HEI Modernization Project – 60 Day Review

Slides:



Advertisements
Similar presentations
What is Business Architecture?. Overview Agility matters today more than yesterday Previous methods for managing change were designed for the needs of.
Advertisements

INTRODUCTION Agenda BUSINESS CHALLENGES FEATURES OF RAPID MARTS SOLUTION OVERVIEW DWH USING SAP RAPID MARTS BENEFITS TO BUSINESS USERS.
BI Web Intelligence 4.0. Business Challenges Incorrect decisions based on inadequate data Lack of Ad hoc reporting and analysis Delayed decisions.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
JUNE 2007 page 1 EDS Proprietary Applications Modernization Services Modernizing the Applications Portfolio.
Basic guidelines for the creation of a DW Create corporate sponsors and plan thoroughly Determine a scalable architectural framework for the DW Identify.
Iterative development and The Unified process
Next Generation Trnsport Trnsport Users Group Conference Field Management TAG November 7, 2005.
Enterprise Business Intelligence Consolidated Business Intelligence Project February 2014 Management Overview.
Understanding Data Warehousing
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
1 CISCO SAFE: VALIDATED SECURITY REFERENCE ARCHITECTURE What It Is Business Transformation Top Questions To Ask To Initiate The Sale Where It Fits KEY.
Education Data Warehouse: A Vital Tool for Assessing Florida’s Education System.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Lecture 19 Chapter 10 A Portfolio Approach to Managing IT Projects.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
MA Educational Data Warehouse Project MADOE and School District Collaboration Maureen Chew MADOE MA Digital Govt Summit 12/11/2007.
Systems Analysis and Design in a Changing World, Fourth Edition
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Rajesh Bhat Director, PLM Analytics Applications
Oracle’s EPM System and Strategy
Project Discovery – Monday Holyoke 561 Most updates will only have 30 minutes maximum for their presentations. At least 10 minutes should be left for Q&A.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
CS223: Software Engineering Lecture 32: Software Maintenance.
© 2015 IBM Corporation Introducing. © 2015 IBM Corporation 2 SELF-SERVICE Covers a wide spectrum of users Power users Consumers Creators Level of Management.
Overview of SAP Application Services By Accely. Introduction Developed organizations in any business industry will invest in SAP programs to offer progressive.
Friends and Partners of Aviation Weather Summer 2016 Meeting
From Idea to Business Case
SAM Baseline Review Engagement
Applying Robotics Process Automation to drive Operational Excellence
Stony Brook University Data Strategy
Applications Modernization Services
Software Engineering Management
HEI Modernization Project – 90 Day Review
Getting Down to Business
Blue Mixology.
A UNIFIED ECOSYSTEM FOR MARKET DATA VISUALIZATION
QlikView Connector for Informatica Powercenter An Introduction
Parrot Solutions Pte. Ltd
Computer Aided Software Engineering (CASE)
Fred Richards, Ellucian
Process Improvement With Roles and Responsibilities explained
SAM Server Optimization Engagement
Description of Revision
Microsoft Services Cloud Productivity Solutions
Vision Facilitation Template
SAM Infrastructure Optimization Engagement
Agile Power BI for self service.
Project Ideation Agile Down-to-Earth © 2016.
Application Portfolio Optimization
C.U.SHAH COLLEGE OF ENG. & TECH.
Continuity Guidance Circular Webinar
CS310 Software Engineering Lecturer Dr.Doaa Sami
Employee engagement Delivery guide
Portfolio, Programme and Project
Zach Wahl and Tatiana Baquero Project Performance Corporation (PPC)
Project Advance Introduction.
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
Microsoft Motion business architecture methodology
Overview Headlines RSP – Progress Overview General progress report
KEY INITIATIVE Financial Data and Analytics
Are you measuring what really counts?
1 Envision 3 Outline 4 Design
Wide Ideas Idea Management Software Idea Management Process
David Gilmore & Richard Blevins Senior Consultants April 17th, 2012
OU BATTLECARD: Business Intelligence
IT Next – Transformation Program
OU BATTLECARD: Oracle SOA Training & Certification
OU BATTLECARD: WebLogic Server 12c
Presentation transcript:

HEI Modernization Project – 60 Day Review September 12th 2016 Reporting Period: 6/12/2016 to 9/12/2016

HEI Modernization Project Background Sixty-day Checkpoint Project Challenges Project Phase Approach Project Health Metrics Questions / Feedback Next steps Roadmap

Background Why do a 60 day review? What will we cover? Periodic update to sponsors and other ODHE leadership Share progress / challenges, adjust to feedback What will we cover? Quick project recap (for new attendees) High level accomplishments and challenges Drill into details if desired Who is the audience? ODHE Leadership Other interested ODHE parties that don’t have operational involvement with project www.oh-tech.org

Sixty Day Checkpoint Working draft of the new HEI data model is complete. Business and IT resources are reviewing and refining. As-Is analysis of all submission files is complete with comprehensive documentation of warnings and errors. As a proof of concept the team completed an end to end file submission for the Physical Structures (PS) file. Data Informatica mapping development for data movement and transformation is under way for Facilities, Academic Programs, and Enrollment file submissions. Data integration tool selection and purchase complete Started the evaluation of Business Intelligence reporting tools “Don’t borrow my watch to tell me what time it is.” Avoid stating the obvious. Discovery puts us in a position to deliver on 2 and 3….it is not in and of itself a reason to do the project. Multiple sessions – Good Cross Section: Tech Functional, LeaderContributor, etc.

Ph1: Extract, Transform Load Phase Benefits Phased Project Approach Functional Technical Q2 Q3 Q4 Q1 Q2 Ph1: Extract, Transform Load 6/9/17 Q3 Enhanced reliability Performance Improvements Faster turnaround on change requests Risk mitigation (platform and staffing) Align with state security model (SSO, ID Mgt) Enhanced user interface Risk mitigation (platform and staffing) Improved audit capabilities Ph2: Report Migration 7/31/17 Contemporary analysis UI Staffing flexibility (remove SAS dependency) More efficient analysis operations Optimized data structure Logical federation of disparate sources Data Warehouse Ph3 8/7/17 Optimization Public Analytics Provide Ph3 capabilities to public Reduce public requests for data Amortize technology investments over larger user base Ph4 Data Visualization Ph5 Leading edge user tools providing next level insights Increased usage and benefit from existing data sets www.oh-tech.org

What is In Flight – By the Numbers Task In Flight by Work Stream 31 of 60 Technical Architecture tasks are complete. 22 are in progress. 77 BA tasks are complete with. 80 tasks out of 316 are in flight. 33 developer tasks are complete and 60 are in flight out 144. Project Health www.oh-tech.org

Closing Goals for Next Reporting Period Complete all remaining data model refinements Complete development of data movement for Academic Programs, Facilities, and Enrollment Select a Business Intelligence reporting tool Begin integration and user testing General Reminders: - According to plan (effort), we are <1/3 of the way done… There’s plenty of time to change course / approach to meet your needs! Solicit honest / open feedback on us…what do you like / not like about how we are going about things. Next Steps: Deep dive on plan assumptions and specifics Deep dive on roadmap assumptions and specifics (resourcing Pending Action Items: Still digesting usage stats / Model (JC / Jill & Joel)

Roadmap Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 SCOPE: ETL Implemented Canned Reporting Ad Hoc Reporting Public Analytics Data Visualization SCOPE: New ETL tool used to implement data loads Decommission legacy ETL programs. Implement standard, repeatable reports against new staging tables Capture usage statistics to establish prioritization. Create ad hoc reporting infrastructure Internal: SAS Substitute External: Restricted Queries Present analysis tools w/safe metadata layer developed in Phase 3 to public. Select and implement data visualization tool. Internal tool at launch Extend to trusted partners or public at large. BENEFITS: Foundational element for new DW: enhances agility, enables unified data sources on back end. Staging tables enhance traceability Systematic data checks built into solution. Reports served from new environment Standardized formats and branding. Assesses extent of Spreadsheet-ware Transparent cutover for users Consistent, safe access to data on demand. Free IT from report writing business Enable safe self-service access to data Free ODHE staff to perform higher order analytics Gain insights not readily apparent from traditional data presentation techniques Emerging technology, use cases still evolving. Three Key Principles in Building Roadmap Reduce implementation risk Bring Value Quickly Continually Learn and Adapt High Level Features  Benefits (Drawbacks) of This Approach: Phased implementation  Lower disruption to department ops Parallel systems  Lower risk, increase ability to validate Out phases introduce forward technologies on architecturally correct platform  Lower risk, get fundamentals right, then add headline features. Canned Reporting Phase begins discussions on measures and dimensions…Ad Hoc Reporting Phase cements it. Next Iteration of this: Adds Dates and STABILIZE: Phase 1 and 2 STANDARDIZE: Phase 2 and 3 OPTIMIZE: Phases 3, 4, and 5 Next Steps on Roadmap: Validate / Revise Top Level Phases (based on feedback) Drive down next level of cost estimates, resource requirements, and schedule (rough cut) Articulate connection points (and possible overlaps) between Phases.