INDIA@COP22 Interlinking of rivers as an adaption strategy to address the impact of climate change on water resources Sustainable Lifestyle = Positive.

Slides:



Advertisements
Similar presentations
Interlinking of Rivers: Why it won’t work
Advertisements

LOGO Bangkok, May 2009 Water Resources Management in Ba River Basin under Future Development and Climate Scenarios Presented by: Nguyen Thi Thu Ha Examination.
Flood Management in GBM Basin: A Mechanism for Natural Resource Management Between Co-riparians Priyanka Mallick JNU.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Hydropower Development: Experience of Nepal
Spatio-Temporal variability of Water resources in the Ganga basin By Subashisa Dutta Associate Professor DEPARTMENT OF.
MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT &GANGA REJUVENATION
Ministry of Water Resources, River Development and Ganga Rejuvenation Current Focus and Future Directions.
Transboundary supply issues
Interlinking of Rivers: A Dispassionate Look South Asia Network on Dams, Rivers & People
WATER ISSUES IN THE EASTERN EUROPE:
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
Upali Amarasinghe IWMI Delhi
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
Strategic Analysis of India’s National River-Linking Project [NRLP]
RESERVOIR POSITION CWC monitors 81 important reservoirs and issues weekly bulletins of storage position Total designed live storage capacity = BCM.
 Economics is the study of the allocation of scarce resources  One of economics' prime advantages is addressing trade – offs among various factors 
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND INKOMATI WMA.
Trans-boundary Processes: Interfacing micro and the macro Ajaya Dixit Institutional Social and Environmental Transition-Nepal River Waters: Perspectives.
Water Resources Development In Central Part Of India By Arthee.V Bte
Nityanand Singh N.A. Sontakke H.N. Singh Indian Institute of Tropical Meteorology, Pune 2005 INSTRUMENTAL PERIOD RAINFALL VARIATION OVER MAJOR AND MINOR.
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
4 TH BIENNIAL ROSENBERG INTERNATIONAL FORUM ON WATER POLICY ( 7-8 SEPTEMBER 2004 ANKARA) TURKEY’S WATER RESOURCES MANAGEMENT AND TRANSBOUNDARY WATERS POLICY.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND MVOTI TO UMZIMKULU WMA.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND MIDDLE VAAL WMA.
1 Presentation On Sub-committees of Special Committee for Inter Linking of Rivers.
Water & Climate Change in Bangladesh Developing an integrated river basin management framework under the lens of loss and damage METHODS Principle research.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND BERG WMA.
Vulnerability and Adaptation of Water Resources to Climate Change in Egypt Dr. Dia Eldin Elquosy
1 Vladimir Smakhtin, Luna Bharati, Nilantha Gamage August, 2007 PLANNING WATER TRANSFERS IN KRISHA RIVER BASIN: TECHNICAL FEASIBILITY AND ENVIRONMENTAL.
Assessment and planning of the water resources under various scenarios in the Ganges and Indus basin: Glaciers contribution and WEAP modelling Devaraj.
NATIONAL WATER RESOURCE STRATEGY
Opportunities and Challenges of Water Resources Management in Lao PDR
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
Indo-UK Programme on Climate Change Impacts in India : Delhi Workshop, Sep. 5-6, 2002 Objectives Analysis of spatio-temporal variability of precipitation.
Water Resources in the Indus-Gangetic Basin
Mekong River Commission Meeting the Needs - Keeping the Balance MRC Water Utilization Programme: GEF International Waters Project (GEF/World Bank)
ICAP SAFA Conference 2016 South Asia: Corridor of Opportunities Lahore, January 30, 2016 Mirza Hamid Hasan.
N. K. Manglik Director.  Hydro-meteorological observations could be broadly defined as the scientific way for collection of flow data at a specific location.
Negotiations and Agreements Between Ganges River Basin Riparians Khalid Khan Khalid Saifullah Muhammad Arif Goheer.
WATER AVAILABILITY. Total availability of water in earth-1.37X18 8 M ha m Fresh water – 2.8 % Saline water – 97.2% Surface water – 2.2% Groundwater- 0.6%
Rain Water Conservation by Sita Ram Singh, FNA, FNAE, FNAAS.
Interlinking of Rivers Status, Issues and Challenges
RELEVANCE OF TRADITIONAL INDIAN METHODS OF WATER MANAGEMENT IN THE PRESENT ERA Vivek P. Kapadia, Government of Gujarat IWW-2016, PD-3.
INTERLINKING OF RIVER BASINS:THEIR ECONOMIC AND ECOLOGICAL EFFECTS Presented By Nithish Kumar K.M 1DS08CV139 Guided By Dr. B.S. Thandaveswara 1.
Jancy Vijayan Director(MDU), NWDA. MURRAY DARLING BASIN AREA.
NATIONAL HYDROLOGY PROJECT CENTRAL WATER COMMISSION.
2 Drought Management And Water Harvesting 3 Index 1.Definition of Drought 2.Types of Drought 3.Causes of Drought 4.Effects of Drought 5.Drought contingency.
Dr. B.P Das Expert Consultant FAO, UN Former Engineer In Chief & Chief Advisor Department of Water Resources, Odisha Former Vice Chairman, EAC for River.
05,April, th India Water Week 2016 April 4-8.
Development of River Basin Models for Investigation of Improved Water Management Options: Case Study of the Upper Godavari Basin in India Dr A.S. Garudkar,
ISA ACTIVITY-RIVERS BACK BONE OF INDIA
BASIN PLANNING & MANAGEMENT ORGANISATION, CENTRAL WATER COMMISSION
ASSESSMENT OF ENVIRONMENTAL FLOWS FOR THE TAPI RIVER BASIN, INDIA
Integrated Water Resources Planning for optimal benefits to the society Panel Discussion-3 India Water Week 2017.
Engineering Hydrology (ECIV 4323)
FOR ASSESSMENT THE WATER QUALITY OF RIVER YAMUNA
BRAHMAPUTRA-GODAVARI LINK
Climate Change and Water Resource Sector
Economic Development in CHATTISGARH
Concepts in Water Resources Management
Economic Development in JHARKHAND
Central Asia is considered a global hotspot with respect to impacts of climate change on the mountain cryosphere and downstream societies, most notably.
GEOLOGICAL & ENVIRONMENTAL INVESTIGATIONS
Food Security in Different Phases
Drought Management and Water Scarcity Adaptation
Engineering Hydrology (ECIV 4323)
DRIANAGE SYSTEM OF INDIA
Engineering Hydrology (ECIV 4323)
Presentation transcript:

INDIA@COP22 Interlinking of rivers as an adaption strategy to address the impact of climate change on water resources Sustainable Lifestyle = Positive Climate Action www.indiaatcop22.org

INDIA@COP22 Issues and Challenges • Seasonal and Temporal variation in Water Availability Most of the Rainfall taking place 3-4 months of monsoon Wide variation in water availability among basins and regions. • Recurring Floods in some areas and droughts in some • Increase in water demands for various sectors for needs of ever rising population Likely impacts of climate change www.indiaatcop22.org

INDIA@COP22 Sl. No. River Basin Catchment area (Sq.Km) Average Water Resources Potential (BCM)* Utilisable surface water resources (BCM)** 1 Ganga-Brahmaputra-Meghna (a) Ganga 861452 525 250 (b) Brahmaputra 194413 537.2 24 (c) Barak & others 41723 48.4 2 Godavari 312812 110.5 76.3 3 Krishna 258948 78.1 58 4 Cauvery 81155 21.4 19 5 Subernarekha 29196 12.4 6.8 6 Brahmani-Baitarni 51822 28.5 18.3 7 Mahanadi 141589 66.9 50 8 Pennar 55213 6.3 6.9 9 East Flowing Rivers between Mahanadi and Pennar 86643 22.5 13.1 10 East Flowing Rivers between Pennar & Kanyakumari 100139 16.5 11 Minor Rivers 36302 31 -- www.indiaatcop22.org

Inter-linking of Rivers INDIA@COP22 Inter-linking of Rivers • Strategy for addressing issue of Recurring Floods and droughts in the country Links identified under National Perspective Plan 14 Under Himalayan Component 16 Under Peninsular Component National Water Development Agency has completed Feasibility Studies for 2 Links under Himalayan Component 14 Links under Peninsular Component www.indiaatcop22.org

Inter-linking of Rivers INDIA@COP22 Inter-linking of Rivers •Benefits Additional Irrigation Potential : 35 million Hectare Hydro-Power Generation : 34,000 MW Other Benefits: Domestic & Industrial Water Supply Mitigation of Droughts Flood Management Navigational Facilities Employment Generation Fisheries Salinity Control Pollution Control Infrastructural Development Socio – Economic Development www.indiaatcop22.org

Preliminary Studies/Feasibility Reports completed INDIA@COP22 Preliminary Studies/Feasibility Reports completed Sl. No Particulars Peninsular Himalayan Total 1 Water balance studies of basins/sub basins 137 - 2 Water balance studies at diversion points 52 19 71 3 Toposheet and storage capacity studies of reservoirs 58 16 74 4 Toposheet studies of link alignments 18 37 5 Pre-Feasibility reports 14 32 6 Feasibility Reports 2 ( Indian Portion) 7 (Draft FRs) www.indiaatcop22.org

Water Transfer Links HIMALAYAN COMPONENT INDIA@COP22 2. Kosi – Ghagra 1. Manas –Sankosh - Tista - Ganga 2. Kosi – Ghagra 3. Gandak – Ganga 4. Ghagra – Yamuna 5. Sarda – Yamuna 6. Yamuna – Rajasthan 7. Rajasthan – Sabarmati 8. Chunar – Sone Barrage 9. Sone Dam – Southern Tributaries of Ganga 10. Ganga – Damodar – Subernarekha 11. Subernarekha – Mahanadi 12. Kosi – Mechi 13. Farakka – Sunderbans 14. Jogighopa – Tista – Farakka HIMALAYAN COMPONENT www.indiaatcop22.org

Water Transfer Links PENINSULAR COMPONENT INDIA@COP22 1. Mahanadi (Manibhadra) – Godavari (Dowlaiswaram) 2. Godavari (Inchampalli) – Krishna (Pulichintala) 3. Godavari (Inchampalli) – Krishna (Nagarjunasagar) 4. Godavari (Polavaram) – Krishna (Vijayawada) 5. Krishna (Almatti) – Pennar 6. Krishna (Srisailam) – Pennar 7. Krishna (Nagarjunasagar) – Pennar (Somasila) 8. Pennar (Somasila) – Cauvery (Grand Anicut) Cauvery (Kattalai) – Vaigai – Gundar 10. Ken – Betwa 11. Parbati – Kalisindh – Chambal 12. Par – Tapi – Narmada 13. Damanganga – Pinjal 14. Bedti – Varda 15. Netravati – Hemavati 16. Pamba – Achankovil – Vaippar www.indiaatcop22.org

Priority links under NPP INDIA@COP22 Sl. No Name of Link Status 1 Ken-Betwa Link Phase - I DPR completed. Statutory clearances under process 2 Ken-Betwa Link Phase - II 3 Damanganga – Pinjal Link DPRs completed. Issue of water sharing to be agreed by concerned states 4 Par-Tapi-Narmada Link 5 Mahanadi – Godavari Link Concurrence of Odisha for taking up DPR being pursued 6 Sankosh-Teesta-Ganga-Mahanadi Link Concurrence of West Bengal for taking up DPR being pursued www.indiaatcop22.org

Special Committee for “Interlinking of Rivers” A Special Committee for ILR under Hon’ble Minister (WR,RD&GR) has been constituted Ten meetings of the Special Committee for ILR have been held. Special Committee for ILR has constituted four specific sub-committees; Sub-committee for comprehensive evaluation of various studies/reports (6 meetings held so far) (ii) Sub- Committee for system studies for identification of most appropriate alternate plan (9 meetings held so far) (iii) Sub-Committee for consensus building through negotiations and arriving at agreement between concerned States (2 meetings held so far) (iv) Sub – Committee for restructuring of National Water Development Agency (7 meeting held, report completed & submitted). www.indiaatcop22.org 10

Inter-linking of Rivers INDIA@COP22 Inter-linking of Rivers •Response to Climate Change Increase in global temperature With Expected increase in rainfall intensities and shorter durations, the Storages created for ILR will be useful in storing water in such an eventuality Useful both for floods and drought management. Will benefit all the inter-connected Basins including the donor basins www.indiaatcop22.org

Inter-linking of Rivers INDIA@COP22 Inter-linking of Rivers •Response to Climate Change Decrease in global temperature Transfer is being planned on huge monsoon surpluses and not on snowfed surpluses from Himalayan Rivers. Flow during non-monsoon is adequate for the demands of the basin itself. But if the snow contribution is reduced the storages created will be beneficial for the basin itself. Based on water availability in connected basins, water can be judiciously utilized in both the basins. www.indiaatcop22.org