Working with Ultra High Vacuum (UHV) Equipment

Slides:



Advertisements
Similar presentations
Safe Use and Operation of Vacuum Lines
Advertisements

Evaporator Carbon coating. Evaporator Step 1 Check that all switches on control console are to OFF position. Automatic Vacuum Control knob should be.
Sessler Group Safety Talk Safe Operation of Vacuum System for Avoiding Danger of Liquid Oxygen Ren-Tsung Wu October 23 rd,
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
What we do and why we do it. Know how to inspect an SCBA bottle for damage prior to fill Know how to use the compressor Know how to document problems.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
Omicron LT UHV STM Do’s and Don’ts. General (Instrument) Eye protection should be worn when near to a viewport, even if using protective covers. Never.
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Fundamentals Lecture 5 G.J. Mankey
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum.
Varian 3118 Thermal Evaporation System
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
Imago LEAP Recovery Procedure for Cryo-Compressor and Cold Finger The LEAP is equipped with a Uninterrupted Power Supply (UPS). Located in the 19 inch.
Solar Cell conductive grid and back contact
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
Methods in Surface Physics Experimentation in Ultra-High Vacuum Environments Hasan Khan (University of Rochester), Dr. Meng-Fan Luo (National Central University)
Safety in Floriculture “For Your Protection” Miss. Perry Lincoln High School.
Techniques of Vacuum and Basics of High Voltage (2/3) Pauli Heikkinen Jyväskylä University.
Vacuum Fundamentals High-Vacuum Technology Course Week 6 Paul Nash HE Subject Leader (Engineering)
Vacuum Technology.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Safety in Lab Environment. Safety Rules 1. Follow Instructions…Understand what you are going to do carefully before attempting to do anything. 2. Wear.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Omicron LT UHV STM Do’s and Don’ts. General (Instrument) Eye protection should be worn when near to a viewport, even if using protective covers. Never.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Chapter 4 Training Package HCFC Phase-out RACSS – UNEP 2014 Servicing of HCFC/HFC Based Air-conditioners.
Safe Use of Schlenk and Vacuum Lines
BioTector COD TOC TN analyzer
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
Holders and Pumps Summary
TROUBLESHOOTING GUIDE FOR GAS HOT WATER HEATER
14 Refrigerant Recovery, Recycling, and Recharging.
Lab Safety.
Safety in Floriculture “For Your Protection”
Vacuum At LLO 2016 SURF Udochu, Ogbonnaya LIGO-T
1.3-GHz Cavity Vacuum Furnace at IB4
DESY Experiences on Use of Gas overlay during Assemblies
Safety A top priority!.
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
CO239 Risk Register is found by the entry Doors, please read and familiarise yourself with the Risks and Controls required in this Room Risks in this Room.
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
How to Protect Your Vehicle in Cold Weather
Schlenk Line Techniques
AC Repair & Furnace Repair - Tips To Consider
Tips for Water Damage Restoration and Repair at Home
Fuel Supply System Service
The BioTector B3500ul TOC analyzer Process Tests
Safety presentation for DNI
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
Plasma Cleaning Safety Presentation
Safety and Sanitation.
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Safety and Sanitation.
Lab Safety.
Rajan Bhandari Senior Lecturer
A. General Safety Rules 1. Listen to or read instructions carefully before attempting to do anything. 2. Wear safety goggles to protect your eyes from.
Lockout/tagout Refresher Training
Sterile Technique.
ENVIRONMENTAL, HEALTH & SAFETY POLICY
Risk Management Student Powerpoint
Presentation transcript:

Working with Ultra High Vacuum (UHV) Equipment Matthew Marcinkowski Group Meeting January 23, 2017

Sykes Lab UHV Instruments LT-STM VT-STM 3 TPD Chambers

Outline Installation Pumping Down Bakeouts Experiments Venting

Outline Installation Pumping Down Bakeouts Experiments Venting

Installation-Cleanliness Use clean tools. Wear gloves! Work on clean aluminum foil. Cover any chamber openings with foil and red plastic covers. Finger prints outgas at the rate of 1 X 10-5 Torr Liters per second! Leaving finger prints on UHV components may prevent the chamber from pumping to a low enough pressure. The same goes for anything else that may leave oil on a UHV component.

Installation-Materials Selection Materials for use in UHV need to have a low rate of outgassing.

Installation-Materials Selection Materials for use in UHV need to have a low rate of outgassing.

Installation-Materials Selection Materials for use in UHV need to have a low rate of outgassing.

Installation-Conflat Flanges

Installation- Take Care of the Instrument! Take extra care when handling fragile components! Knife Edges Bellows Feedthroughs Wobblestick! Small parts including such as sputter gun components.

Outline Installation Pumping Down Bakeouts Experiments Venting

Pumping Down Procedure is slightly different for each instrument. It is important to follow procedure to avoid damaging pumps, valves, or other equipment on instrument. Generally pumping down involves turning on pumps and opening valves in correct order. Rotary pump brings you to rough vacuum. Monitor this stage with a pirani gauge. Turbo Pump Brings you to High Vacuum Regime (Pre-Bake) Monitor the pump down from the high vacuum regime with an ion gauge

Pumping Down-Gas Loads

Pumping Down-Curve

Leak Testing- Rate of Rise Shut vacuum chamber off from all pumps and monitor the rise in pressure. Helps to identify if a leak is present.

Leak Testing- Residual Gas Analyzer (RGA) Turbo pumped chamber not baked. Turbo pumped with a leak.

Contaminants- RGA Chamber contaminated by hydrocarbons.

Leak Testing- Methanol Leak Test Useful for detecting large leaks (Pressure isn’t going below 1 X 10-6 mbar). Squirt methanol onto suspect flanges. If there is a large leak methanol will be sucked into the chamber and the pressure will increase.

Leak Testing- He Leak Test Can detect much smaller leaks. Spray helium gas onto suspect flanges (helium is lighter than air, start high end low). Using an RGA monitor mass 4. When a flange with a leak is exposed to the gas the RGA signal will increase. Often RGAs have a leak detection mode with audio cues.

Test Equipment after Pump Down Before baking it is best to make sure everything you installed or was previously on the instrument is working/still working. Not everything can be fully tested before a bake, but it is best to test anything that can be. Sputter gun! Sample heaters, thermocouples Mass Specs Electrical connections on TSP, EFMS, ect.

Outline Installation Pumping Down Bakeouts Experiments Venting

Bakeout Eventually you can reach UHV by pumping overtime with a turbo pump, but baking significantly speeds up the process.

To Prepare for a Bakeout Remove all non-bakeable items from the chamber Plastics Electronics Magnets Sample tubes Anything on the instrument table Blow out any water lines Pump behind leak valves Wrap any fragile components in foil. This will allow these parts to heat up more gradually and not undergo as much strain from heating. Windex the chamber Attach heaters and thermocouples to the chamber Have someone else check your work!

During a bakeout Ensure you have performed all steps on the previous slide including having someone else check your work! Cover the chamber using the appropriate bakeout apparatus. Turn on heaters. Closely monitor temperature and pressure. Too high of a temperature can damage components (we typically do not go above 120 °C) and if they pressure is too high this may indicate a leak that was missed. Pressure should initially increase as species are outgassed and then decrease as bake continues. Bake at least 36 hours or until pressure decrease levels off.

Post Bakeout Ensure heaters are turned off and remove bakeout apparatus. Replace non-bakeable components Test all components post bakeout. Your pressure may still not be below 10-9 , but that’s ok. You still need to Degas any filaments or relevant components (MS, EFMs, IG, TSPs, ect). Filaments tend to adsorb gases very strongly and need to be locally heated to temperatures higher than that achieved in a bakeout. Start using additional pumps post bake to further improve the pressure (TSPs, Ion Pumps, Cryopumping).

Post Bakeout-RGA

Outline Installation Pumping Down Bakeouts Experiments Venting

Performing Experiments- Safety Be safe! First and foremost for yourself and also for the chamber. Wear gloves, eye protection when handling chemicals including cryogens. Be mindful of high voltage components Take appropriate pre-cautions when handling hazardous gases (CO, H2 especially). Treat components of the UHV system with care especially fragile ones. (Manipulators, any moving parts especially wobblesticks!, feedthroughs, bellows, scanners in STMS!, Mass Specs, XPS, basically any expensive component ect.) Always keep an eye on the chamber pressure. In the STM chambers be mindful of when you should be using the ion pumps or the turbo pump. Do not attempt any maintenance when the system is at cyrogenic temperatures. Do not flash the TSPs when the chamber is at crygogenic temperatures. In TPD chambers especially flashing TSPs at the end or beginning of the day can help to keep your pressures low. In general think and come up with a plan before you do something to ensure you won’t hurt yourself or break something in the chamber!

Performing Experiments-Records While you are performing experiments you should be updating the lab notebook as you work. The notebook should at least be updated when you finish with the instrument for the day. Do not take the notebooks out of the building. Make copies if you need to look at your notes at home. Make sure to save your data as you work. Data should be backed up frequently on the N:Drive in the folder for the appropriate instrument in the Data folder.

Typical Procedure for UHV Experiments Clean sample with Ar+ sputtering. This removes gases adsorbed from the background or contaminants from previous experiments. Make any modifications to the sample if applicable (metal deposition, form an oxide ect.) Dose molecule of interest if applicable. Perform measurement (TPD, STM, XPS, IR, ect). If the sample is unchanged by the molecule or measurement continue to perform doses and measurements. Otherwise repeat from the beginning.

How do Power Outages Affect Experiments? The TPD 1 and 2 are on Uninterrupted Power Supplies (UPSs) which are further plugged into the backup generator. If power is lost to your chamber each instrument has a procedure for safely pumping the instrument back down. It is important to follow the appropriate sequence of events and not allow a pump or valve to open too early. Be wary of potential pressure differentials when reopening valves and turning on pumps. If there is a planned power outage it is often better to shut down the equipment in a controlled manner rather than let the power trip everything off.

Outline Installation Pumping Down Bakeouts Experiments Venting

Venting While a vacuum chamber usually becomes unavoidable at some point, it should not be done without good reason. It is very easy for equipment to break during vents and the subsequent pump downs and bakeouts. Venting is often necessary when a require component stops working (ie sputter gun, thermocouples on TPD, ect). Venting is sometimes necessary to install new components. Vents can sometimes be avoided by over pressurizing with Ar. Think about experiments you can do without the broken or new component before venting. For example if your EFM for metal evaporation stops working are there experiments you can do on the pure crystal surface before venting? Vents can sometimes be planned around planned power outages.

Venting-Procedure Again, this is different from instrument to instrument but the following general procedure can be applied to each instrument. Turn off all components that should not be exposed to high pressures such as ion gauges. Seal the chamber off from all pumps using valves or by shutting off ion pumps. Shut down remaining pumps in a controlled manner. For example shut off the turbo pump in the TPDs before turning off the backing rotary. Vent any backing lines to air. There is a vent valve somewhere on each chamber. Attach plastic tubing to this valve and insert it into a dewar filled with LN2. Slowly open the vent valve to vent the chamber to N2 gas. This limits the exposure of the chamber to air. 6. Once the chamber and backing line is vented you can begin to perform maintainance/ install new components.