Status of E-XFEL Module Assembly at Saclay

Slides:



Advertisements
Similar presentations
I XFEL Module Assembly AWLC’14, 14/05/2014 O. Napoly, CEA.
Advertisements

O. Napoly, C. Madec CEA-Saclay, Irfu/SACM
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
O. Napoly, ILC Industrial Forum, IPAC May Status of XFEL Module Assembly at Saclay O. Napoly, CEA-Saclay, IRFU/SACM.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Third SPL Collaboration Meeting – CERN - 11 November 2009S. Chel 1 XFEL: cryomodule assembly at CEA/Saclay XFEL facility & Superconducting linac Main assembly.
J. Osborne LHeC Linac Design Issues Frank Zimmermann 10 December 2010.
Visit to Saclay – XFEL Village
Status of SCRF Accelerator Activities at CEA-Saclay
Status of the M-ECCTD F. Peauger - P. Bosland
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Complementary ISTC Projects #3888, 3889p
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
X-FEL linear accelerator
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Accelerator Module Test Facility
2. SCRF General Preparation for the AD&I Preparation for AAP Review
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
IHEP Cryomodule Status
Nick Walker (DESY) EU GDE Meeting Oxford
Olivier Napoly, coordinator CEA/Irfu
Advanced Research Electron Accelerator Laboratory
Saclay Test Facilities
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
XFEL cryomodule production and Reliability improvement
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Status of E-XFEL Module Assembly at Saclay O. Napoly, CEA-Saclay, IRFU/SACM 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Industrialisation of XFEL Cryomodule Assembly European XFEL Layout 30 November2010 Industrialisation of XFEL Cryomodule Assembly 2

Superconducting Linear Accelerator 1+80 cryomodules 8+640 cavities 1.3 GHz / 24.3 MV/m 648 RF couplers 120 kW @ 5 mA 20 RF stations (10 MW) operating at 5,2 MW 1 1 5 18-38 m underground 1 cryogenic sector : 120 W @2K, 204 W @5-8K, 1,4 kW @40-80K 30 November2010 Industrialisation of XFEL Cryomodule Assembly

O. Napoly, EuCARD RF-Tech Worshop, PSI CEA contributes to the XFEL Cold Linac construction through Cavity String Assembly (WP9) and Module Assembly (WP3)  Accelerator Module Assembly of 3+80 accelerator modules with 1 per week throughput ! operated by an industrial contractor on the Saclay site. 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Project Timeline Our effort develops over the 3 phases: Phase 1: Preparation of Infrastructure and Tooling  April 2010 Phase 2: Training and Commissioning of XFEL Village at Saclay with XFEL Prototype Modules (PXFEL2 and PXFEL3) August 2010  end 2011 leading to Restricted Call for Tender for Assembly Contract by Q2-2011 Phase 3: XFEL module assembly by indial. contractor Q1-2012  Q3-2014 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Industrialization Baseline Build the Assembly Tool adapted to the goal of 1 module/week normal mode  7 workstations for 7 week assembly time degraded mode  doubling of most workstations Review assembly procedures to avoid variations and other sources of man errors  long training phase with prototype modules  pre-industrialization phase with pre-series modules  optimize procurement of pre-fabricated parts Implement personnel safety regulations ahead of contract. 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Optimisation Rationale Comply with XFEL project schedule and DESY procedures  limited room for unproven innovation Tailored to Saclay pre-existing hall layout  three buildings around a central courtyard Optimized for cost (manpower) effectiveness  7 (maybe 6) week total assembly time Optimized for assembly fluidity  alternating workstation occupation Adaptive facility towards future projects  maximum module length = 15 m 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Phase 1: Preparation of Infrastructure and Tooling 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Overview of the Assembly Buildings XFel Village Clean rooms 4 Bldg 124 North 25x15 m² 7 6 CourtYard 3 2 Bldg 126 North 40x11 m² Assembly halls 5 1 8 Bldg 126 South 30x17 m² 6b Offices Warehouse ©GoogleMap 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Assembly Hall : Workstations RO-WS1+2 AL-WS1+2 Ware house CO-WS1 CO-WS2 CA-WS1 SH-WS1+2 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Organisation of Work Stations Clean Room Cold Coupler Area (IS04-CC-WS1) Cold coupler assembly Clean Room String Assembly Area (ISO4-SA-WS1, ISO4-SA-WS2) Roll-out Area (RO-WS1, RO-WS2) HOM adjustment, magnetic shielding, tuners,… 2Ph-tube welding, cold-mass/string connection Alignment Area (AL-WS1, AL-WS2) Cavity and quadrupole fine alignment Coupler shields and braids, tuner electric tests Cantilever Area (CA-WS1) Welding of 4K and 70 K shields, super insulation Insertion into vacuum vessel and string alignment Coupler Area (CO-WS1, CO-WS2) Warm couplers + coupler pumping line Quad current leads Shipment Area (SH-WS1, SH-WS2) Instrumentation Control operations (electrical, RF), “acceptance test” End-caps closing, N-insulation, loading. 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Clean Room : Work Stations Unpacking / packing and cleaning pieces ISO4-SA-WS1 Cavity string assembly (1 string / week) ISO4-SA-WS2 2nd week string assembly Cavity storage Cavity washer ISO4-CC-WS1 Coupler cold part assembly (8 cavities / week) 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Industrialisation of XFEL Cryomodule Assembly Clean Room Layout ISO 7 (class 10 000) 28 m2 5.92 m x 4.72 m ISO 5 (class 100) 38 m2 7.72 m x 4.72 m ISO4 (Class 10) 112 m² 7.8 m x (6.6+7.8) m 15.6 m 30 November2010 Industrialisation of XFEL Cryomodule Assembly

Clean Room constructed (Sept’09) 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Big Tools Fabrication «INFN-DESY» Cantilever system and «FNAL» transfer frame with M8* (no string), May 2010 with PXFEL2, October 2010 (left) (right) 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Big Tools Fabrication «CEA» transfer carriage «INFN-DESY» red girder with PXFEL2 cold mass and cavity string (october 2010) First girder (out of 3 units) + 4 sets of pillars + transfer frame delivered to Saclay in June 2010. Electric transfer carriage delivered to Saclay in Nov. 2010. 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

O. Napoly, XFEL Machine Advisory Committee Phase 2: “XFEL Village” Commissioning with Prototype Modules (PXFEL 2, PXFEL3) 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

2008-2009 : Assembly Training at DESY About two years of observation and participation to the assembly operations on M3***, M8**, PXFEL1-3 at DESY by Saclay staff, including HH-Saclay-HH transports. From Hans Weise’s LINAC’10 presentation: Actually not correct: First training to string assembly (clean room) authorized for PXFEL3. Observation only on PXFEL2 string assembly. 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

Assembly prototyping at Saclay Assembly of XFEL prototype cryomodules (PXFEL2 and PXFEL3) at Saclay aims at: Completing the training of the Saclay team; Commissioning the infrastructure (XFEL Village) The team (~10 persons) has started the disassembly of PXFEL2 on August 24th, with continuous help of DESY staff. Current status on PXFEL2 disassembly and re-assembly: Cavity string rolled-in and out of the clean room Tuners assembly on October 28th String to cold mass (week 45) Cavity alignment (week 50) PXFEL3 assembly from “kit” foreseen for beginning of 2011 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

Assembly prototyping at Saclay Venting of cavity string Coupler dis-assembly 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

Assembly prototyping at Saclay Vacuum vessel roll-outs and roll-ins Cutting of Al thermal shields 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

Assembly prototyping at Saclay Transfer of cold mass + cavity string to clean room hall. (electrical transfer vehicle due next week) 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

Assembly prototyping at Saclay Transfer of cold mass + cavity string on Roll-out Area (cavity posts from DESY) 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

Assembly prototyping at Saclay Roll-in of cavity string in IS04 Area 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

Assembly prototyping at Saclay Tuner assembly

Assembly Prototyping at Saclay Superinsulation blankets try-on

Phase 3: XFEL Module Assembly by an Industrial Contractor 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Ramping up industrial assembly P1: assembly of 3 pre-series modules in sequence for training of the first ½ teams by CEA and DESY personnel, assuming 7 week assembly interleaved by 3 weeks for CMTB qualification. P2: assembly of 5 modules in parallel during a ramp-up period (P2) for training of the second ½ teams by the first ½ teams, assuming 2 week assembly per module. P3: assembly 75 modules in parallel at the rate of 1 module/week. Period 1: assembly of 3 pre-series modules, in sequence, interleaved with CMTB tests Period 2: parallel assembly of 5 modules Period 3: // assembly of 75 modules 1/week 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

O. Napoly, EuCARD RF-Tech Worshop, PSI Summary Christmas early this year, plenty of new toys ! 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

O. Napoly, XFEL Machine Advisory Committee Acknowledgments Considerable help received from DESY, thanks to C. Engling, K. Jensch, W. Maschmann & Cie A. Matheisen, M. Schmöckel & Cie and M. Schlösser, H. Weise, … and from FNAL, thanks to T. Arkan Thanks to my CEA colleagues: S. Berry, J.P. Charrier, P. Contrepois, S. Cozette, M. Fontaine, C. Madec, Y. Sauce, T. Vacher, B. Visentin, and A. Daël, … 11 November 2010 O. Napoly, XFEL Machine Advisory Committee

O. Napoly, EuCARD RF-Tech Worshop, PSI Acknowledgments 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI