LHC intervention scheduling with the Work Acceptance Tool

Slides:



Advertisements
Similar presentations
“The Honeywell Web-based Corrective Action Solution”
Advertisements

CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
Track, View, Manage and Report on all aspects of the Recruitment Process… with ease!
Business Process Management with Activiti João Silva (CERN, GS-AIS) 21st of October, 2014 BUSINESS PROCESS MANAGEMENT WITH ACTIVITI.
Configuration Management
IMPACT Safety sub-working Group 1 Fernando B. S. Pedrosa IMWG – 07/Oct/2014 EDMS id:
Software Configuration Management
CrackingSiebel.com Utility Siebel Repository Extract (SRE) Tool.
Welcome to the Nebraska SharePoint User Group May 7 th, 2008 Enterprise Content Management (ECM) in SharePoint Corey Erkes.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
ACT – Fourth months later… Prepared by: Martin Gastal Jim Cook 22/03/20111Jim Cook & Martin Gastal.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
Automatically Capturing Data from SCADA to the Maintenance System
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
Engineering Data Management System CERN Drawing Directory overview - Stephan Petit - CERN EST/ISS - LHC Auditorium :00 CERN DRAWING DIRECTORY.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
Sentry’s Implementation and Use of the Supplier Contract Module Presented by: Barry Estes - Director of Procurement and Contracts Blake Barron - Contract.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
TS, Length of YETS EYETS LIU & CONS Project
Workshop 1.4: ESPON Database ESPON Internal Seminar November 2011 Kraków,Poland ESPON M4D Project - LIG (Grenoble Computer Science Lab) Partner Jérôme.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Radiation Protection computing tools Gérald Dumont HSE/RP.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
East Area Renovation Project Team meeting # 2 – EDMS News
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Machine operation and daily maintenance management in SOLEIL
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
TC activities.
DataGrid Quality Assurance
Reliability Analysis & Infor EAM
Equipment simplified model SMR UR safety
ServiceNow Implementation Knowledge Management
What has been learnt from LS1
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
IMPACT Facility Administrators Session
Cryogenic Risk Assessment in LHC
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Managing infrastructure faults to minimize accelerator down time
SharePoint Foundation 2010
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Project Information Management Jiwei Ma
SharePoint Foundation 2010
Case management as logbook for the cryogenic installations at CERN
BOVEX Electronic Bovine Passport Exchange
Powering and Safety day Underground access during powering tests
Using AIM (for Instructors)
Presentation transcript:

LHC intervention scheduling with the Work Acceptance Tool K. Foraz, CERN April 14, 2011 ARW2011, Cape Town, South Africa One of the first images from CMS, showing the debris of particles picked up in the detector's calorimeters

Intervention scheduling Outline Intervention scheduling The game field, the rules and the players First year problematic Solution implemented First results Future 4/14/2011 ARW2011 - K. Foraz

Nb of days of Program. Stops Introduction Nb of days/year Beam ON & set-up = - Nb of days of Program. Stops - Nb of days for recovery - Nb of days for Beam set-up - Nb of days of Failure 365 days What has been done / not during Stops Optimize programmed stops in order to ensure long and reliable operation 4/14/2011 ARW2011 - K. Foraz

The game field Machine: 27km circumference Underground (up to 100m) 8 sectors and associated service areas 1 2 3 6 5 4 7 8 4/14/2011 ARW2011 - K. Foraz

The game rules LHC has a cycle of ~ 4 years Operation years: ~ 3 years of operation ~ 1 year of Long Shut-down to consolidate, upgrade and perform full maintenance of the different systems. Operation years: Find the best compromise between maintenance and beam ON time windows Xmas break of 11 weeks 6 Technical Stops of 4 days J M F A S O N D 4/14/2011 ARW2011 - K. Foraz

The players LHC Machine Committee (the referee) Coordination teams Program. Stops Coord. Tech. Infrastr. Operation Com. Operation Safety Coordination Groups LMC Cryo EL … CV BI RF Mag. Conv. Coll. QPS PSC OP SC TIOC 4/14/2011 ARW2011 - K. Foraz

First year problematic 1. Maintenance plan (CMMS, excel..) 2. Request (mail, SharePoint..) 4. Safety procedures 6. Request access Groups Just the beginning of the process 3. Approval in TIOC meetings TIOC OP 7. Accept & grant access Stops Coordination Safety Coordination 3. Approval (if needed through LMC) Prepare logistics Schedule 5. Approval (fire permits, DIMR…) 4/14/2011 ARW2011 - K. Foraz

First year problematic Information partially shared The risk that authorizations were not given by the adequate coordination team was high Cross-check between coordination teams was time consuming Multiple edition of the same information The effort of groups to announce & edit information to the different coordination teams and different systems was heavy Access time Average of 20 minutes/person (guessing you have only one door to access your worksite !!) ~ 500 persons wanting to access - 2 operators granting access 4/14/2011 ARW2011 - K. Foraz

Solution implemented: WAT ! Work Acceptance Tool A gentle start One database grouping all the interventions Approval process through the existing Electronic Document Handling linked to the Access control system DB 4/14/2011 ARW2011 - K. Foraz

Workflow For any intervention in the machine Requests must be Technically approved Scheduled Prepared from a safety point of view Personnel must be habilitated Technical approval Schedule Safety Execution Close 4/14/2011 ARW2011 - K. Foraz

Workflow 1. Groups submit a request What Who Type of intervention System Who Responsible Participants Number of teams Number of participants/area 4/14/2011 ARW2011 - K. Foraz

Workflow When Locations Safety Constraints Duration Period Risks associated with the activity Lock-out needed 4/14/2011 ARW2011 - K. Foraz

Workflow 2. Technical approval 3. Schedule If needed through LHC Machine Committee Infrastructure: discussed in TIOC (Tech. Infrastr. Operation Committee) Machine: discussed during preparation meetings with operation group Layout database modified if needed through ECR (configuration management) 3. Schedule Work Acceptance Tool is providing a Gantt view List import & export  Schedule 4/14/2011 ARW2011 - K. Foraz

Workflow 4. Safety 5. Execution 6. Close Safety forms automatically prepared, send to the Safety database and the link is kept (Fire Permit, DIMR..). Approval status send back to WAT 5. Execution (RP survey prior to access) Link with access database: only persons who have an authorized activity in a specific location and at a certain time can access Form for comments 6. Close List, filters…to retrieve activities, make statistics 4/14/2011 ARW2011 - K. Foraz

WAT: Integration with existing systems ADAMS Access Control (person/place/time) Safety forms EDH EDH WAT Layout Database Notifications Signatures LHC Locations Access Points Excel Foundation Schedule Export, Bulk Update (Upload) Persons, Organic Units 4/14/2011 ARW2011 - K. Foraz

Increase productivity First results WAT in operation since December 2010 Only fully authorized activities can be performed Access time: 15minutes gained/access & no operators needed List of interventions available for operation Start to build up the history of interventions Feed-back is very good Efficient, eases access, gives overview of what’s going on at a location/for a group/ for a system… Better control & Increase productivity 4/14/2011 ARW2011 - K. Foraz

WAT next Within WAT project Link activities to equipment rather than locations Accurate picture of the equipment history Accurate picture given to Operation after a stop Link WAT with Computer Maintenance Management System LHC Equipment LHC Locations Access Points WAT Layout Database 4/14/2011 ARW2011 - K. Foraz

Intervention Management Working Group set-up WAT next - IMWG Moreover, same equipment groups are also intervening in the LHC experiments, as well as in injectors Intervention Management Working Group set-up Goal: One single database of intervention data Create a unique repository for interventions One workflow engine Standardize practices where possible and desirable A web tool to input work declarations to plan, schedule, prepare and coordinate all activities, anywhere 4/14/2011 ARW2011 - K. Foraz

Thank you Questions, comments, suggestions ? 4/14/2011 ARW2011 - K. Foraz