Workshop Topics and Deliverables

Slides:



Advertisements
Similar presentations
Mark W. Earley, P.E. Chief Electrical Engineer.  Also known as the NEC ® or ANSI/NFPA 70  There are two electrical codes that govern electrical installation.
Advertisements

Power Systems Large Scale and Micro-Grid 7/16/2014 NREL - Golden Colorado.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Safety W. R. Casey NSLS-II ESH Manager CFAC 5/8/08.
1 Normalisation Wim De Kesel Codes and standards Challenges General overview.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
Proposed Revision to ORPS Criteria for Hazardous Electrical Energy Mike Hicks, DOE, Idaho Lloyd Gordon, LANL November 3, 2009.
Mark Scott, ESP Manager RSC Meeting May 9 th, 2013 ES&H Manual Lockout/Tagout Program 2013 Draft Revision.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Welcome to the SEED Collaborative Workshop for Facilitators Kuala Lumpur March 13, 2006.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Welcome to the SEED Briefing for Volunteers Khafji, Saudi Arabia April 22, 2006 Tom Lough.
Responsible Care® Health & Safety Task Force – 06 H&S.
Welcome to the SEED Facilitator Workshop Tyumen, Siberia, Russia October 7-8, 2006 Tom Lough and Svetlana Belova.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Battelle Energy Alliance, LLC Working Group Chair January 26, 2016.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Date and page number - 1 Safety Management at the NNSA Service Center (Albuquerque) Dennis Curtis Complex Support Department Occupational Safety and Health.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
DC Systems Working Group EFCOG ESTG Fermi National Laboratory July 18-22, 2016.
Updates on Code Revisions
DC Systems Working Group
Best Practices in Performing DSA Legacy Reviews
EFCOG Hazardous Energy Control Working Group
EFCOG Working Group #3 Safe Conduct of Subcontracted Electrical Work and 851 Compliance Best Practices POC - Jeff Williams Content Slide Notes “UNCLASSIFIED”
CUCSA Workgroup Chair Orientation
EFCOG Hazardous Energy Control Working Group
Electrical Safety Evolution in DOE Past, Present and Future
Dina Siegel, IHSTTT Chair Los Alamos National Laboratory May 23, 2016
DOE-EFCOG ISM & QA Fall 2016 Strategic Planning & Direction
QUALITY IMPROVEMENT [SECOND]/[THIRD] QUARTERLY COLLABORATIVE WORKSHOP
Working Group 2017 EFCOG Annual Meeting
DOE Electrical Safety Handbook
Performance Management Cycle
FAA MMAC Electrical Safety Program Implementation & Culture Change
Module MPE02 Radiation biology for medical physicists in radiology
Natural Gas is Moving Forward
RST processes Session 5 Presentation 2.
Chapter 11 Requirements Workshops
Executive Committee June 13, 2012
Bryan Adams High School
Developing a Comprehensive Electrical Program
2016 EFCOG Electrical Safety Workshop Plenary Sessions
Accelerator Safety Workshop SLAC
GUIDANCE ON PLANNING PROCESS GUIDANCE ON PLANNING PROCESS
Session Law Water Quality Permitting for Composters
2018 EFCOG Safeguards & Security Working Group Annual Meeting
Workshop Topics and Deliverables July 2015, LLNL
Stephen Porter Safeguards & Security Working Group
<month year> doc.: IEEE < e> <May 2011>
DOE Electrical Safety Handbook
Speaker’s Name, SAP Month 00, 2017
Roger Marks (Huawei) capable 16 September 2019
Presentation transcript:

Workshop Topics and Deliverables Lloyd Gordon - Workshop Chair Los Alamos National Laboratory July 19, 2016

Topics Overall workshop goals Working Groups Workshop Logistics Deliverables Presentations Guidance for Workshop Leads

Overall Workshop Goals Share methods and successes in electrical safety across the complex.

Working Groups 1 DC Systems 2 Hazardous Energy Control 3 10CRF851 Flowdown, and Subcontractors 4 DOE Electrical Safety Handbook 5 Risk Assessment per 70E-2015 The following Topics and proposed deliverables are meant to stimulate ideas. They are not meant to be fixed or limiting.

Working Group 1 DC Systems Leads Gary Dreifuerst, ex LLNL Stan Berry, ex Navy Alan Tatum, current ORNL Peter McNutt, NREL

Working Group 1 DC Systems Leads – Gary Dreifuerst, Stan Berry, et. al. Description – This working group continues efforts from last year to quantify the degree of hazard posed by DC sources, especially where it differs from AC system hazards, and safe work procedures for DC systems, such as battery and photovoltaic systems, where de-energization methods are not obvious or practical. It provides input to standards-making bodies where justified Proposed Deliverable – Open

Working Group 2 Hazardous Energy Control Stephanie Collins, LBNL Eric Stromberg, LANL Etc.

2016 ESW HEC Goals and Priorities – Break into 4 Groups Finalize format of the LOTO Cross-walk and begin work on generic LOTO program (with draft program completed NLT end of 2016) Determine 2017 ES Month topic and assign folks to work on it (with draft completed end of January 2017) Look Alike Equipment Best Practice Proposal ARMS/ERMS (Arc Reduction Maintenance Switch)/(Energy Reduction Maintenance Switch) control

HEC WG Schedule Tuesday Afternoon Wednesday Break into 4 groups and get to work LOTO 2017 Electrical Safety Month Look Alike Equipment ARMS/ERMS Control Generate products for HEC Working Group review Finalized LOTO crosswalk format; Generic program template ES Month Topic Look Alike Equipment draft BPP ARMS/ERMS Control draft BPP

HEC WG Schedule (continued) Thursday Morning Thursday Afternoon Finish up working on products for this Workshop Identify continuing work and assign members & get commitment for completion Present HEC Working Group Progress

Working Group 3 Electrical Safety Subcontractors and 10CFR851 Flowdown Jeff Williams, NNSA, Los Alamos etc.

Working Group 3 10CF851 Flowdown and Subcontractors Lead: Jeff Williams, et.al. Description – This working group continues efforts from last year to improve flow-down of electrical safety requirements found in 10 CFR 851 and other contractual requirements to general and electrical contractors working for the DOE site contractors. Proposed Deliverable – Open

Working Group 4 DOE Electrical Safety Handbook Lloyd Gordon, LANL Mike Hicks, Idaho DOE

Working Group 4 DOE Electrical Safety Handbook Leads – Lloyd Gordon, Mike Hicks Description – This working group will renew efforts to keep the DOE Electrical Safety Handbook consistent with the most recent standards and incorporate appropriate measures gleaned from best practices and lessons learned. Proposed Best Practice – A summary comparison of site electrical AHJs and their processes, and how site AHJs can work together to achieve common goals.

Working Group 5 Risk Assessment Tommy Martinez, LANL etc.

Working Group 5 Risk Assessment Leads – Tommy Martinez, et.al. Description – This new working group will discuss implementation of the 2015 NFPA 70E, focusing on electrical system operations and minimum inspection, testing, and maintenance of overcurrent protective devices to assist in assigning arc flash controls. A consensus product is needed to establish thresholds for making risk based determinations. It provides input to standards- making bodies where justified . Proposed Best Practice – Open

Workshop Working Sessions The workshops are working sessions everyone is expected to participate. Share issues/concerns you may have at your site. Distribute members from your organizations among the groups Have your deliverables ready to present on Thursday at 2:00 pm, 30 minutes each group

2016 Workshop Guidance EVERYONE must sign in, in their working group Participants will break out into 5 working groups Groups may break into subgroups Each group will have 1 or more workshop leaders to assist with the continuity, scope, and direction All participants are encouraged to contribute to a workshop group Participants will remain in the same group End result is to produce usable product(s) and present the product(s) on Thursday afternoon Groups must develop a continuity plan to complete unfinished work In presentation define deliverable(s) and dates

Guide for Workshop Leads Set goals and schedule Determine product Establish subgroups and facilitators Keep groups focused Develop presentation, pick presenter Plan for followup, set deadlines