Magnet activities in SPS during EYETS

Slides:



Advertisements
Similar presentations
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Advertisements

New HV test specification for the LHC N. Catalan for the EI section.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
1 Feedback on Warm Magnet Activities during LS1 J.Bauche, on behalf of the TE/MSC/MNC section With contributions from: P. Catherine, M. Dumas, P. Fessia,
LIU-SPS, 29 April 2015 Paul Cruikshank1. Variants today: Starting point: Assume same boundary conditions as 15/4/2015 presentation Analysis is for SPS.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
LIU-SPS, 15 April 2015 Paul Cruikshank1. In the beginning…. First slide that Brennan gave me – everything decided ! LIU-SPS, 15 April 2015 Paul Cruikshank2.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
IEFC Workshop 9 th March 2012 – Magnet activities in IEF during LS1 – J. Bauche 1 Magnet activities during LS1 J.Bauche, on behalf of the TE/MSC/MNC section.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
ATOP 4 March Status and Prospects of SPS Magnet Consolidation Program – J. Bauche 1 SPS Beam Lines In the Way to the LHC Status and Prospects of.
LSC 19 th April 2013 – SPS Magnet Test Campaign and Consequences for LS1 1 SPS Magnet Test Campaign and Consequences for LS1 J. Bauche*, P. Catherine,
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
Insertion of 2 MBB with new coated vacuum chambers during technical stop week 35 J. Bauche for the SPSU study group, 24 June 2010.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Mikhail Ovsienko TE-MPE-EE
Report Technical Director Storage-Ring-Installation Completed
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Report Technical Director Storage-Ring-Installation Completed
YETS & LS2 Works EN-EL / Power distribution
SPS Winter stop Planning meeting (N06) 05/01/2011
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
TE-MSC activities in SPS during LS2
ELENA installation and commissioning status
Injector De-cabling Project
K. Foraz on behalf of OSS members
TE-MPE LS1 review Vision from EN-EL(CF)
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
the high-voltage network of CERN ToMORROW
TE-ABT Activities for LS2
Arc magnet designs Attilio Milanese 13 Oct. 2016
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
the CERN Electrical network protection system
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Magnet electrical and hydraulic (dis)connections for coating
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Experimental Areas – LS2 planning
Beam Line to the HiRadMat Test Facility
Brief report of the hardware commissioning activities
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Hardware Commissioning
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

Magnet activities in SPS during EYETS 2016-2017 J. Bauche, on behalf of the SPS Magnet Team SPS Tech. Coord. meeting, 2016-10-26

Before Christmas break Inspection “Magnet Patrol” (IMPACT 84646) Main magnets and transfer line quadrupoles Removal of the magnet covers Audio-visual inspection in pulsed mode Machine conditions Machine closed to non-MNC personnel during tests Power, cooling, interlocks, access, and controls operational Access system in «Magnet Patrol» mode Support from other groups BE/OP to power the magnets and lock the accesses All other teams ready to intervene in case of system/service failure (EPC, EL, MPE, ICS, CV, etc…) Already scheduled in SPS planning: 12/12 (covers) and 13-14/12 (tests). Transfer line quadrupoles possibly on 14/12 PM

Before Christmas break High voltage tests (IMPACT 84646) To detect weaknesses in main magnet circuits insulation Main dipoles and quadrupoles (962 units) Busbars and water cooled cables are tested together with the magnets! Machine conditions Machine closed, in dedicated configuration (CIS system of EPC) Cooling circuits running Separation of power converters from load Test +/- 6kV on dipole and +/- 4 kV on quadrupole circuits, from BA3 In case of failure, localization in the machine, repair, and re-test Support from other groups TE/EPC for the test, BE/OP to lock the accesses (machine closed) Already scheduled in SPS planning: 14/12

Preventive/corrective exchange of main magnets After Christmas break Preventive/corrective exchange of main magnets (IMPACT 84647) Expected 10 to 15 main magnets to be replaced Based on audio-visual inspection and HV test results Coil movements on quadrupoles and dipoles Water leaks Any other issue detected until end of run 2016 (already XXX) Machine conditions Free access to material lift and passage for transport equipment Demin. water circuits purged Support from other groups EN/HE, TE/VSC, BE/ABP/SU Main magnet replacement

Before and After Christmas break Removal/reinstallation of magnets for LIU (IMPACT 84647) Magnets removed from machine for aC coating and Impedance reduction program Program managed by VSC - 2 QD + 2 SSS girders (close to QD magnets) in half-cells 507 and 509; - 9 SSS girders (close to QF magnets) in half-cells 420, 422, 424, 426, 428, 430, 432, 434, 500. Machine conditions Free access to material lift and passage for transport equipment Support from other groups EN/HE, TE/VSC, BE/ABP DS LSS ARC BA4 BA5 existing aC SSS QF works MBB works Drift tube works 9 SSS QF to transport 2 SSS QD to transport 2 QD to transport Courtesy P. Cruikshank

Magnet general maintenance After Christmas break Magnet general maintenance (IMPACT 85482) Corrective / preventive maintenance Main dipole pole shim inspection and repair Busbar system inspection, cleaning of salpeter under covers Minor activities on auxiliary magnets Machine conditions No special request, activities transparent for other teams Support from other groups None Radiation protection For any activity potentially generating significant dose, a specific IMPACT (+ WDP if needed) will be set-up, e.g. for the glitch hunt in 120 Broken pole shim

Many thanks in advance for your support!