviced and various bus voltages are supported BESS support bus frequency by switching to charging/discharging mode

An Example of the Emerging Virtual Power Plant Source: Petra Solar, NJ USA

Forecasting & Simulation Analysis using RTDS VPP analyzed three PV plants for load servicing and two BESS for bus V & f support Forecasting using analytical method for resources (PV) and loads PV power dispatch determined using results of the forecast BESS provide voltage and frequency support at the buses Droop characteristics and machine inertia of large synchronous generators implemented using power electronics control For resiliency purposes, VPP can be microgrid

Forecasting using statistical methods: Load forecasting is non-deterministic – hence affected by stochastic fluctuations Linear regression model1 is used to predict load for defined time intervals - based on the correlation between load, temperature and time In a ‘training phase’ historical data is used to calculate coefficients β0 to β9 ‘Trend’ captures the data trend for the entirety of historical data; ‘Day’, ‘Month’ and ‘Hour’ indicate time instant in future 1T. Hong, “Short-term electric load forecasting”, PhD dissertation, September 2010

Forecasting using statistical methods: Forecast and Actual load for one week (Data from publicly available databases for a city in Pennsylvania2). Discrepancies in forecasting are to be managed and mitigated by control algorithm 2ISO-PJM, “Hourly load data from ISO-PJM operating area”, Available online

VPP Electrical System Control & Simulation: Hz/W and Volt/VAr characteristics implemented in Smart Inverters During over-frequency, PV is curtailed, characteristics reprogrammed based on dispatch schedule During nominal frequency, PV injects all available real power Voltage support provided outside nominal range (0.98 to 1.02 in this example) During under- frequency, BESS discharge providing frequency support at PCC (f range determined by SoC During over-frequency, BESS charge before PV curtailment

VPP Electrical System Control & Simulation: Time 11:00 12:00 13:00 Loadfore 106.60 kW 107.57 kW 108.76 kW PV1fore 63 kW 67 kW 70 kW PV2fore 55 kW 59 kW 62 kW PV3fore 57 kW 61 kW 64 kW Bat1(SoC) 0 kW (SoC = 90%) Bat2(SoC) Psold 68.4 kW 79.43 kW 87.24kW Load forecast using regression function PV forecast from insolation and temperature forecasts VPP generation – VPP load = Psold

RTDS Simulation Results – Power Generation 1 hr simulation time interval scaled to 20s of real-time Pref values for DGs change according to dispatch schedule & forecast BESS stay in frequency support mode

RTDS Simulation Results – Frequency Support Grid demand surge causing a dip in system frequency BESS injects watts, providing frequency support at the node

RTDS Simulation Results – Voltage Support Sags / Swells in bus voltage Controller responds by injecting or consuming VARs, regulating the voltage within limits

Resiliency to Forecasting Errors – 24 hr. simulation 24 hours Psold is the power sold on the day-ahead market (or similar) using the best available forecasts for load and resources Load forecast is superimposed with a 5% stochastic error, for analysis purposes (5% further variations than anticipated) Insolation forecast superimposed with a 30% stochastic error The electrical system controllers should provide robust voltage and frequency support, and continue to generate “Psold”

Impact to Forecasting Errors Controller robust performance verified – errors in forecast are mitigated using BESS and power injected to grid closely follows Psold Profile of loads serviced closely follows demand Power generation by PV plants (all plants rated the same), fluctuations reflect insolation swings BESS compensating for errors and providing V&f support Power injected to grid (red) closely follows day-ahead power sold on the market (black) Results shown till 12:00 noon due to results file size limits

Summary and Conclusions: VPP’s need accurate forecast and real-time analytics VPP analytics provide forecasting of loads, DERs and generate a dispatch schedule VPP distributed control provides droop-based power control and bus voltage/frequency support Communications are for supervisory and energy market participation Future Work: Robustness of VPP to communications delays and breakdown Improvement of forecasting resolution to 15 minutes or better Development of the ability to operate DGs in a plug-and-play manner – truly system agnostic VPP Develop scaled VPP in laboratory as demonstration.

Effect of Forecasting Errors on BESS Sizing Results show direct correlation between %error and BESS sizing Better load and resource forecasting leads to reduction BESS size requirements (energy rating of BESS) As error% goes up, mitigation requires higher energy throughput through BESS Type I and Type II errors Amplitude errors (stochastic) Baseline scenario (no forecasting errors) Image source: ABB