2015 Resource Expansion Plan

Slides:



Advertisements
Similar presentations
Analyzing a Junior Mineral Company News June 17, Dr. John-Mark Staude President & CEO.
Advertisements

Gold Rock May 2013 Drill-Ready Gold Property Adjacent to Manitou Gold.
Photo Book: The Deer Trail Mine Story Piute County Utah Q
Growing the Hope Brook Gold Project May 2013 TSX-V: CT OTCQX: CTIIF FRANKFURT: CY4 Member of Forbes & Manhattan Group of Companies.
1CPEAC/EHC CONFERENCE – 8 March 2009 Alberta & Oil: Where it has been and where it is heading for? Peter Yang, M.Sc., P.Eng. Manager, SAGD Specialist Group.
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
1st Quarter 2012 Results May 10, 2012 Tom Mair President and CEO.
SAFE HARBOR Certain statements contained in this presentation regarding Rick's Cabaret future operating results or performance or business plans or prospects.
A Compelling Case. A Focused Vision. October 2006 Unconventional Natural Gas TSX VENTURE: SPI.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
1 NYSE MKT: REE & TSX: RES Bear Lodge Critical Rare Earth Project Technology Metals Summit – March 2013 A Year of Dramatic Change.
Standard Register Fourth Quarter and Full Year 2007 Conference Call February 22, 2008.
Greencastle Resources Ltd. Gold Exploration Battle Mountain Trend, Nevada Oil Royalty = Cash Flow TSX Venture Exchange symbol “VGN”
June 29, 2007 Research Capital Presentation Alex Pannu Iain Brown Jim Simpson John Braden DISCOVERY-CORP ENTERPRISES INC.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
© 2014 Focused on a World Class Discovery. © 2014 Forward Looking Information This presentation contains forward-looking statements, which represent the.
1 Mineral Enterprise Corporation Investor Presentation MINENCO.
TSX: SGR OTCQX: SGRCF 1 SAN GOLD CORPORATION CORPORATE PRESENTATION TSX: SGR OTCQX: SGRCF JUNE 2013.
10 December This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E.
CanAlaska Ventures Ltd This slide show presentation contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States.
NEVADO RESOURCES CORPORATION (TSX-V:VDO) Strategic Metals in Northern Quebec August 2013.
2004 IPAA Oil & Gas Investment Symposium April 21, 2004 New York, NY.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
September 2014| CORPORATE PRESENTATION. This presentation contains forward-looking statements concerning future operations of Falcon Gold Corp. (“the.
FLOW-THROUGH FINANCING Q Safe Harbour Statement Safe Harbour Statement This presentation contains certain forward looking statements, which are.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
TSX-V: OCO Frankfurt: OR6
1 Dutch Gold Resource, Inc. Company Update April 5, 2012 DGRI: OTCQB.
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Commodity Hedging Overview May 10, 2012 The following information is current as of May 10, Memorial Production Partners LP (MEMP) intends to provide.
Investor Presentation. 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Presentation to MineAfrica’s Investing In Africa Seminar March 4, 2008 By Don Willoughby, VP Corporate Development All financial.
Agnico-Eagle Mines Limited Business Review 2005 Building from Strength Sean Boyd President and Chief Executive Officer.
AN EMERGING NEW GOLD DISTRICT THE LAVOIE AND MAISIE DISCOVERIES October 2012.
GIS Services Our long journey to an Enterprise GIS  Brief history of GIS at Noble  Map Requests  Land Focus  Data  Introducing GIS Services  Standards.
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear. Right to acquire.
ATP Oil & Gas Corporation Global Executive Finance for Oil & Gas 2002 May 13-14, 2002 Al Reese, Jr. Senior Vice President & Chief Financial Officer ATP.
SAFE HARBOR Certain statements contained in this presentation regarding Rick's Cabaret future operating results or performance or business plans or prospects.
Symbol: DCY Exchange: TSX-V Current Price $ week Hi-Low $0.37-$0.07 Total Shares Outstanding 27,237,962 Fully Diluted 32,457,962 Market Capitalization.
CERBA Annual Mining Conference 2011 Success in Central Asia John Pearson Vice President, Investor Relations.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
FOURTH QUARTER AND YEAR END 2012 RESULTS. The following is a Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: This press.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
THIRD QUARTER 2012 RESULTS.  Year-over-year revenue growth of 5.5% to $32.0 million, at the high end range of guidance  Adjusted fully diluted EPS of.
Premium Announces Private Placement of Senior Secured Debentures.
Premium Closes $500,000 Non-Brokered Private Placement With Osisko Mining Corporation.
CORPORATE PRESENTATION
First Quarter 2014 Earnings Review
Investor Presentation – SEPTEMBER NGM:TSX-V
Developing a Canadian Gold Deposit
Central Nevada Lithium Brine Projects
EV Battery Metals Nickel Copper Cobalt Lithium
Investor Presentation Acquisition of Folsom Lake Bank April 27, 2017
Standard Register First Quarter 2007 Conference Call April 27, 2007.
Shot Rock Gold Property, Nova Scotia
Central Nevada Lithium Brine Projects
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
BOARD Chris Creagh Mr Creagh is a geologist with more than 30 years of experience in the Australian and international mining industry. Chris brings significant.
SAN LUCAS PROJECT Technical Data 1/18/2019 TSX-V MNN.
Financing Stages (Mining)
Drilling in the Shadow of World-Class Deposits
Capella Resources Ltd TSX.V: KPS December 15, 2009.
2015 Annual Meeting April 30, 2015.
SAN LUCAS PROJECT Technical Data June 25, 2019 TSX VENTURE: MMN.
EL SOL PROJECT Technical Data June 25, 2019 TSX VENTURE: MMN.
TEJAMEN PROJECT Technical Data June 25, 2019 TSX VENTURE: MMN.
PicIORUL ZIMBRULUI & MAGURA NEGRA
Manaila Polymetallic Mine
Presentation transcript:

2015 Resource Expansion Plan OTC:CIBG 2015 Resource Expansion Plan DEVELOPING A MILLION OUNCE GOLD RESOURCE IN NEVADA www.Nevada-Goldmine.com February-March 2015

CAUTIONARY STATEMENT OTC:CIBG www.Nevada-Goldmine.com This presentation contains “forward-looking statements” within the meaning of applicable Canadian securities regulations and Section 21E of the United States Securities Exchange Act of 1934, as amended and the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical fact herein including, without limitation, statements regarding potential resources and reserves, exploration results, production rates and future plans and objectives, are forward-looking statements that involve various risks and uncertainties. Such forward-looking statements include, without limitation, (i) estimates and projections of future gold production and cash operating costs, (ii) estimates of savings or cost reductions, (iii) estimates related to financial performance, including cash flow and capital expenditures, (iv) estimates and projections of reserves and resources, (v)estimates and opinions regarding geologic and mineralization interpretation and (vi) estimates of exploration investment and scope of exploration programs. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements, in particular the estimates do not include input cost increases or gold price variations that could occur in future. Important factors that could cause actual results to differ materially from the companies’ expectations are disclosed in documents filed from time to time with the U.S. Securities and Exchange Commission (SEC). Forward-looking statements are based on the estimates and opinions of management on the date the statements are made, and the companies do not undertake any obligation to update forward-looking statements should conditions or management’s estimates or opinions change. Forward-looking statements are subject to risks, uncertainties and other factors, including gold and other commodity price volatility, political and operational risks, which are described in the companies’ 10K Form on file with the SEC (www.sec.gov) as well as the companies' other regulatory filings.   Cautionary Note to U.S. Investors ‐ The U.S. Securities and Exchange Commission permits U. S. mining companies , in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this presentation, such as “measured”, “indicated”, and “inferred” “resources”, which the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. investors are urged to consider closely the disclosure in our form 10‐K which may be secured from us or our website at http://www.sec.gov/edgar.html James Ashton, P.E., and a Qualified Person as defined by NI 43-101, has reviewed and verified the technical information contained in this article as applicable. CURRENCY: All monetary amounts refer to United States dollars unless otherwise specified. www.Nevada-Goldmine.com February-March 2015

Precious metals oriented junior exploration & production company OTC:CIBG CORPORATE OVERVIEW Precious metals oriented junior exploration & production company Technically strong management team Flagship Property: Independence Mine Project 1 million ounce gold & 4 million ounce silver resource (measured, indicated & inferred) Completed NI 43-101 Technical Report and Update www.Nevada-Goldmine.com February-March 2015

Daniel J. Forbush, CPA President, CEO & Director OTC:CIBG KEY PEOPLE Management Daniel J. Forbush, CPA President, CEO & Director Bryson Goodwin V.P. – Corporate Development, Director Donald J. McDowell, PLS V.P. – Project Development, Director P. Brenton Forbush, CPA Chief Financial Officer Non-Executive Directors Technical Advisers Walter Marting, Jr. Shane K. Dyer Larry Max Bigler Dr. Thom Seal, Phd., P.E.–Metallurgical Jeffrey Rassuchine - Geology James Ashton, P.E. – Mine Engineering, Robin Hendrickson– Geologic Engineer Dr. Steven Garwin, Phd., Chief Geologist William “Bill” Matlack, M.Sc., Geology -Investment Banking www.Nevada-Goldmine.com February-March 2015

INDEPENDENCE PROJECT OVERVIEW OTC:CIBG INDEPENDENCE PROJECT OVERVIEW Located in Lander County, Nevada Total historic drilling: 241 drill holes over 92,680 feet (included in Cibolan Gold’s geological modeling) Cibolan Gold has drilled, logged, and modeled more than 40,000 feet from 128 RC drill holes and 3 core holes Multiple deposits at the property Near surface epithermal system Deep, high-grade underground target Numerous high grade intercepts including several multi-ounce 5 foot intercepts Mineralization open in multiple directions www.Nevada-Goldmine.com February-March 2015

Nevada is the 2nd largest silver producer in the U.S. OTC:CIBG MINING IN NEVADA Nevada is ranked among the Top 10 most favorable mining jurisdictions in the world Nevada is responsible for nearly 80% of annual gold production in the U.S. Nevada is the 2nd largest silver producer in the U.S. Cibolan Gold’ Independence Project is located in the Battle Mountain-Cortez Gold Trend in Lander County www.Nevada-Goldmine.com February-March 2015

PROLIFIC BATTLE MOUNTAIN MINING REGION OTC:CIBG February-March 2015 www.Nevada-Goldmine.com

OTC:CIBG SURROUNDING MINES Encircled by several large scale historic deposits – Fortitude, Marigold, McCoy/Cove, Phoenix, and Sunshine The Fortitude Mine’s historic production totaled 2.2 million ounces of gold and 9.7 million ounces of silver Fortitude is considered to be among the most lucrative mines in Nevada history * The historic Fortitude Mine lies only 4,000 feet northeast of the Independence Mine. www.Nevada-Goldmine.com February-March 2015

The Independence Project sits atop the same trend as the Phoenix Mine OTC:CIBG SURROUNDING MINES: The Phoenix Mine, owned and operated by a major gold producer, flanks the Independence Project on three sides Phoenix Mine annually produces over 250,000 ounces of gold and 900,000 ounces of silver The property contains proven and probable reserves worth in excess of $20 billion The Independence Project sits atop the same trend as the Phoenix Mine * The Phoenix Mine also produces 22 million pounds of copper each year www.Nevada-Goldmine.com February-March 2015

Cibolan Gold Corporation acquired the Independence Project in 2005 OTC:CIBG PROPERTY HISTORY Independence Mine was intermittently in production from 1938 through 1987 Historic production: 11,000 ounces of gold and 750,000 ounces of silver Historic grades: 0.17 ounces gold per ton of and 11.53 ounces of silver per ton Cibolan Gold Corporation acquired the Independence Project in 2005 www.Nevada-Goldmine.com February-March 2015

GEOLOGY AND MINERALIZATION OTC:CIBG GEOLOGY AND MINERALIZATION Three targets of mineralization at Independence Project Multiple near surface epithermal systems A deep high grade, gold rich skarn Potential for a deeper gold-copper porphyry system * Geotechnical gold and silver survey for near-surface epithermal mineralization www.Nevada-Goldmine.com February-March 2015

NEAR SURFACE EPITHERMAL DEPOSIT OTC:CIBG NEAR SURFACE EPITHERMAL DEPOSIT Shallow, open pit mineable target Measured & Indicated resource: 223,300 ounces of gold; 3,784,400 ounces of silver All 131 Cibolan Gold’ drill holes encountered mineralization Strike length of over 3,000 feet and depth of 400 feet Cibolan Gold is on track to complete a Preliminary Economic Assessment by the end of 2015 www.Nevada-Goldmine.com February-March 2015

High-grade, gold rich deep underground target OTC:CIBG DEEP SKARN DEPOSIT High-grade, gold rich deep underground target From a limited number of drill holes, an Inferred resource of 796,000 ounces of gold already has been established Zone of mineralization is more than 1,400 feet wide and 3,400 feet long Potential for multi-million ounce gold resource www.Nevada-Goldmine.com February-March 2015

GOLD COPPER PORPHYRY TREND OTC:CIBG GOLD COPPER PORPHYRY TREND Underlies the Independence Project’s deep skarn target One deep drill hole intercepted 2 oz/t gold This zone appears to be part of the highly prolific Battle Mountain-Eureka Trend, responsible for 23 million ounces of historic gold production The Battle Mountain-Eureka Trend could contain even greater resource potential than the parallel running Carlin Trend, which has produced over 180 million ounces of gold Cibolan Gold is planning to conduct additional deep drilling that could substantially expand the Independence Project’s resource base www.Nevada-Goldmine.com

Cibolan recently undertook a fresh review of the data OTC:CIBG WHAT’S NEW AND WHY NOW Cibolan recently undertook a fresh review of the data Goal: Identify 4 to 5 million tons grading 0.05 ounces per ton to put on the preliminarily engineered leach pad Incorporate known data from other properties in area Focused on near surface, near term production opportunities Identified range front fault system along western edge of current drilling Several holes with multi ounce intercepts drilled west of the fault Tenth ounce or greater intercepts in other holes were on trend Proposed plan to expand this interpretation anticipates identifying up to 2.0 million tons grading an average of 0.30 OPT at a depth of approximately 300-350 feet below the surface www.Nevada-Goldmine.com

New Resource Development Target Zones OTC:CIBG New Resource Development Target Zones High Grade Gold: Range-front Structural Target Area Existing Oxide Au-Ag Resource C-1 Zone & Hill Zone TQP Low Grade Au Porphyry Oxide Resource Expansion Target C-1 Zone Oxide Resource Expansion Target N.E. Structure Target Au Oxide Delineation High Grade Gold N.E. Structure IND-2 Untested Outcropping Gold Zone N.S. Structure Target www.Nevada-Goldmine.com February-March 2015

Geologic Map Showing the Structural Outcroppings OTC:CIBG Geologic Map Showing the Structural Outcroppings (Red inside C-3 unit) indicating the H.G. Range Front Target Area February-March 2015 www.Nevada-Goldmine.com

High Grade Gold Delineation & Confirmation OTC:CIBG High Grade Gold Delineation & Confirmation Proposed Core Drill Locations #1 Priority Proposed High Grade Gold Resource Expansion Delineation Core Drilling Plan X-Section in PPT Hill Resource Zone High Grade Gold: Range-front Structural Target Area IND-2- High Grade Gold N.E. Structure Target PDH Resource Expansion, HG Delineation & New Discovery Target Area www.Nevada-Goldmine.com February-March 2015

High Grade Range Front Discovery Zone OTC:CIBG High Grade Range Front Discovery Zone Conceptual Resource Based on Drill Intercepts www.Nevada-Goldmine.com February-March 2015

Cross Section: 3100 GM-107 GM-108 Slst PDH GM-109 C-1 GM-111 PDH C-3 OTC:CIBG GM-107 GM-108 Slst PDH GM-109 C-1 GM-111 PDH C-3 Slst C-3 C-1 GM-111 Au-Opt Ag-Opt GM111 310 0.049 0.230 GM111 315 0.073 0.235 GM111 320 0.022 0.364 GM111 325 0.052 1.916 GM111 330 0.119 1.714 GM111 335 0.146 1.692 GM111 340 0.039 0.811 GM111 345 0.040 1.004 GM111 350 0.083 0.700 GM111 355 0.081 1.081 GM111 360 0.042 0.912 GM111 365 0.023 0.817 GM111 370 0.018 0.492 GM111 375 1.136 GM111 380 0.056 1.113 GM111 385 0.026 0.976 Slst 100’ C-1 C-1 C-2 High Grade Gold: Range-front Structural Target Area High Grade Gold Hill Resource Zone Slst C-2 C-1 50’ 100’ www.Nevada-Goldmine.com February-March 2015

Cross Section: 3200 C-1 High Grade Gold Hill Resource Zone High Grade OTC:CIBG GM-68 Au-Opt Ag-Opt GM68 230 0.113 6.0 GM68 235 0.052 6.1 GM68 240 0.032 3.1 GM-52 Au-Opt Ag-Opt GM52 080 0.019 0.8 GM52 085 0.025 2.1 GM52 090 0.050 3.1 GM52 095 0.311 3.9 GM52 100 0.034 High Grade Silver Zone with Gold 7.0 opt Ag to 30.0 opt Ag GM-70 Au-Opt Ag-Opt GM70 345 0.012 1.5 GM70 350 0.072 31.7 GM70 355 0.017 3.0 GM-53 GM-24 C-1 GM-25 GM-52 GM-68 GM-69 C-1 PDH GM-70 PDH Slst C-1 C-3 C-2 Slst C-1 High Grade Gold Hill Resource Zone C-3 Range-front Structural Target Area Slst 100’ GM-70 Au-Opt Ag-Opt GM70 375 0.013 0.9 GM70 380 0.016 0.8 GM70 385 0.054 2.8 GM70 390 0.115 3.9 GM70 395 0.028 C-2 Slst 100’ C-1 www.Nevada-Goldmine.com February-March 2015

Cross Section: 3750 GM-73 Slst C-3 GM-128 100’ C-1 PDH C-1 PDH C-3 C-1 OTC:CIBG GM-73 Slst C-3 GM-128 100’ C-1 PDH C-1 PDH C-3 C-1 Slst C-2 C-3 Slst C-1 GM – 73 High Grade Gold Hill Resource Zone High Grade Gold: Range-front Structural Target Area 100’ GM-128 High Grade Gold C-2 GM-73 Au-Opt GM73 350 0.060 GM73 355 0.029 GM73 360 0.369 GM73 365 0.109 GM73 370 0.025 GM73 375 0.012 GM73 380 0.010 GM73 385 0.069 Slst 100’ GM-128 Au-Opt GM128 315 2.897 GM128 320 0.137 GM128 325 0.033 GM128 330 0.021 C-1 C-2 www.Nevada-Goldmine.com February-March 2015

Cross Section: 4100 GM-117 Slst C-1 100’ C-3 PDH PDH GM-127 C-3 PDH OTC:CIBG GM-117 Slst C-1 100’ C-3 PDH PDH GM-127 C-3 PDH Slst C-1 C-3 Slst C-1 High Grade Gold: Range-front Structural Target Area GM-127 FA30 SAMPLES Au-OPT GM127 160 1.586 GM127 165 0.407 GM127 170 0.220 GM127 175 0.123 GM127 180 0.093 GM127 185 0.043 GM127 190 0.012 GM127 195 GM127 200 0.025 C-1 GM-127 High Grade C-1 High Grade Gold Hill Resource Zone C-2 Slst 50’ C-1 C-2 100’ www.Nevada-Goldmine.com February-March 2015

Wilson Independence Project Proposed Budget OTC:CIBG Wilson Independence Project Proposed Budget Direct Resource Development Drilling Costs www.Nevada-Goldmine.com February-March 2015

Cibolan Gold Proposed Budget Overhead and Expansion OTC:CIBG Cibolan Gold Proposed Budget Overhead and Expansion www.Nevada-Goldmine.com February-March 2015

Wilson Independence Project Estimated Timeline OTC:CIBG Wilson Independence Project Estimated Timeline 2015 2016 2017 www.Nevada-Goldmine.com February-March 2015

Wilson Independence Project Production Plan Layout OTC:CIBG Wilson Independence Project Production Plan Layout www.Nevada-Goldmine.com

2.9 Million Average Price $.029 Fully Diluted 25.7 Million OTC:CIBG SHARE STRUCTURE (Week of February 12, 2015) OUTSTANDING Issued 22.9 Million Warrants 2.9 Million Average Price $.029 Fully Diluted 25.7 Million SHARE PRICE MARKET CAP US$ 1.5 Million AVG. TRADING 8,061 shares/day www.Nevada-Goldmine.com February-March 2015

THE Cibolan Gold ADVANTAGE OTC:CIBG THE Cibolan Gold ADVANTAGE Located in Nevada: Gold and Silver mining powerhouse At A Major Mining Company’s Doorstep: The Independence Mine is located at the right address, directly adjacent to the Phoenix Mine Large Gold Resource: NI 43-101 compliant 1 million ounce Measured, Indicated, and Inferred gold resource; additional 4 million ounce silver resource Excellent Logistics: Accessible by all-weather roads; water and commercial power available; skilled workforce in place Strong Technical Team: 100+ years of experience in the mining sector www.Nevada-Goldmine.com February-March 2015

Complete Preliminary Economic Analysis OTC:CIBG FUTURE PLANS Complete Preliminary Economic Analysis Validate the substantial gold and silver values at the Project Provide detailed estimates for equipment, construction, permitting, and operational costs Establish a detailed estimate of mine life, production, and profitability Conduct Additional Drilling Programs Continue drilling programs as to further delineate the near surface epithermal systems and the deep targets Expand the Independence Project’s overall resource base Recapitalize Cibolan Gold Corporation Raise new capital for future exploration and development Acquire a TSX listing for the Company www.Nevada-Goldmine.com February-March 2015

OTC:CIBG FUNDING PROPOSAL www.Nevada-Goldmine.com February-March 2015

Cibolan Gold Corporation OTC:CIBG CORPORATE INFO Cibolan Gold Corporation 1155 West Fourth Street, Suite 210 Reno, NV 89503 Daniel J. Forbush, President & CEO Tel: 775-583-4636 Fax: 775-825-8862 info@nevada-goldmine.com www.nevada-goldmine.com www.Nevada-Goldmine.com February-March 2015