The cost of nuclear power plants l

Slides:



Advertisements
Similar presentations
The University of Greenwich Teaching excellence for 100 years The Economics of Nuclear Power Myths of nuclear power: A guide Moscow 5 April 2011 Steve.
Advertisements

UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Acumen7 1 Accelerating UK Nuclear New Build Tony Roulstone July 2006.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
UK Nuclear Policy Andrew Beirne
© OECD/IEA POWER SECTOR OUTLOOK IN OECD COUNTRIES 28 May 2010 Roundtable: Russian Federal Tariff Service Ian Cronshaw, Head, Energy Diversification.
What is killing the Nuclear Renaissance? Presentation at 10th IAEE European Conference Vienna, September 7-10, 2009 Steve Thomas
Arguments Against Nuclear Power Development in Iran May, 2003.
“NUCLEAR POWER IN UTAH: COSTLY, RISKY AND UNNECESSARY” By Matt Pacenza, Policy Director HEAL Utah.
Economic Overview Laurence Sanders. World Economic Growth n Sustained recovery n USA 4.7% n Japan 4.2% n UK 3.7% n Eurozone 2.0% ( second quarter GDP.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
The Nuclear Renaissance Dr. Charles K. Ebinger Director, Energy Security Initiative Brookings.
Nuclear Reactors and Nuclear Energy Conversion of mass-energy to electrical energy mass-energy  thermal  kinetic  electric Produces large amounts of.
NUCLEAR POWER PLANT FINANCING IAEA - Infrastructure Technical Meeting Vienna, November 2007 Fanny Bazile Forecast Director Nuclear Energy Division.
Investment opportunities in the worldwide gold and uranium equity markets Marino G. Pieterse, publisher and editor March 5 – 6, 2013.
The University of Greenwich Teaching excellence for 100 years A comparison of the Hinkley Point and Paks projects March 2015 Steve Thomas
Why consider other Energy options for SingaporeWhy consider other Energy options for Singapore? In electricity tariffs in Singapore went up by 21.
The University of Greenwich Teaching excellence for 100 years Is new nuclear build justified? Press Conference on the need for an Independent Inquiry March.
Steven Biegalski, Ph.D., P.E. Director, Nuclear Engineering Teaching Laboratory Associate Professor, Mechanical Engineering Dusting off the Atom: Nuclear.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
1 NRC Assistance for Emerging Nuclear Power Programs Jack Ramsey, Senior Level Advisor Office of International Programs March 11, 2009.
Nuclear power: A cheap option? Westminster Keynote Seminar October 19 th 2009, Portcullis House Steve Thomas PSIRU (
Light Metal Packaging Markets in the World to 2018 TELEPHONE: +1 (855)
ENERGY FOR THE 21 ST CENTURY the Potential for Nuclear Power Luis Echávarri Director-General, OECD Nuclear Energy Agency IAEA Scientific Forum at the General.
IFIEC Europe International Federation of Industrial Energy Consumers 1 Promotion of Renewable Energies in the EU Member States Consequences on the Price.
NS4054 Fall Term 2015 Nuclear Rebound?. Overview Oxford Analytica, “Nuclear Industry Will Rebound,” November 13, 2013 Nuclear power seems to be making.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
Nuclear perspective in the EU Nina Commeau-Yannoussis, Adviser to the deputy Director General, European Commission Brussels, July 2d, 2008.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Sussex Energy Group SPRU - Science and Technology Policy Research The Economics of New Nuclear Build Presentation at the Nuclear Consultation Group Westminster.
Substantiative data on the Russian Energy Strategy 2030: expert views on the potential export of energy resources Vladimir Feygin, Vitaly Protasov Institute.
TM/WSP 5-9 Nov Group E4- Improving financing NPP QUESTIONS / DIFFICULTIES  Is it really the case that there has been no project financed nuclear.
Update on the status of the UK nuclear power programme Presentation to INRAG 27 February 2016, Vienna Steve Thomas Professor.
Bed Linen Markets in the World to 2017 Bharat Book Bureau.
Westminster Energy Environment & Transport Forum Nuclear Energy 27 Oct 2010, Princess Alexandra Hall London Dr Paul Dorfman Continuing concerns: safety.
IAEA International Atomic Energy Agency Prospects of Global Nuclear Power Development Ukrainian Nuclear Forum-2012 Andrii Gritsevskyi Planning and Economic.
JN (EIUG) - The Claverton Group, Bath 24 October Jeremy Nicholson Director – Energy Intensive Users Group EIUG The Case for Nuclear Energy.
UCL ENERGY INSTITUTE UK Energy Policy: Late Lessons from Fukushima Westminster, Dr Paul Dorfman.
Nuclear Energy: Good, Bad, or Ugly? By: Russell Dehaut, Courtney Sperger, and Craig Hughes.
Global Energy Problems and Counter Policies and Measures of Korea
Russia for investors: the key points 2016.
Education and Activities in Nuclear-Related Areas in Turkey
Nuclear Proliferation and Arms Control (Part 2)
DDG Nuclear Energy: Mr Zizamele Mbambo
Sustainability-oriented EU Taxes: A European Nuclear Power Tax
British Nuclear Power Policy 2016 Does it actually exist?
Nuclear Power and Economic Growth
State of Nuclear Power Helsinki, 8 May 2009.
Lauri Myllyvirta energy campaigner (Finland)
János Krutzler Hungarian Atomic Energy Authority
Energy Security in the Asia-Pacific
Economic Growth to Remain Uneven Around the World in 2017
New build and new countries
NS4960 Spring Term 2018 Nuclear Rebound?
Nuclear Power – Energy for the Future
Power Sector Reform in Asia
Evolution of nuclear power plant vendor offerings
Natural Gas World Market Is Coming Of Age?
Power Sector Reform in Asia
Is nuclear so expensive because the environmentalists have been making so much trouble? WISE 40 jaar: Feestelijk Congres Amsterdam November 16, 2018 Steve.
Generation Expansion Daniel Kirschen
Fundamental Questions
Time to cancel Hinkley Point C
Group E1 - Improving financing NPP QUESTIONS / DIFFICULTIES
Renewable energies in Russia
Vogtle.
NS4960 Spring Term 2018 China: Nuclear Expansion Issues
Anni Podimata, Vice President ITRE
London Business School and City University, London
Making Britain Great Again
Presentation transcript:

The cost of nuclear power plants l The cost of nuclear power plants l? Presentation at the European Parliament event on Paks NPP June 23 8:150-11:00 Steve Thomas (stephen.thomas@gre.ac.uk) Emeritus Professor of Energy Policy PSIRU (www.psiru.org), Business School University of Greenwich

Current status 444 reactors in service, 157 retired, 64 under construction Average age of operating reactors in 2015 was 29 years More than half under construction in China (22), Russia (8), India (6) Others in US (5), UAE (4), Korea (3), 2 in of Japan, Slovakia, Taiwan, Ukraine, Belarus, Pakistan, 1 in Brazil, Finland, Argentina, France 10 under construction for 10-43 years (Finland (11 years), India (12-14 years), US (43 years), Slovakia (30 years), Ukraine (30 years), Taiwan(17 years) 5 with work suspended & unlikely to restart (Russia (1), Japan (2), Taiwan(2)) 3 small reactors (<35MW)

Nuclear construction costs Several different sources of construction cost estimates Generic forecasts by international agencies, governments, consultants, academics, reactor vendors etc. These have almost invariably been a significant underestimate of actual costs Project specific cost estimates before construction starts. Vast majority prove to be underestimates Outturn costs. These have historically been the best predictor of future costs Most countries do not publish reliable outturn costs. Most reliable costs come from USA & France. In cases where the company must report the costs, useful data is available, eg Olkiluoto & Sizewell No reliable data from China, Russia, India For comparison purposes, prices should be ‘overnight’, excluding interest during construction. Interest during construction could add 50% to the overnight cost

Generation III+ designs Promises for Gen III+ designs, especially construction cost of $1000/kW resulted in US & UK nuclear power programmes 3 or 4 Gen III+ designs under construction, none in commercial service yet: Toshiba AP1000, Areva EPR, Rosatom AES-2006 & CGN/CNNC HPR-1000? Not clear if HPR-1000 meets European/US standards. 3 units under construction in China but for less than a year Cost data from earlier design generations not relevant: core-catchers & air-craft protection add significantly

Gen III+ experience EPR: Flamanville (Fr) & Olkiluoto (Fi) about 3X over-budget & 6-9 years late, Taishan (Ch) 3 years late. Not clear if reactor vessels for Flamanville & Taishan strong enough to allow operation Latest Hinkley estimate ~$8000/kW, Flamanville/Olkiluoto ~$6500/kW AP1000: Summer (US) 3-4 years late, 35% overbudget, Vogtle (US) 3 years late, 35% overbudget, Sanmen & Haiyang (Ch) 3-4 years late, ~20% overbudget 2014 Latest Summer estimate ~$6500/kW, Vogtle ~$7300/kW AES-2006: Novovoronezh (Ru) 4-5 years late, Leningrad (Ru) 4 years late, Ostravets (Bel) on time but 70% overbudget How can IEA say: ‘Improvements in nuclear construction times are now making climate goals more achievable than previously thought’?

What is needed to finance a nuclear power plant Two risks of concern to financiers: technology risk – plant more expensive to build and/or run than expected; market risk – income from power sales less than expected Turnkey (fixed price) contracts are not available or not credible so vendors will not (cannot) take the technology risk Apparently cast iron guarantees electricity consumers will pay all costs incurred covers market & technology risk. This applied for Vogtle & Summer but cost overruns are straining this promise Technology risk: Sovereign loan guarantees to cover the borrowing. Taxpayers are bearing the risk Market risk: Long-term contract to buy the power at a pre-determined, non- market price Predictable terms for the cost of decommissioning and waste disposal

AES-2006 From 2009, Russian efforts directed at export markets offering package of equipment, construction, finance, fuel services & training By 2015, 25 export orders claimed for AES-2006 & 8 for older designs on which work had yet to start AES-2006: India (10), Turkey (4), Bangladesh (2), Vietnam (2), Finland (1), Hungary (2), Egypt (4) AES-91/92: India (4), Iran (2), Jordan (2) Projects going slower than forecast. Turkey order agreed 2010 when construction expected to start 2011. 2016, construction not expected to start before 2017

AES-2006 To meet this order book, Russia will need to supply about 5 reactors per year. Most are dependent on Russia providing the finance. Does Russia have the finance & the supply chain to do this? From 1986-2007 Russia started building 4 reactors, from 2007-2016, it started 10, average 1 per year. Can it increase its supply chain capacity 5-fold? The collapse of the oil price and international sanctions have halved the value of the Rouble & severely depleted its financial reserves What risks are customers bearing? Bulgaria paid €550m to cancel Belene, Belarus seems to be bearing the $8bn extra costs because of the fall in value of the Rouble. Dates to repay the loans are fixed whether or not the plants are complete

China China did not start building reactors in large numbers till 2007. From 2007-11 it started building about 8 reactors per year for China. There was a pause till 2015 following Fukushima, when 6 reactors started construction Most of these reactors used a very old design licensed from Areva 6 modern design reactors imported to be indigenised but found to be too expensive so indigenous designs being developed Hualong One (1180MW) developed by CNNC and CGN. Construction start in China in May 2015. CAP1400 developed by SPI but no orders Competing in S Africa, Turkey, Argentina & Romania. Early plans to export to UK Negligible experience outside China, serious concerns about Quality Control & regulatory rigour

Conclusions World market for reactors weak & largely confined to developing countries New generation of designs have failed to meet price promises Areva & Toshiba are in severe difficulties & struggling to survive Russia & China have high ambitions & promise low costs, cheap finance. Promises are unproven & designs not reviewed by experienced, transparent regulators