Roundup of Week at ATF Mikey Davis 19 April 2013 1/26.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Analogue BPM data analysis Calibration & resolution results.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1Ben Constance7 th January 2010 FONT5 December 2009 feedback results During the final shift we ran K1-to-P2 position feedback 151.2ns bunch spacing, quadrupoles.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
Further Tracking Studies and March Trip Plan
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Analysis of March ATF Run
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Phase Monitor Electronics: Output vs
Progress towards nanometre level beam stabilisation
Phase Feedforward in 2015 & Plans for 2016
Status of Phase Feedforward Tests
Towards a ground motion orbit feed-forward at ATF2
VELA BPMs Alex Brynes.
Presentation transcript:

Roundup of Week at ATF Mikey Davis 19 April 2013 1/26

Introduction I will give an overview of what happened on the shifts this week and the implications this has Will also give a roundup of the results from yesterday I’m going to try and cover everything so won’t go into anything (including the BPM waveforms etc) in great detail I’m also presenting what I think has happened, I’m not sure everyone will agree Mikey Davis 19 April 2013 2/26

What Happened Started off the shift with tests using an oscilloscope Found that the BPMs are also noisy with the scope Signals were taken with the output of the second stage split One input to the FONT V board The other input to the scope Mikey Davis 19 April 2013 3/26

Scope Test Mikey Davis 19 April 2013 4/26

Scope Test Mikey Davis 19 April 2013 5/26

Scope Test Mikey Davis 19 April 2013 6/26

What Happened We then setup to take data using both the FONT board and the SIS digitiser Decided as we only had 2 channels on the SIS digitiser we should undo BPM signal split and connect both BPMs We then continued with the normal program We decided to centre the beam at IPA due to the ripples at IPB I noticed that the orbit wasn’t flat through the IP so tried to correct this Mikey Davis 19 April 2013 7/26

What Happened The method for flattening the orbit involves QD0FF and QF7FF First centre beam in the BPM where the waist is using QD0FF Then use QF7FF to rotate the beam around the IP Whilst doing this I noticed that the beam moved a lot at IPA but not at all in IPB (in the Honda system) I then realised the jitter was also much larger at IPA then at IPB (in the Honda system) Mikey Davis 19 April 2013 8/26

What Happened We then looked at direct comparison with the EPICs system and Honda system In the EPICs system the beam waist was clearly at IPA, QD0FF magnet strength was also 145A The Honda system however seemed to give the opposite impression We took an access and checked everything was setup correctly in the tunnel and out of it It was, which suggests that what the cable we think gives us IPA is in fact IPB Mikey Davis 19 April 2013 9/26

Summary In EPICs as we record it, and on the control system IPA and IPB are the correct way round In our system, certainly this trip and I think in March IPA and IPB have been back to front Neven and I have evidence to suggest that they were correct in January Our system is setup as we think, and was setup as we thought in March The BPM labels must be back to front Mikey Davis 19 April 2013 10/26

Implications We have now spent considerable time measuring the jitter at the “waist” BPM and getting a number of 4 microns or higher We’ve then put this down to resolution Last night showed us that the real jitter at the non waist BPM is 4 microns We have been measuring the true jitter at that BPM This trip only using one BPM has not helped this This helps make sense of some erroneous results EPICs and Honda no longer have a 60 micron offset Mikey Davis 19 April 2013 11/26

March IPB Waist Scan Mikey Davis 19 April 2013 12/26

March IPB Waist Scan Mikey Davis 19 April 2013 13/26

IPB Waist Scan Last Night Mikey Davis 19 April 2013 14/26

Summary of Jitters Attenuation Setting (dB) IPA Jitter (μm) IPB Jitter (μm) 20 4 1.1 10 3.8 0.4 Calibration not done 0.25 Mikey Davis 19 April 2013 15/26

Two Bunch Mode We decided to capitalise on the BPMs working and switch to two bunch mode Wanted to see if the results were the same Also wanted to look at the correlations Mikey Davis 19 April 2013 16/26

Summary of Correlations Bunch to Bunch Correlations Attenuation Setting (dB) P2 b2b Correlation (%) P3 b2b Correlation (%) IPA b2b Correlation (%) IPB b2b Correlation (%) 10 94 92 45 95 Calibration not done 79 Upstream Downstream First Bunch Correlations Attenuation Setting (dB) P2 IPA Correlation (%) P3 IPA Correlation (%) P2 IPB Correlation (%) P3 IPB Correlation (%) 10 68 57 4 5 Calibration not done 25 24 For this run you get the same even if you’re looking at first bunch to second bunch correlations Mikey Davis 19 April 2013 17/26

Feedback Runs We see a good improvement at IPA, nothing at IPB 3 runs done at 10 dB, 1 run done at 0 dB Mikey Davis 19 April 2013 18/26

FB Run 1 – 10 dB Mikey Davis 19 April 2013 19/26

FB Run 2 – 10 dB Mikey Davis 19 April 2013 20/26

FB Run 3 – 10 dB Mikey Davis 19 April 2013 21/26

FB Run 4 – 0 dB Mikey Davis 19 April 2013 22/26

Feedforward Runs IPK appears to be working fine Only one valid run, others we were just kicking 4000 counts in one direction every time We make it worse for this run Still kicking the beam a long way away from zero We guessed at the calibration constants At 0 dB so expect nothing from IPA Mikey Davis 19 April 2013 23/26

IPK Scan Mikey Davis 19 April 2013 24/26

FF Run 3 – 0 dB Mikey Davis 19 April 2013 25/26

FF Run 1 – 0 dB Mikey Davis 19 April 2013 26/26