CPI Event / Project Tollgate Template

Slides:



Advertisements
Similar presentations
Six Sigma Green Belt Tools and Applications (3 Days Workshop) Prepared for: In-house Training
Advertisements

Project leaders will keep track of team progress using an A3 Report.
Ledger Size DEFINE / BACKGROUND INFORMATION Problem Statement: Goal OR Objective: Scope (if needed):  Problem Statement  Project Scope  Goal Target.
Project Storyboard Template
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
Lean Six Sigma Black Belt Blended Learning Program Course Description Blended Learning FLEXIBLE: Class sessions can be 100% online or augmented with live.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
1 Project Name Team Lead Location Month XX, Year.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
Project Title Team Leadname Team MembersMember names Process Ownername Championname Insert your company logo here.
 Name  Work experience  Background in continuous improvement activities  Expectations 1.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Green Belt Blended Learning Program Course Description Blended Learning FLEXIBLE: Class sessions can be 100% online or augmented with live.
Project Title GB or BB name: XYZ.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
8.1 Plan Quality Management
Continuous Improvement Project (A Guideline For Sponsors)
TM 720: Statistical Process Control DMAIC Problem Solving

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Put name of kaizen event here
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Continuous Improvement Projects
Document Development Cycle
Template for Science Fair Presentations
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
Preparing a Logic Model and Gantt Chart:
EPICS Design Review Template Notes:
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
CH 12: Healing Pathway Analysis
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
EPICS Conceptual Review Template Notes:
Lean Six Sigma DMAIC Improvement Story
Framework for Success: DMAIC
Certification Project Template
What is Project Quality Management?
Analyze Fishbone Diagram
Explanation to Participants about this template and final presentation
Project Title Date Location of Kaizen Author.
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Template for Science Fair Presentations
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
DMAIC STANDARD WORK TEMPLATE
by Operational Excellence Consulting LLC
Site (e.g., LARC Embakasi)
Site (e.g., LARC Embakasi)
Time Scheduling and Project management
Validation by Process Owner Validation by Project Leader
Project Kick-off <Customer Name> <Project Name>
CPI Event / Project Tollgate Template
Program Kick-off Program Name Purpose of Program Kick off
Site (e.g., LARC Embakasi)
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

CPI Event / Project Tollgate Template Template is to provide a starting point for new CPI practitioners. Final Out Briefs should include all DMAIC phases. Use background / format according to your command’s standards. Tollgates / Out Briefs will be viewed by others outside your command. Tell the whole story to ensure those unfamiliar with your event / project can easily understand. Keep presentations within reasonable time frame. Recommend no more than 1 hour for final brief. Allow time for questions.

[Phase] Tollgate/Final Brief Template [Enter Command (ex. MCINCR-MCBQ P&I)] [Project Name] [Briefing Date]

Agenda Analyze Phase Data Analysis Root Cause Analysis Findings Other Tools/Topics Improve Phase List of Improvements Future State Map Improvement Data Control Phase Control Plan Follow on actions Overview Define Phase Charter Other Tools/Topics Measure Phase Data/VOC Current State Map Required Items

Overview Use this section to discuss the following: Background – review initial reason(s) behind problem Task – review initial tasking Business Impact – describe impact if problem is not remedied Team Members – identify team members and roles Terms & Definitions – identify uncommon terms

Define Phase – [Tool/Topic] Include significant tools used, such as: Charter SIPOC – list out suppliers, inputs, process, outputs and customers. Communication Plan – identify key stakeholders and how project status is conveyed. Voice of the Customer – review how customers view the process. Etc. Most Define tools can be shown in bullet or tabular form.

Define Phase - Charter Include Major Aspects of Charter Problem Statement – what is the problem? Goal Statement – how will the process operate after the event / project? Scope Statements (In & Out) – what was and wasn’t addressed in the event / project? Timeline & Milestones - review objectives, actions and milestones. Charter items can be displayed in multiple ways Bullet Style Quad Chart PDF Version of Signed Charter

Measure Phase – [Tool/Topic] Include significant tools used, such as: Current State Map Data Collection Plan Statistical Sampling Plan Measurement System Analysis (MSA) Spaghetti / Circle Diagrams Value Analysis (can be included in value stream map) Photos showing area before improvements Etc.

Measure Phase – Current State Map Current state maps can be displayed in multiple ways: Map created during event/project (paper / sticky notes) Map created using software: Excel iGrafx Visio May include value analysis Ensure maps are legible Large maps difficult to read May require separate handout

Analyze Phase – [Tool/Topic] Include significant tools used, such as: Root Cause Analysis Fishbone Diagram 5 Whys Histograms / Pareto Charts Failure Modes and Effects Analysis Statistical Analysis ANOVA, Regression, Hypothesis Tests Process Capability Statistical Process Control / Control Charts Etc.

Analyze Phase – Tips Analyze Phase tips: Simple slides are the best Use common statistical terminology. Don’t put too much info on one slide. One chart per slide. Use limited wording on slide to allow for large charts. Uncommon / complex charts will require additional explanation. May have to review purpose of tool prior to addressing in presentation.

Improve Phase – [Tool/Topic] Include significant tools used, such as: List of Improvements Future State Map 5S Pull System / Kanban Mistake Proofing Streamlined forms Analytical Batch Sizing Total Productive Maintenance Design of Experiments (DOE) Piloting Etc.

Improve Phase - Tips Use visuals if audience is unfamiliar with process / work place. Most improvements aided by pictures 5S: before and after Pull System / Kanban: illustrate process Shop / Office Layout: before and after Mistake Proofing ideas Provide templates / examples for other improvements Streamlined forms (printout if electronic) Kanban Cards Current and Future State Maps (comparison)

Control Phase – [Tool/Topic] Include significant tools used, such as: Control Plan Standard Work Instructions / Standard Operating Procedures Control Charts Statistical Process Controls Replication Feedback / Lessons Learned Etc.

Control Phase – Tips Control Phase topics should include: How will improvements be maintained Who is responsible to maintain improvements Supervisor / Entire Office Creation, maintenance and retrieval of: Work instructions Control charts Metrics Feedback on CPI / DMAIC process Overall satisfaction with event / project

Additional Items – Project Benefits Review benefits of event / project Return on Investment Before and after metrics Just-do-its Reductions in: Space used Time spent Resources allocated Funds spent Items repurposed Identification of additional opportunities

QUESTIONS?