ERCOT Black Start Enhancements

Slides:



Advertisements
Similar presentations
Software Analysis Tools
Advertisements

Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
EIUG – Wheeling Methodologies
Managing Project Procurement
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Houston Area Dynamic Reactive Project March 11,
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Black Start Plan Ricson Chai ROS. Overview Introduction Black Start selection criteria Test Criteria & RFP. Black Start Plan & new features.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
ERS Update – DSWG Presentation September 21, 2012.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Nodal Protocol Revision Request (NPRR) TITLE: Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin March.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
Operations Update ERCOT Board Meeting March 18, 2003.
Appeal of Proposed Real Time Market Mitigation Measures Texas Nodal Market May 18, 2004.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Dated: 17 February 2016 Instructor :Kashif Mehmood.
SLIDE 1 VICTORIA REGION RESTART July 2013 PRESENTED BY PETER BIDDLE.
SLIDE 1 SOUTH AUSTRALIA REGION RESTART July 2013 PRESENTED BY PETER BIDDLE.
SLIDE 1 SRAS REVIEW QUEENSLAND REGION July 2013 PRESENTED BY PETER BIDDLE.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
SLIDE 1 SRAS REVIEW TASMANIA REGION July 2013 PRESENTED BY PETER BIDDLE.
(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,
SLIDE 1 SRAS REVIEW NEW SOUTH WALES REGION July 2013 PRESENTED BY PETER BIDDLE.
Nodal Planning Go Live Austin, TX February 3, 2011
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Unit Commitment Discussion with QMWG
NMT – Network Operations Modeling & Telemetry - Project
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
MOPC Meeting Oct , 2016 Little Rock, AR
GC0104 – Demand Connection Code (DCC)
Black Start Study Report
Western Electricity Coordinating Council
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
Damitha Kumarasinghe Director General
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Black Start Overview.
John Dumas Director, Wholesale Market Operations
IG BASED WINDFARMS USING STATCOM
Southern Cross Directives Planning Items
Phase Angle Limitations
UFLS Workshop Discussion #3
Reflecting Losses in DR within ERCOT August 22, 2012
Oncor Electric Delivery Company LLC
Compliance Report to ERCOT TAC February 2007
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Evolving Economic Dispatch in SPP
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Electricity Procurement Options
Planning Tools Overview
CEO/Co-founder, SOS Intl
DEC System Voltage Planning - June 2018
Impacts and Actions Resulting from the August 14, 2003 Blackout
Yale Runback Local Area Protection Scheme
California ISO’s CIM Based Model Management
Planning Tools Overview
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Software Analysis Tools
Presentation transcript:

ERCOT Black Start Enhancements Sandip Sharma Manager, Operations Planning 01/12/2017

Overview Current Black-Start Procurement Process Issues with Current Procurement Process Proposed Improvements

What is Black-Start Service Black Start is the procedure to recover from a total or partial shutdown of the transmission system which has caused an extensive loss of supplies. The Black Start generator is required to provide start up power to other power stations as the system restoration progresses and will eventually be required to synchronize to other power islands. In the event of a Black Start, the service requires the provider to: Start up its main generator(s), Carry out in coordination with the TDSP initial energization of sections of the Transmission System and distribution network, and, Support sufficient demand to create and control a stable power island. The Black Start Service (BSS) is procured from generators that have the capability to start main blocks of generation from an on-site auxiliary generator, without reliance on external site supplies.

Current Black Start Service Procurement Objective Select a group of Black Start capable resources that meets all of the Black Start selection criteria with minimum cost based upon the response to ERCOT RFP. Selection criteria includes Analysis of Bids using MATLAB program (multiple runs) Simulated restoration of near peak load (68,500 MW) Proximity to load centers/nuclear power plants/gas pipelines Expected restoration of off-site power to nuclear units within 4 hours Availability of strong transmission network (restoration corridors) Biennial procurement process Up to 18 black start units procured in the past Most recent procurement cycle procured 14 units

Nexant Study - Issues with Current Process Reduced interest in BSS contracts. Reasons for reduced interest in bidding for Black Start contracts – Prohibitive entry/set-up costs Topology Changes Prohibitive costs of NERC CIP compliance, etc. No clear reasoning for the number of islands employed other than historical and the number of procured resources Non-optimizing analysis tools for BSS Non-optimized Black Start cranking sequence Lack of power flow solution in BSS analysis tool Potentially procure unit that are in unhelpful location Biennial selections are same due to limited number of bids Two year contract is insufficient time for units to recover the cost of adding Black-Start capability

Nexant Study - Proposed Improvements Defining islands in a way that leads to faster load recovery rather than in reaction to unit selection. Items to consider – Load centers Proximity to nuclear power plant System topology If islands cross TSP boundaries, coordination requirements Sync-check relay locations Conducting a Black Start Capability study of the system with the aim of generating a ranking of resources. Use an optimizing software to determine the cranking sequence in coordination with the TSPs Optimal Black Start Capability (OBC) tool from Electric Power Research Institute (EPRI) Select primary and alternative Black Start units based on locations Valid power flow solution of intermediate system states with no violations Implement incentives for resources willing to participate in Black-Start Service Changing the black start (BS) procurement cycle to a longer period to allow for better confidence in return on investment.

Next Steps Complete system restoration studies with all potential resources to short list the most optimal set(s) of black start units for each island. Publish the study results and the list of resources File NPRR to change the procurement cycle

Questions?