Practical Assessment Project Template – DMADV

Slides:



Advertisements
Similar presentations
Project leader : Champion : Project Number / Phase : Revision / Date :
Advertisements

Lean Six Sigma Project Presentation Template
1 Chapter 3 Project Organization, Selection, and Definition.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
C LO GO. your family site your site here LOG O Six Sigma has become a popular quality performance tool in many organisations to drive out variability,
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
ISO :2011 An introduction 4th October 2012
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
DMADV Review Template. 2 © LSSA 2010 DMADV Roadmap 10 steps model D M A D V 1 – Project Selection / Project Management 2 – Determine Functional Requirements.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
1 OD Motor ALT Chamber. 2 Outdoor Motors Accelerated Life Test Chamber Moataz Elheddeny / TCS Executive Summary Reliability makes it HARDER to stop a.
Welcome to Lean Six Sigma Green Belt Training
Lean Six Sigma: Yellow Belt Advanced © Max Zornada (2012) Process Objective: Establish current/baseline performance or process and quantify customer requirement.
Practical Assessment Project Template
Define Tollgate Checklist
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Project Briefing Type Briefer Organization Here
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
The Hiring Process Define Gate Review 4/7/2016. The Hiring Process Team TEAM CHAMPION: Jerry Visco, HR Director TEAM SPONSOR: Karen Conde, Personnel Manager.
Practical Assessment Project Template
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
Analyze Wrap Up and Action Items
Name: Project: March – April 2017
Product Lifecycle Management
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Six Sigma Approach.
Name: Project: March – April 2017
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
Name: Project: MSD IT – December 2017
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Presented By: <Names> <Team Name> <Date>
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Framework for Success: DMAIC
Certification Project Template
The Define Phase Templates and Worksheets
Project Title Date Location of Kaizen Author.
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Lean Six Sigma Project Name: Project: Date: Intros Expecations
Improve Phase Wrap Up and Action Items
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Measure Phase Wrap Up and Action Items
Name: Project: MSD IT – December 2017
Practical Assessment Project Template – REV. 5.2
QMS, ISO and Six Sigma It’s all related…..
8th Continual Improvement & Innovation Symposium 2016 CASE STUDY COMPETITION: INNOVATION TEMPLATE [ Name of the Organization ] [ Innovation Title ]
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Six Sigma DMAIC Process
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Practical Assessment Project Template – DMADV Project title: <title of the project> Organization: <name of your organization> Project leader: <your name> Belt level: <Black or Green Belt> Revision date: <e.g. 20-07-2016>

DMADV Introduction for this template Objectives of this presentation: Certification by LSSA Project summary for your organization Guidelines: Methodology and logic understandable, for a Lean Six Sigma trained external colleague Clear conclusions on each sheet Target for certification is max. 25 sheets (no limit for internal use) No back-up sheets Delete the (Italic) notes for the user, upon need Delete this slide before handing in.

DMADV Process improvement roadmap DMADV roadmap Define 1 Define and Scope project 2 Determine functional requirements 3 Plan and document project Measure 4 Translate into technical requirements 5 Establish objectives 6 Evaluate measurement system Analyze 7 Develop concept design 8 Identify potential influence factors 9 Develop Y=f(X) function Design 10 Determine optimum design 11 Prototyping / concept 12 Design validation plan Verify 13 Validate design 14 Close out project

DEFINE 1 – Define and scope project Problem Description: Objectives:

DEFINE 1 – Define and scope project Target: In Scope Out of Scope: Deliverables: Hard Benefits: Soft Benefits:

Define 2 – Functional Requirements Determine Functional Requirements

DEFINE 3 – Plan and document project Project Team Supplier: Champion: User: MBB: Project leader (Belt): Name: Role: Responsibility:

DEFINE 3 – Plan and document project SIPOC is mandatory for process improvement For design improvement: visualize product problem area SIPOC Process Map Supplier: Inputs: Process: Outputs: Customers: ‘Process’ Step 1 Step 2 Step 3 Step 4 Step 5

Self Assessment LSSA Assessor Feedback DEFINE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Define 1 Project addresses a clear problem or business opportunity (20k€ / 50k€ p/year). 2 VOC and VOB have been defined clearly. Requirements are understood. 3 Goals have been clearly defined. Project objectives are measurable. 4 Scope of the project has been clearly delineated. 5 Project charter includes the risks to investigate. 6 Relevant KPIs have been selected / CTQ-flowdown has been constructed. 7 High level process description has been made (e.g. SIPOC).   Missing Incorrect Correct N/A Define 1 Project addresses a clear problem or business opportunity (20k€ / 50k€ p/year). 2 VOC and VOB have been defined clearly. Requirements are understood. 3 Goals have been clearly defined. Project objectives are measurable. 4 Scope of the project has been clearly delineated. 5 Project charter includes the risks to investigate. 6 Relevant KPIs have been selected / CTQ-flowdown has been constructed. 7 High level process description has been made (e.g. SIPOC).

MEASURE 4 – Technical Requirements Translate into technical requirements

MEASURE 5 – Objectives Establish objectives

MEASURE 6 – Measurement Procedures Evaluate measurement system

Self Assessment LSSA Assessor Feedback MEASURE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Measure 1 The risk or customer requirement is made tangible and specific (CTQs) 2 Customer requirements have been translated into technical requirements 3 CTQ requirements are clear. 4 It has been defined how the CTQs are measured. 5 The measurement procedure has been validated (GR&R or Monte Carlo simulation)   Missing Incorrect Correct N/A Measure 1 The risk or customer requirement is made tangible and specific (CTQs) 2 Customer requirements have been translated into technical requirements 3 CTQ requirements are clear. 4 It has been defined how the CTQs are measured. 5 The measurement procedure has been validated (GR&R or Monte Carlo simulation)

ANALYZE 7 – Concept Design Develop Concept Design

ANALYZE 8 – Potential influence factors Identify potential influence factors

ANALYZE 9 – Develop Y=f(X) function

Self Assessment LSSA Assessor Feedback ANALYZE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Analyze 1 All risks are identified and a mitigation plan is available (e.g. dFMEA) 2 Design concepts have been develop. 3 Potential factors of influence have been identified. 4 Data has been collected and analyzed. 5 A transfer function Y=f(X) has been developed. 6 The transfer function shows (theoretical) that capability meets customers specifications 7 There is a clear difference between confirmed and non-confirmed information   Missing Incorrect Correct N/A Analyze 1 All risks are identified and a mitigation plan is available (e.g. dFMEA) 2 Design concepts have been develop. 3 Potential factors of influence have been identified. 4 Data has been collected and analyzed. 5 A transfer function Y=f(X) has been developed. 6 The transfer function shows (theoretical) that capability meets customers specifications 7 There is a clear difference between confirmed and non-confirmed information

Design 10 – Optimum Design Determine Optimum Design

Design 11 – Prototyping / Concept Create prototype / concept

Design 12 – Design Validation Plan Make a design validation plan

Self Assessment LSSA Assessor Feedback Design Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Improve 1 Samples, prototypes or concepts are available for validation. 2 Validation plan is designed. 3 Risk mitigation measures are identified (e.g. Poka Yoke, Control Plan) 4 Product Lifecycle management and reliability have been addressed (if applicable). 5 Optimum settings for all significant factors of influence are defined   Missing Incorrect Correct N/A Improve 1 Samples, prototypes or concepts are available for validation. 2 Validation plan is designed. 3 Risk mitigation measures are identified (e.g. Poka Yoke, Control Plan) 4 Product Lifecycle management and reliability have been addressed (if applicable). 5 Optimum settings for all significant factors of influence are defined

Verify 13 – ValidatE Design

Verify 14 – Close out project Conclusions …. Recommendations Lessons learned

Verify 14 – Close out project The realized benefits of this projects are: Champion: Date, Name & Signature - Controller: Date, Name & Signature - LSSA Assessor: Date, Name & Signature -

Self Assessment LSSA Assessor Feedback Verify Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Control 1 Pilot run results have been evaluated 2 Factors of influence will be controlled in a way that the risk will not appear 3 Documentation has been updated (pFMEA, CP, SOPs). 4 Training has been performed for the new product/process. 5 Project report has been completed. Lessons learned have been communicated. 6 Champion has been involved and signed the project. 7 Full scale start-up plan has been developed 8 Belt has shown to be able to manage the project adequately. 9 Project has been completed within time and budget.   Missing Incorrect Correct N/A Control 1 Pilot run results have been evaluated 2 Factors of influence will be controlled in a way that the risk will not appear 3 Documentation has been updated (pFMEA, CP, SOPs). 4 Training has been performed for the new product/process. 5 Project report has been completed. Lessons learned have been communicated. 6 Champion has been involved and signed the project. 7 Full scale start-up plan has been developed 8 Belt has shown to be able to manage the project adequately. 9 Project has been completed within time and budget.